Loading...
ST9301-CS010515 Sverdrup Campbell Centre II FAX: 214 696-3499 8150 North Central Expressway Suite M-1150 Dallas, Texas 75206-1815 ~'~'~'~ ~'~) ! MEETING MINUTES DATE: 05/15/01 LOCATION: City of Coppell Engineering Department 255 Parkway Blvd. Coppell, TX 75019 PARTICIPANTS: Ken Griffin - City of Coppell Shannon L. Hebb- Sverdrup Spenta F. Irani- Sverdrup SUBJECT: Sandy Lake Road Project 100% Review Comment C3188800 SUMMARY: 1. Ken suggested to check plans for constructability. He also wanted us to check temporary shoring along driveways with respect to access. 2. Add a note that temporary shoring provides for cross drainage. 3. Subgrade should be 8" thick. 4. Ken wanted to provide a 2% cross slope area 6ft. wide adjacent to curb for future sidewalks on all Typical Sections. Shannon indicated that it would change the cross sections and ditch lines. Cross slopes at 2% adjacent to curb are provided at most of the typical sections as indicated on the plans. 5. Ken wanted to eliminate construction easement and remain within existing ROW wherever possible. It was noted that that would change a lot of the design plans and typical sections. 6. Existing tress shown in some areas have already been removed. 7. Pavers need to be extended in the narrow medians to the point where the medians is 6ft wide. 8. Drainage easement will be required at all outfalls, which changes plats. 9. Provide a minimum of 20' radius at all locations at curb returns for driveways along southside. The radii can be truncated if they do not fit within the area. 10. Remove street lights and inlets between sta 44+70 and 45+70, since a median will be installed later for a future roadway/driveway. 11. Do not strip for bikeway or adjacent to curbs, striping should be only for lane lines. --'12. Replace yellow striping with double white reflectors at 30" cc. 13. Do not show exiSting sanitary sewer line as abandoned. Existing line is to remain active. 14. Storm lines crossing DWU water lines will need to be coordinated with DWU. DWU lines may require additional support at crossing~ or concrete cradle. Campbell Centre II FAX: 214 696-3499 8150 North Central Expressway Suite M-1150 -'~"~-~.~.~."~-~'~.]i,. -Ja~L~' Dallas. Texas 75206-1815 15. Ken wanted a copy of the latest cost estimate. 16. Specifications need to define every pay item clearly. 17. City project number is ST 93-01 for this phase of Sandy Lake Road construction. 18. FEMA has revised latest flood elevations in the area. They have lowered the floor elevation by approximately 2 feet. 19. Ken indicated that the city would require 3 sets half size plans and 1 full size set of drawings. 20. Ken indicated that the city would like to utilize the new parapet standard walls along the culvert crossing. Shannon noted that the way the culvert was designed it would not be feasible to located the walls, unless significant design changes were done. Ken indicated that he also wanted to pursue construction of the bridge instead of a culvert at the location. Shannon replied that the issue was discussed several times with the County and Sverdrup was directed to proceed with the design of the culvert. 21. Shannon will discuss all issues with Dallas County. / Theseminutes are believed accurate and cc~,/e. Please advise the originator, within five Origi~~ CC: Spenta Irani Shannon Hebb PF: C3188800