ST1002-CS120203
Page 1 of 2
Rhonda Adloo - Re: Housley Franchise Questions
From: Keith Marvin
To:Espinoza, Patrick
Date: 2/3/2012 4:45 PM
Subject: Re: Housley Franchise Questions
CC:Martym@JRJPaving.com; Odell, Richard; Tad Larson; cjp@freese.com; dr...
Patrick,
I'll get with Time Warner and get a specification on their box.
I don't see anything in the bid documents that indicate the boxes are to be supplied by anyone other than the
contractor. Unless there is a significant difference between the Time Warner box and the Verizon box, we
intend to pay the established unit price for the boxes per our contract with JRJ.
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "Patrick Espinoza" <patricke@jrjpaving.com> 2/3/2012 4:28 PM >>>
Keith,
Can you get me answers to the questions below so we can finish out the revisions?
Thanks.
Patrick,
Pricing for the 17X30 was with Verizon supplying the boxes. Now that I have to supply the 17X30 for Time
Warner and Oncor there will be a price increase. I know what Oncor spec’s are
And do have a price for them but what is Time Warner spec? Example what do they need on the lid-( Telecom,
Communication, Time Warner), open bottom or closed?
Get me the answer for the two questions and I’ll get a price ASAP.
Thanks
Lonnie Binns
Regional Manager
Housley Communications
3122 Kellway Dr.
Carrollton, TX 75006
lbinns@hc-inc.com
Cell 214-354-5899
Office 972-930-0419
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4F706833City_o...4/11/2012
Page 2 of 2
Patrick Espinoza
Estimator
JRJ Paving, LP
1805 Royal Lane, Ste. 107
Dallas, Texas 75229
TEL: 214-466-8340 FAX: 214-466-8354
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4F706833City_o...4/11/2012