Loading...
Boston Chicken-CS 940211 02/11/94 14:44 001 NENORANDUN' TO: Ken Griffin~ P.E.~ city Engineer ~., , FROM; Howard L. Pafford, Utilities superintendent , RE; Development Fees for Boston Chicken ~ The following fees should be assessed o;~ the Above referenced project. Water Im~ct I_..- 1 1/2" Domestic/Irrigation Meter/s = 5 ESU'S Total $ ESU's @ $650.00 ea ~ $3,250.00 100% due prior to Council approval of final plat. Wastewat~f' 1 - 1 1/2" Domestic meters ~ .... ~.. ESU'$ Total 5 ESU's ~ $450.00 ea = ~00% due prior to Council approval of the final plat. Water Tap Inspection Fee 1 Connections ~ $100.00 ea~] = $. 100.00 100% due prior to issuance of building permit. (Or in the ca~ of the irrigation meter-prior to issuance of meter). Utility Final Inspection Fee .. ~. lot/s ~ 850.00 ~ $~0.00 100% due prior issuanc~ of building permit. 02/11794 14:44 002 D~v~lo~nt P~ge 2 Water Meter Fee (Domestic/Irrigation) ~. - .1.1/2" Domestic/Irrigution Meter ~ $157.00 Total = $ 757.00 100% due prior to issuance of building permit. Water Meter D~posit 1 meters ~ $35.00 ea ~ 100% due prior to issuance of building permit. If you have any questions regarding this assessment please advise. HnP/dm xc: Steven G. Goram. Director of Public Works FEES/BOSTON