Austin Place-CS 930726July 26, 1993
Mr. Bill Anderson
Dowdey Anderson & Associates, Inc.
16250 Dallas Parkway
Suite 100
Dallas, TX 75248
RE: Austin Place
Development Fee Assessment
Dear Mr. Anderson:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the
development fee calculations for Austin Place.
Please provide a check made payable to the City of Coppell in the amount of $47,519.85 and
forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the fee assessment
list. Please provide our office a copy of the Engineer's Estimate or contract for this project so the
construction inspection fee can be verified.
Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us verify
payment of the required fees and assure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please do not
hesitate to contact me.
Sincerely,
Michael A Martin E.I.T.
cc: Steve Goram, Director of Public Works
Alan Johnson, Acting Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
CITY OF COPPELL
DEVELOPMENT FEES
Date: July 26, 1993
Project: Austin Place
AMOUNT DUE
PRIOR TO
TOTAL COUNCIL
ASSESSMENT APPROVAL
Water Impact Fee $ 25,025.00 $ 25,025.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $ 3,700.00 -0-
(100%due at Issuance of Building Permit)
Wastewater Impact Fee $ 15,750.00 $ 15,750.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee $ 3,500.00 -0-
(100%due at Issuance of Building Permit)
Utility Final Inspection Fee $ 1,750.00 -0-
(100%due at Issuance of Building Permit)
Water Meter Fee (Lots) $ 778.75 -0-
(100%due at Issuance of Building Permit)
Water Meter Fee (Irrigation) $ 84.35 -0-
(100%due at Issuance of Water Meters)
Water Meter Deposit $1,050.00 -0-
(100%due at Issuance of Building Permit)
Irrigation Meter Deposit $ 70.00 -0-
(100%due at Issuance of Water Meters)
Street Sign Fee $ 619.85 $619.85
(100%due prior to Acceptance of Project)
Street Light Fee * -0-
(100%due prior to Acceptance of Project)
Park Fee $12,250.00 $ 6,125.00
(50% due prior to Council Approval)
(50%due prior to Issuance of Building Permit)
TOTAL $ 64.577.95 $ 47,519.85
TOTAL AMOUNT DUE PRIOR TO $ 47,519.85
COUNCIL APPROVAL
+ Construction Inspection Fee
(2 % of Project Cost due prior to
preconstruction meeting)
* This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed
project. Once the plan is submitted, $292.60 per light will be assessed.
COPPELL PUBLIC WORKS
MEMORANDUM
DATE: July 22, 1993
TO: Doug Stevens, Engineering Technicia
FROM: Steven G. Goram, Diector of Public
RE: Development Fees for Austin Place
The following fees should be assessed on the above referenced
project.
Water Impact Fee:
35 - %" x %" Domestic Meter/s = 35 ESU's
1 - %" x ~" Irrigation Meter/s = 1 ESU's
1 - 1,, Fireline Meter/s = 2.5 ESU's
Total 38.5 ESU's @ $650.00 ea = $25,025.00
100% due prior to Council approval of final plat.
Wastewater Impact
35 - %" x %" Residential meters = 35 ESU's
Total 35 ESU's @ $450.00 ea = $15,750.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
37 Connections @ $100.00 each = $ 3,700.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Sewer Tap Inspection Fee
35 Connections @ $100.00 each = $3,500.00
100% due prior to issuance of building permit.
Utility Final Inspection Fee
35 lots @ $50.00/lot = $1,750.00
100% due prior issuance of building permit.
Water Meter Fee (Lots)
35 - ~" x %" Residential Meters @ $22.25 ea = $778.75
100% due prior to issuance of building permit.
Water Meter Fee (Irrigation)
1 - %" x ~" Irrigation Meters @ $22.25 ea = $22.25
1 - 1" Irrigation Meter @ $62.10 ea = $62.10
Total = $84.35
100% due prior to issuance of water meters.
Water Meter Deposit
Residential - 35 meters @ $30.00 ea = $1,050.00
100% due prior to issuance of building permit.
Irrigation Meter Deposit
1 - ~" meters @ $35.00 ea = $35.00
1 - 1" meters ~ $35.00 ea = $35.00
Total = $70.00
100% due prior to issuance of water meters.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric
submits the lighting plan for the proposed project. Once
plan is submitted, $292.60 per light will be assessed.
Development Fees
Page 3
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Park Fee
Residential Lots @ $150.00 ea = $
Units (Multi-family) @ $75.00 ea = $
For those developments having preliminary plat approval prior to
June 23, 1992 the following assessment is determined:
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
For those developments having preliminary plat approval after June
23, 1992 the following assessment is determined;
35 Residential Lots @ $350.00 ea = $12,250.00
Units (Multi-family) at $350.00 ea = $
50% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/dm
cc: Steven G. Goram
Director of Public Works
FEES.AUSTIN.HLP
Development Fees
Page 4
STREET SIGN ASSESSMENT
for Austin Place
The following assessment is being made in accordance with the city
of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY EXTENDED PRICE
No Parking $53.10
Speed Limit 63.54 5 $317.70
Yield 58.56
Stop 65.12
Street Name 11.60
Stop & Street Combo 96.85 3 290.55
OTHER
No Outlet 11.60 1 11.60
TOTAL $619.85
* Cost breakdowns may be obtained from Public Works by written
request.
HLP/dm
cc: Steven G. Goram
Director of Public Works
FEES/AUSTIN.HLP