Loading...
Ashton Ridge-CS 960719The City With A Beautiful Future Bob Finley Finley Development 16801 Addison Rd., ~250 Addison, TX 75248 P.O. Box 478 Coppell, Texas 75019 214-462-0022 July 19, 1996 RE: Ashton Ridge Addition Development Fee Assessment Dear Mr. Finley: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee calculations for Ashton Ridge Addition. Please make payment to the City of Coppell in the amount of $84.330.00 and forward it to Jennifer Armstrong, Finance Director, along with a copy of the Fee Assessment list. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Mike Martin E.I.T. Assistant City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services CITY OF COPPELL .' DEVELOPMENT FEES Date: Project: July 19, 1996 Ashton Ridge Addition TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee 14,400.00 14,400.00 (100% due prior to Council Approval) Water Tap Inspection Fee 1,400.00 -0- (100% due at Issuance of Water Meter) Wastewater Impact Fee 12,150.00 12,150.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee 1,350.00 -0- (100% due at Issuance of Building Permi0 Utility Final Inspection Fee 1,350.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 626.67 -0- (100% due at Issuance of Water Meter) Water Meter Deposit (Non-residential) 810.00 -0- (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) 134.93 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit : 35.00 -0- (100% due at Issuance of Water Meters) Street Sign Fee information not -0- (100% due prior to Acceptance of Project) available Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Park Fee M,695.00 34,695.00 (100% due prior to Council Approval) Roadway Impact Fee 23,085.00 23,085.00 (100% due prior to Council Approval) Construction Inspection Fee (Due prior to precon, mtg.) need submittal of -0- (2% of project cost due for private improvements) contracts (4 % of project cost due for public improvements) TOTAL $ 90,036.60 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 84,330.00 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPBnr. ENGINEERING HEHORANDON DATE TO: FROH RE: July 2, 1996 Mike Martin, Assistant City Engineer Ted Dutt, Operations Supervisor Development Fees for Ashton Ridge The following fees referenced project. Water Impact Fee: Total should be assessed and collected on the above Domestic Meter/s Irrigation Meter/s = -- 2 7 ESU ' s Fireline Meter/s = ESU's ESU's @ $450.00 ea = ~ 100% due prior to Council approval of the final plat. Wastewater Impact 27 - 5/8" Domestic Meter/s = 27 ESU's Total ~7 ESU's @ $450.00 ea = $12.150.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 28 Connections @ $50.00 each = $1.400.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 27 Connections ~ $50.00 each = $ ~.350.00 100% due prior to issuance of buildingpermit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) $7 lots @ $ 50.O0/lot = S1.350.00 100% due prior to issuance of building permit. Water Heter Fee (Domestic) 27 - 5/8" Domestic Meters @ $23.21 = $626.67 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Mete~,el'~ (Irrigation/Fireline) ) ~ ~ , ~ ~ 1 - ,~C Irrigation Meter/s @ ~a - Fireline Meter/s ~ $ Total 100% due prior to issuance of water meter/s. Water Meter Deposit (Wulti-Family or Non-Residential) $7 Meters @ $30.00 ~a = $810.00 100% due prior to issuance of water meters. = ~44~=9S e~ = $ Irrigation Meter Deposit 1 Meters @ $35.00 ea = $35.00 100% due prior to issuance of water meters. RO~WAY IMPACT FEE CALCULAi iONS PROJECT: Ashton Ridge DATE: 7/3/96 ROADWAY IMPACT FEE: Service Area Ca~gor~ ** Land Use ** BuUding Size (Sq. Development Units ** Vehicle Miles per Development Unit ** Fcc per Vehicle Mile Roadway Impact Fee due -- (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = 2 Sin~le-Fnmi}y De~_~__~d N/A 27 2.85 $_~3,085.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study)