Loading...
Bethel Estates 1-CS 991203 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-181, Bethel Road Estates, a zoning change request from "C" Commercial to "PD-SF-12" Planned Development, Single Family-12, to allow the development of 2 residential lots on $.2 acres of £roperty located along the north side orE. Bethel Road, approximately 700' east of Hearthstone Lane, at the request of Mary Myers and Fred Joyce. DRC DA TE: November 25, 1999 and December 2, 1999 CONTACT: Milte Martin, P.E., Assistant City Engineer (972-$04-$679) COMMENT STA TUS: Do wr n,rr~ r a r~ v wr~ r a r ,/REVISED AFTER P&Z 1. No development will be allowed in the 100-year floodplain until a flood study is submitted and approved. 2. The minimum finished floor elevation will need to be 1' above the ultimate flood elevation (498.6') per the City Floodplain Management Ordinance. 3. The final grades for the driveways and screening fence will need to be coordinated with the Engineering Department to minimize future conflict with Coppell Road. 4. Due to the typical erosion of creeks, creek embankment stabilization may be necessary. DE VEL OPMENT RE VIE W COMMITTEE ENGINEERING COMMENTS ITEM: Bethel Road Estates, Lots 1 and 2, Block 1, Minor Plat, to allow the development of 2 residential lots on 3.2 acres of property located along the north side of E. Bethel Road, approximately 700' east of Hearthstone Lane, at the request of Landes and Associates, Inc. DRC DATE: November23, 1999 and December 2, 1999 CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-3679) COMMENTSTATUS: r_,r.,~'r rn,rrnra ox/ ~'rr, rar ~'REVISED AFTER P&Z 1. No development will be allowed in 100-year floodplain before a flood study is submitted and approved. 2. Due to the typical erosion of creeks, creek embankment stabilization may be necessary.