Loading...
Ashton Ridge-CS 960418 (2)CASE: CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT ASHTON RIDGE, PREL ARY PLAT P & Z HEARING DATE: April 18, 1996 C.C. HEARING DATE: May 14, 1996 LOCATION: At the northeast comer of Heartz and Sandy Lake Roads SIZE OF AREA: 7.72 acres CURRENT ZONING: PD-SF-9 (Planned Development, Single Family-9) REQUF_3T: Approval of a Preliminary Plat to allow the development of a 27- lot planned development single family subdivision APPLICANT: Owner: Moneyline Construction Corp. 1301 West Hwy. 407, g201-208 Lewisville TX 75067 214-492-8249 Representative: H.A.P. Engineering & Assoc. 1451 Empire Central #103 Dallas TX 75247 214-630-2005 HISTORY: There is no recent zoning or platting history on this tract. TRANSPORTATION: Sandy l. ake Road is a 2-lane asphalt road shown on the thoroughfare plan as a C4D, four-lane divided thoroughfare to be built in a 95'-wide right-of-way each side of Heartz Road. Heartz Road is a 2-lane undivided collector street within a 60'-wide right- of-way. ~ SURROUNDING LAND USE & ZONING: North South Park Place Addition residential subdivision; "TC" Town Center Church and vacant land; "O" Office and "SF-12" Single Family Residential Item# 18 East - West - Park Place Addition residential subdivision; "TC" Town Center Chaucer Estates residential subdivision; "PD-SF-7" Plarmed Development COMPREHENSIVE PLAN: The 1987 Comprehensive Plan shows the property as part of Town Center. The proposed 1996 Comprehensive Plan shows the property as suitable for low density residential development. DISCUSSION: The proposed preliminary plat is consistent with the proposed planned development district site plan. If the Commission recommends approval of the PD, a similar recommendation regarding the plat, would be appropriate, provided that the recommendation is conditional upon compliance with engineering comments. City Council will need to waive two requirements, however. The cul-de- sac length exceeds the 600' minimum, and Lots 13 through 27 do not have alleys. If the Commission continues the public hearing on the planned development district, the appropriate action regarding the preliminary plat would be to disapprove it, since it would not conform to the zoning in place. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends disapproval of the preliminary plat. ALTERNATIVES: 1) Recommend approval of the Preliminary Plat 2) Recommend disapproval of the Preliminary Plat 3) Recommend modification of the Preliminary Plat ATTACHMENTS: 1) Preliminary Plat 2) Topographic Map and Tree Survey .3) Screen Wall & Planting Plan 4) Departmental Comments Item# 18 DEVELOPMENT R ¥1EW ¢OMMI EE ENGINEERING COMMENTS ITEM: ~a ~ge, ~~ P~. p~ed ~e~~ ~ga f~ ~a on 7. ~ w~s of pm~ ~d ~ ~e ~e~ comer of He~ ~ea of ~ En~ee~g & ~s~s, I~. DRC DA~: M~k 28, 1996 ~ ~ 4, CO.ACT: ~e M~, E. LT., ~~ ~ En~ (~6~) COMMENT STATUS: P°W.~,,~.~'~ Preliminary Plat 1. Show the existing right-of-way for Sandy Lake Road and Heartz Road. 2. Show visibility sight triangles at ail street intersections. 3. Impact fees required. 4. Correct vicinity map with regard to street names. 5. Show the zoning of ail adjacent properties. 6. The plat needs to reflect the proposed street aiigmnent for Ashton Ridge Lane. 7. The detail on the preliminary plat showing the proposed r.o.w clips for sidewalk does not appear to be constructable. This detail needs to be drawn to scaie. As per our review, the sidewalk could not be constructed as shown in the detail at the corner of Ashton Ridge Lane and Ashton Ridge Court due to the location of proposed inlets. Also, it appears as though with the proposed radius, the 3'x3' r.o.w clip is not adequate room to construct the sidewalk. Please provide 10'xl0' r.o.w dips. 8. The note stating "Lot Two shail provide a 15'x15' driveway easement to Lot One for alley access" needs to be removed from the plat. 9. The ailey right-of-way needs to be dedicated in accordance with our Standard Details i.e. radius. Site Plan & Zoning Exhibit 1. Show proposed Sandy Lake Road aiignment. 2. Show right-of-way on ail streets and street names. Storm Drainage Plans 1. Locations of proposed inlets in existing ailey needs to be coordinated with the Engineering Department. 2. Provide positive overflow at all low points.