Burch Lot 2-CS 940919 CITY OF COPPELL
P.O. Box 478
Coppell, TX 75019
ATTN: Atul Patel
Engineerin9 Department
REF: KWIK KAR LUBE & TUNE - Butch Addition, Lot 2, Block A
SUBJECT: Inspection fees to be paid
Dear Mr. Pate1:
Per our phone conver~ation, the work 1,sted below still requires an
Inspection Fee, as discussed.
· Fire Lane ~ 6" concrete with #3 Re,mr ~ 18" O.C.W..w. /'~ /%, -~?/~'o,
24' x 171' = 4,104 sq ~t x ~1.7~ = $7,182.00 x + ~/od'
2% insp fee = $143.64
· sidewalk = 5' x 120' ~ 600 sq ftx $8.00 = $4.800 '00 x ~' ~ '
2% insp fee = $96.00
The followin~ inspection fees have been paid:
· Approach with brick pavers (24' x 30' = 720 sq ftx $6.25 =
$4500.00 x 2% insp fee -- $90.00) Check ~5207 dated 08/25/94
· Utility total co~t $12,465 x 2% inep fee -- $249.00 (~eceipt
If I can be of any further assistance, please feel free to give me a call
at (214)458-9761
sincerely, n
/~ngineering Cooz'dinator
SD;dn
472~; NilI Road D;fH~ls ?~exa$ '~J244 ~14.4~[J.9761 1.800-442-$3(;8 f~tX £14.456-(~948
58 Bg~d SBI~IS~]ONI ~IM~ 86808~PI5 qB :SI §66I/LI/I0