Loading...
Blooming Colors-CS 940218BLOONIING COLORS NURSERY AND LANDSCAPING, INC. 1002 Rollin9 Brook Ooppell, TX 75019 (214) 593-8660 February 18, 1994 Mr. Atul Patel, EIT Graduate Engineer City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 RE: SECOND LANDSCAPE REVIEW FOR BLOOMING COLORS NURSERY Dear Mr. Patel: Please find attached the three sets of marked up plans A-1 and A-5 for the third landscape review for Blooming Colors Nursery Addition. Per your letter to me dated February 14, 1994, you require five changes in order for final approval. The attached plans are changed as noted below: 1. I have attached only pages A-1 and A-5. Your January 26, 1994, letter to me on the first review requested the full set of drawings. 2. Your letter stated to relocate the brick pavers to the location shown on the landscape plan so they are flush with the sidewalk and that the handicapped ramps should also be brick paved. This is not required by the City of Coppell Streetscape, the standard construction detail plans or any ordinance of the City. There is not a development in the City of Coppell that has brick pavers flush with the sidewalk or on the handicap ramps. This request is not shown on the attached plans for these reasons. 3. I have attached the monument detail 6/A-2. The meters and backflow preventers are in the R.O.W. 5. I have added the note to require the standard construction details SD-24 and SD-18 on both A-1 and A-5. I will call you Friday morning to discuss these changes and deliver the prints at 1:00 pm. Please contact me directly at 214-393-8660 with any further questions. I am anxious to move forward through this process. Sincerely yo~~ Blooming Colors Nursery and Landscaping, Inc.