July 19, 1996
RE: Ashton Ridge Addition
Development Fee Assessment
Dear Mr. Finley:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of
the Development Fee calculations for Ashton Ridge Addition.
Please make payment to the City of Coppell in the amount of $84.330.00 and forward it to Jennifer
Armstrong, Finance Director, along with a copy of the Fee Assessment list. A copy of the
Engineer's estimate or contract for this project will need to be provided to our department so the
construction inspection fee can be verified
Providing a copy of your paid receipt to our office will help us to verify payment of the required
fees and insure a successful beginning of this project. We look forward to working with you on this
project. If you have any questions, please do not hesitate to contact me.
Sincerely,
Mike Martin E.I.T.
Assistant City Engineer
cc:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
CITY OF COPPELL
.' DEVELOPMENT FEES
Date:
Project:
July 19, 1996
Ashton Ridge Addition
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee 14,400.00 14,400.00
(100% due prior to Council Approval)
Water Tap Inspection Fee 1,400.00 -0-
(100% due at Issuance of Water Meter)
Wastewater Impact Fee 12,150.00 12,150.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee 1,350.00 -0-
(100% due at Issuance of Building Permi0
Utility Final Inspection Fee 1,350.00 -0-
(100% due at Issuance of Building Permit)
Water Meter Fee (Domestic) 626.67 -0-
(100% due at Issuance of Water Meter)
Water Meter Deposit (Non-residential) 810.00 -0-
(100% due at Issuance of Water Meters)
Water Meter Fee (Irrigation & Fire) 134.93 -0-
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit : 35.00 -0-
(100% due at Issuance of Water Meters)
Street Sign Fee information not -0-
(100% due prior to Acceptance of Project) available
Street Light Fee * information not -0-
(100% due prior to Acceptance of Project) available
Park Fee M,695.00 34,695.00
(100% due prior to Council Approval)
Roadway Impact Fee 23,085.00 23,085.00
(100% due prior to Council Approval)
Construction Inspection Fee (Due prior to precon, mtg.) need submittal of -0-
(2% of project cost due for private improvements) contracts
(4 % of project cost due for public improvements)
TOTAL $ 90,036.60
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 84,330.00
* This fee cannot be assessed until after TU Electric submits the lighting plan for the
proposed project. Once the plan is submitted, $292.60 per light will be assessed.
COPPBnr. ENGINEERING
HEHORANDON
DATE
TO:
FROH
RE:
July 2, 1996
Mike Martin, Assistant City Engineer
Ted Dutt, Operations Supervisor
Development Fees for Ashton Ridge
The following fees
referenced project.
Water Impact Fee:
Total
should be assessed and collected on the above
Domestic Meter/s
Irrigation Meter/s =
-- 2 7 ESU ' s
Fireline Meter/s = ESU's
ESU's @ $450.00 ea = ~
100% due prior to Council approval of the final plat.
Wastewater Impact
27 - 5/8" Domestic Meter/s = 27 ESU's
Total ~7 ESU's @ $450.00 ea = $12.150.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
28 Connections @ $50.00 each = $1.400.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
27 Connections ~ $50.00 each = $ ~.350.00
100% due prior to issuance of buildingpermit. (Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
$7 lots @ $ 50.O0/lot = S1.350.00
100% due prior to issuance of building permit.
Water Heter Fee (Domestic)
27 - 5/8" Domestic Meters @ $23.21 = $626.67
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Mete~,el'~ (Irrigation/Fireline) ) ~ ~ , ~ ~
1 - ,~C Irrigation Meter/s @ ~a
- Fireline Meter/s ~ $
Total
100% due prior to issuance of water meter/s.
Water Meter Deposit (Wulti-Family or Non-Residential)
$7 Meters @ $30.00 ~a = $810.00
100% due prior to issuance of water meters.
= ~44~=9S
e~ = $
Irrigation Meter Deposit
1 Meters @ $35.00 ea = $35.00
100% due prior to issuance of water meters.
RO~WAY IMPACT FEE CALCULAi iONS
PROJECT: Ashton Ridge
DATE: 7/3/96
ROADWAY IMPACT FEE:
Service Area
Ca~gor~ **
Land Use **
BuUding Size (Sq.
Development Units **
Vehicle Miles per Development Unit **
Fcc per Vehicle Mile
Roadway Impact Fee due -- (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) =
2
Sin~le-Fnmi}y De~_~__~d
N/A
27
2.85
$_~3,085.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)