Loading...
WA9601-CS 980408 (2)SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 FAX TRANSMISSION COVER SHEET Fax Number: 1-817- q3q' ?OOl From: GaryC. Hendricks, P.E. Number of Pages Transmitted (including this one) ] 4 [ Date: April 8, 1998 To: Landmark Structures, Inc. 1665 Hamon Road Fort Worth, Texas 76177 Attention: Joe Swinnea April 24, 1998 Joe: Here is the revised change order form which eliminates the connection of the water line to the existing distribution system and provides for painting the tank bowl on the ground. Please use these quantities and form when submitting your price proposal for this work. As we discussed, the City would like to have the change order agreement completed by no later than May 1, 1998. Give me a call if you hayyny que s. gch / SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue,//820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTEn, P.E. April 24, 1998 GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. Mr. Kenneth M. Griffin, P.E. City Engineer City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Wagon Wheel Ranch Elevated Storage Tank Change Order No. 1 Dear Mr. Griffin: As we discussed, we have modified Change Order No. 1 to you contract with Landmark Structures, Inc., to eliminate connections to the existing distribution system on the Sandy Lake Road Water Line segment across the frontage of the Forest Cove Addition. Further, we have included a lump sum deduct for allowing the contractor to paint the tank bowl prior to final assembly of the roof plates. One copy of the change order is enclosed for your review. We have also forward a copy to the contractor. We have not yet received a price proposal for the extra work. However, our opinion of probable construction cost for this change order is in the range of $240,000 to $250,000. This figure does not include the deduction for the revised tank painting procedure and represents approximately 11 percent of the original contract amount. A detailed copy of our opinion along with the revised construction plans are enclosed for your review. We understand your schedule for completing this change order paper work is May 1, 1998, and are working to have all issues resolved ahead of that date. We are available to discuss this project further at your convenience. Sincerel: Ga(C. Enclosure jg, coppellX96-149\specs~,co !ltr.doc CITY OF COPPELL, TEXAS WAGON WHEEL RANCH ELEVATED STORAGE TANK Project No. WA-96-01 Bid No. Q0198-03 CHANGE ORDER NO. 1 A. INTENT OF CHANGE ORDER The intent of this change order is to modify the provisions of the contract entered into between the City of Coppell, Texas and Landmark Structures, Inc., 1665 Harmon Road, Fort Worth, Texas 76177, for construction of the Wagon Wheel Ranch Elevated Storage Tank, dated March 10, 1998. B. DESCRIPTION OF CHANGE 1. At the pre-construction conference, Landmark Structures requested permission to paint the tank bowl after it is assembled on the ground and before it is hoisted into position. This is contrary to the project requirements for surface preparation of the tank bowl as outlined in SC. 10.C. Surface Preparation, of the Special Conditions to the project specifications which requires the tank to be fully assembled prior to painting. The City of Coppell hereby modifies that requirements of SC. 10.C and will allow exterior and interior painting of the tank bowl once it is assembled on the ground and before it is hoisted into its final position on the tank column. The interior and exterior paint systems on the tank bowl are to be re- blasted and coated to a point no less than 2 -feet from the tank bowl/roof plate seam once the roof plates are welded into position. This change order provides for a lump sum deduct from pay item number one for consideration of procedural changes in the application of the paint coating system. 2. As directed by the City of Coppell, 1,940 linear feet of 24-inch waterline is to be constructed along Sandy Lake Road from Coppell Road to Whispering Hills Drive. The extra work is identified on the Sandy Lake Road Water Line Plans, sheets 7, 8, and 9, marked "Wagon Wheel Ranch, Change Order No. 1, and dated April 24, 1998. The referenced construction plans are now a part of this project. This work is added in an effort to coordinate with construction for a new development in the vicinity. C. EFFECT OF CHANGE ON CONTRACT AMOUNT This change order will have the following effect on the cost of this project: No. Description Quantity This C.O. Quantity Unit Price of Change la Deduct from Lump Sum Pay Item No. I 0 1 1 L.S. for revisions to tank painting procedures 2 Furnish and Install 24" Water Line by 0 1,599 1,599 L.F. including Embedmeat 3 Furnish and Install 24" Water Line by 0 215 215 L.F. other than Open Cut 4 Fumish and Install 24" Water Line with 0 136 136 L.F. 36" Encasemeat Pipe, by other than Open Cut 5 Furnish and Install 8" PVC Water Line, 0 65 65 L.F. with Embedmeat ' ~ity of Coppell "' ~V' Wagon Wheel Elevated Storage 'tank Change Order No. 1 Page No. 2 of 3 No. Description Quantity This C.O. Quantity Unit Price of Change 6 Furnish and Install 24" Butterfly Valve 0 2 2 Ea. 7 Furnish and Install 12" Gate Valve 0 2 2 Ea. 8 Furnish and Install 8" Gate Valve 0 5 5 Ea. 9 Furnish and Install 6" Air and Vacuum 0 I I Ea. Release Valve 10 Furnish and Install 24" Flanged Dished- 0 2 2 Ea. Head Plug 13 Remove & Replace Existing Asphalt 0 70 70 S.Y. Pavement 14 Extra Crushed Stone for Embedment 0 15 15 C.Y. 15 Furnish, Install, Maintain & Removal of 0 1 1 L.S. Erosion Control Devices 16 Furnish, Install &Maintain Traffic 0 1 1 L.S. Control Devices 17 Design & Install Trench Safety Systems 0 1,940 1,940 L.F. Original Contract Amount 2,256,717.00 Change Order No. 1 Revised Contract Amount D. EFFECT OF CHANGE ON CONTRACT TIME The work required under this change order will add calendar days to this project. Original Contract Time 460 calendar days Change Order No. 1 calendar days Revised Contract Time calendar days j:\coppell\96-149Xspecs\co-I doc (4/24/98) Page 2 of 2 · City of Coppell ~ f Wagon Wheel Elevated Storage 'lank Change Order No. I Page No. 3 of 3 E. AGREEMENT By the signatures below, duly authorized agents of the City of Coppell, Texas and Landmark Structures, Inc., do hereby agree to append this Change Order No. 1 to the original contract between themselves, dated March 10, 1998. City of Coppell, Texas Landmark Structures, Inc. Owner Contractor By: By: Date: Date: Attest: Attest: j:\coppell\96-149Xspecs\co-ldoc (4/24/98) Page 3 of 2 SHIMEK, JACOBS & FINKLEA, L.L.P. Project No. 96149 CONSULTING ENGINEERS Client: City of Coppell, Texas Page No. 1 of 1 Project: Wagon Wheel Ranch Elevated Storage Tank Date: 04/24/98 Project No. WA-96-01; Bid No. Q0198-03 By: CHANGE ORDER NO. 1 Item No. Description Quantity Unit Price Amount 2 Furnish and Install 24" Water Line by Open Cut. including Embedme 1,589 L.F. $0.00 3 Furnish and Install 24" Water Line by other than O~pen Cut 215 L.F. $0.00_ 4 24" Water Line with 36" EncasementPipe, by other than Open Cut 136i L.F. $0.00 5 Furnish and Install 8" PVC Water Line, with Embedment 65 L.F. $0.00 6 Fumish and Install24" Butterfly Valve 2, Ea. . $0.00 7 !Furnish and Install 12" Gate Valve 2 Ea. $0.00 8 Furnish and Install 8" Gate Valve 5 Ea. $0.00 9 Furnish and Install 6" Air and Vacuum Release Valve I Ea. $0.00] 10 Furnish and Install 24" Flanged Dished-Head Plug 2 Ea. $0.00 11 Connect to Existing 8"Waterline I Ea. $0.00 ! 12 Cut & Plu~Exist~ 8" Wate~ine 2 Ea. j $0.004 13 Remove &Replace Existing Asphalt Pavement 61 S.Y. $0.00 14 Extra Crushed Stone for Embedment 15 C.Y. $0.00 15 Furnish. Install, Maintain &Removal of Erosion Control Devices I L.S. $0.00 16 Furnish. Install & Maintain Traffic Control Devices I L.S. $0.00 i~n & Install Trench Safe~ Sffstems 1.940 L.F. $0.00 17 Des Subtotal: $0.00 i:~Forms~EstimateNENG-EST I.WK4