Big Cedar-LR 920324March 24, 1992 Project No. 824.1/Report No. 3 Matthews Investments Southwest, Inc. 5220 Spring Valley Road, Suite 500 Dallas, Texas 75240 ATTN: Mr. Tim House Re: Construction Materials Testing Utility Fills Big Cedar Addition Harris Road Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses activities for the period February 28 through March 6, 1992. On February 28, 1992, one sample of material used for utility fill was obtained and returned to the laboratory for development of an optimum moisture-density relationship (Standard Proctor Curve). The test result is attached as Plate 1. During the period of February 28 through March 6, 1992, a total of 16 field density tests were taken on the fill placed within the utility trenches. Test results are shown on Plate 2. Where tested, the materials were found to be in compliance with project specifications. If any questions arise, do not hesitate to call. Sincerely,  y~ROUP Ronald F. Reed, P.E. BES/RFR/aap copies submitted: (2), Matthews Investments Southwest, Inc./ Mr. Tim House (1) Goodwin & Marshall, Inc./Mr. Robert Marshall (1) City of Coppell/Mr. Larry DaVis 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-001u ---~ REED ENGINNERING GROUP 118 116 114 112 110 108 8 10 12 14 16 18 Moisture Content (O/o) Standard Proctor 25 and 12 inch drop using Test performed on minus Boring No. m Location Compaction Test No. 4 blows per each of 3 .. layers, with 5.5 pound hammer 4 inch diameter mold #4 sieve size material Big Cedar Addition, Harris Road, Coppell, Texas De~h-Sample No. Classification Yellowish-brown clayey sand Liquid Limit % Plastic Limit % Plasticity Index Maximum Unit Dry Weight 115.0 Optimum Moisture Content 12.7 OPTIMUM MOISTURE DENSITY CURVE Plate I GEOTECHNICAL CONSU~ ~ reed engineering BIG CEDItR I~DDZTZON HitRRZB ROAD COPPELL, TEY~B REPORT NO. 3 Date 02-28-92 03-03-92 03-06-92 Test No. 22 23 24 25 26 27 28 29 3O 31 32 33 34 35 36 37 Field Density Tests STA No./ Depth Below Unit Final Dry S.G. Weight o+4o/ 0+40/A 0+40/B 0+40/B 2+80/B 2+80/B 2+8o/ 2+8§/A 2+60/C 2+65/C Lot 24/B Lot 5 /A 5+10/A 5+15/ Lot I /A Lot 35/C Com- pac- Moisture tion content Curve Level (%) No. f%) 1.0 106.2 17.8 3 96.3 4.0 105.0 19.6 3 95.2 1.0 108.5 18.0 3 98.3 4.0 113.3 13.6 I 95.1 1.0 107.6 18.6 3 97.6 4.0 107.0 17.9 3 97.0 1.0 107.4 14.2 3 97.4 4.0 110.1 11.3 4 95.7 1.0 109.3 10.7 4 95.0 3.0 109.8 11.3 4 95.5 1.5 110.3 12.5 4 95.9 3.0 110.6 12.9 4 96.2 1.0 111.1 12.8 4 96.6 4.0 111.2 11.8 4 96.7 3.0 110.0 14.6 4 95.7 2.0 110.7 12.7 4 96.3 P1 ate 2 GEOTECHNICAL CONSULTANTS -