Boston Chicken-CS 940211 02/11/94 14:44 001
NENORANDUN'
TO: Ken Griffin~ P.E.~ city Engineer ~., ,
FROM; Howard L. Pafford, Utilities superintendent ,
RE; Development Fees for Boston Chicken ~
The following fees should be assessed o;~ the Above referenced
project.
Water Im~ct
I_..- 1 1/2" Domestic/Irrigation Meter/s = 5 ESU'S
Total $ ESU's @ $650.00 ea ~ $3,250.00
100% due prior to Council approval of final plat.
Wastewat~f'
1 - 1 1/2" Domestic meters ~ .... ~.. ESU'$
Total 5 ESU's ~ $450.00 ea =
~00% due prior to Council approval of the final plat.
Water Tap Inspection Fee
1 Connections ~ $100.00 ea~] = $. 100.00
100% due prior to issuance of building permit. (Or in the ca~ of
the irrigation meter-prior to issuance of meter).
Utility Final Inspection Fee
.. ~. lot/s ~ 850.00 ~ $~0.00
100% due prior issuanc~ of building permit.
02/11794 14:44 002
D~v~lo~nt
P~ge 2
Water Meter Fee (Domestic/Irrigation)
~. - .1.1/2" Domestic/Irrigution Meter ~ $157.00
Total = $ 757.00
100% due prior to issuance of building permit.
Water Meter D~posit
1 meters ~ $35.00 ea ~
100% due prior to issuance of building permit.
If you have any questions regarding this assessment please advise.
HnP/dm
xc: Steven G. Goram. Director of Public Works
FEES/BOSTON