Loading...
Austin Place-CS 930726July 26, 1993 Mr. Bill Anderson Dowdey Anderson & Associates, Inc. 16250 Dallas Parkway Suite 100 Dallas, TX 75248 RE: Austin Place Development Fee Assessment Dear Mr. Anderson: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the development fee calculations for Austin Place. Please provide a check made payable to the City of Coppell in the amount of $47,519.85 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the fee assessment list. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us verify payment of the required fees and assure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Michael A Martin E.I.T. cc: Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician CITY OF COPPELL DEVELOPMENT FEES Date: July 26, 1993 Project: Austin Place AMOUNT DUE PRIOR TO TOTAL COUNCIL ASSESSMENT APPROVAL Water Impact Fee $ 25,025.00 $ 25,025.00 (100% due prior to Council Approval) Water Tap Inspection Fee $ 3,700.00 -0- (100%due at Issuance of Building Permit) Wastewater Impact Fee $ 15,750.00 $ 15,750.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee $ 3,500.00 -0- (100%due at Issuance of Building Permit) Utility Final Inspection Fee $ 1,750.00 -0- (100%due at Issuance of Building Permit) Water Meter Fee (Lots) $ 778.75 -0- (100%due at Issuance of Building Permit) Water Meter Fee (Irrigation) $ 84.35 -0- (100%due at Issuance of Water Meters) Water Meter Deposit $1,050.00 -0- (100%due at Issuance of Building Permit) Irrigation Meter Deposit $ 70.00 -0- (100%due at Issuance of Water Meters) Street Sign Fee $ 619.85 $619.85 (100%due prior to Acceptance of Project) Street Light Fee * -0- (100%due prior to Acceptance of Project) Park Fee $12,250.00 $ 6,125.00 (50% due prior to Council Approval) (50%due prior to Issuance of Building Permit) TOTAL $ 64.577.95 $ 47,519.85 TOTAL AMOUNT DUE PRIOR TO $ 47,519.85 COUNCIL APPROVAL + Construction Inspection Fee (2 % of Project Cost due prior to preconstruction meeting) * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL PUBLIC WORKS MEMORANDUM DATE: July 22, 1993 TO: Doug Stevens, Engineering Technicia FROM: Steven G. Goram, Diector of Public RE: Development Fees for Austin Place The following fees should be assessed on the above referenced project. Water Impact Fee: 35 - %" x %" Domestic Meter/s = 35 ESU's 1 - %" x ~" Irrigation Meter/s = 1 ESU's 1 - 1,, Fireline Meter/s = 2.5 ESU's Total 38.5 ESU's @ $650.00 ea = $25,025.00 100% due prior to Council approval of final plat. Wastewater Impact 35 - %" x %" Residential meters = 35 ESU's Total 35 ESU's @ $450.00 ea = $15,750.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 37 Connections @ $100.00 each = $ 3,700.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Sewer Tap Inspection Fee 35 Connections @ $100.00 each = $3,500.00 100% due prior to issuance of building permit. Utility Final Inspection Fee 35 lots @ $50.00/lot = $1,750.00 100% due prior issuance of building permit. Water Meter Fee (Lots) 35 - ~" x %" Residential Meters @ $22.25 ea = $778.75 100% due prior to issuance of building permit. Water Meter Fee (Irrigation) 1 - %" x ~" Irrigation Meters @ $22.25 ea = $22.25 1 - 1" Irrigation Meter @ $62.10 ea = $62.10 Total = $84.35 100% due prior to issuance of water meters. Water Meter Deposit Residential - 35 meters @ $30.00 ea = $1,050.00 100% due prior to issuance of building permit. Irrigation Meter Deposit 1 - ~" meters @ $35.00 ea = $35.00 1 - 1" meters ~ $35.00 ea = $35.00 Total = $70.00 100% due prior to issuance of water meters. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted, $292.60 per light will be assessed. Development Fees Page 3 Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Park Fee Residential Lots @ $150.00 ea = $ Units (Multi-family) @ $75.00 ea = $ For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined; 35 Residential Lots @ $350.00 ea = $12,250.00 Units (Multi-family) at $350.00 ea = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/dm cc: Steven G. Goram Director of Public Works FEES.AUSTIN.HLP Development Fees Page 4 STREET SIGN ASSESSMENT for Austin Place The following assessment is being made in accordance with the city of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $53.10 Speed Limit 63.54 5 $317.70 Yield 58.56 Stop 65.12 Street Name 11.60 Stop & Street Combo 96.85 3 290.55 OTHER No Outlet 11.60 1 11.60 TOTAL $619.85 * Cost breakdowns may be obtained from Public Works by written request. HLP/dm cc: Steven G. Goram Director of Public Works FEES/AUSTIN.HLP