Loading...
Blooming Colors-CS 940411 (2)Randy L. Cooper Consulting Engineers 1919 S. Shiloh Road Box 44 Suite 520 Garland, Texas 75042 11 ~pril 1994 Mr. Garreth D. Campbell, Sr. Construction Inspector City of Coppell 255 Parkway Blvd. P.O. Box 478 Coppell, Texas 75019 Re: Concrete Paving Blooming Colors Nursery 1701 E. Beltline Road Coppell, TX 75019 Dear Mr. Campbell, In lieu of 6" of lime stabilization beneath the concrete paving, we have increased the paving thickness to 6". Subgrade is to be prepared as follows: 1. Ail vegetation and organic top soil shall be stripped from the parking area, approximately 6". 2. Soil exposed by the stripping activities in fill areas or transitional areas (fill to cut) should be scarified to a depth on the order of 6 inches, and recompacted at moisture content above optimum value (-1% to 3%) to at least 95 percent of the maximum density determined by Standard Proctor Procedures (ASTM D-698). 3. Fill areas, if required, are to be placed in 9" lifts and compacted as specified in Number 2 above. We believe this will obtain better performance of the paving on this site. very truly yours, Randy L. Cooper, P.E. Consulting Engineer Telephone 214/271 - 1518