Loading...
ST0501-LR120413 APR -13 -2012 04:21 P.01/04 AVA Texas CMT, Inc. Post -its Fax Note 7671 Date # of Construction Materials Testing pages ■ and Environmental Consulting T o L,A I KY I V i S From TQxatS eM .. / co./Dept. /Ns/re Tog co. CE� coo S ii. h�3 10044 Monroe Drive • Dallas, Texas 75229 • (214) 3' Phone #� 972-304- 4 7 Qom( Phone # , Z ( 4, 367 q 5 - 7 G Fax # l7z 304 3570 / Fax #zf - CZ 'Of 72 _ REINFORCING STEEL PLACEMENT REPORT Report Date: April 13, 2012 Test Date: March 27, 2012 Client: City of Coppell 4 ��1- - - Reinforcing Steel Report No. 4 Project: Deforest Road Reconstruction, Coppell, Texas Project Number: 211 -0125 Identification: Reinforcing Steel Observation v'' " City of Coppell Project Number: ST- 056 -01 Method of Test: Visual Observation Page: 1 of 1 Results: On March 27, 2012 reinforcing steel was observed at the following locations 4111(' f' • Retaining Wall Spread Footing from (approximately) Station 18 +74 to + The following discrepancies were noted and called to the attention of Manuel, a representative of California Construction and Larry of City of Coppell. , • Rebar and forms were set up for seven (7) feet tall wall instead of eight (8) feet. Other 'than footing width, nothing else was checked. Rebar steel and concrete , observation tests were cancelled for this date. 00 1 I Gerirc,‹v • Technician: RG J cc: Mr. Larry Davis City of Coppell, Phone: 972- 304 -3684; via Fax: 972 -304 -3570 Mr. George Marshall - City of Coppell, Phone: 972 - 304 -3562; via E -mail: gMarshall @coppelltx.gov Mr. Dan DeGroot - Burgess & Niple, Inc., Phone: 972 - 620 -1255; via E -mail: Dan.DeQroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972 - 289 -0723; via E- mail: rCaudill @TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E -mail: bamobas @yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972 - 670 -0368; via E-mail: Bobby @CalConTex.com Texas CMT, Inc. TBPE Firm: F -4521 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT, Inc. The use of our name must receive cur prior written approval. Our letters and reports apply oniy to the sample tested and/or observed and are not necessarily indicative of of apparently identical of siiitiiar products. • APR -13 -2012 04:21 P.02 /04 Texas CMT Inc. Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352 -6957 • Fax (214) 352 -6972 • www .texascmt.com REINFORCING STEEL PLACEMENT REPORT Report Date: April 13, 2012 Test Date: March 28, 2012 Client: City of Coppell Reinforcing Steel Report No. 5 Project: Deforest Road Reconstruction, Coppell, Texas Project Number: 211 - 0125 Identification: Reinforcing Steel Observation City of Coppell Project Number: ST 056 - 01 Method of Test: Visual Observation Page: 1 of 1 Results: On March 28, 2012 reinforcing steel was observed at the following locations: • Retaining Wall Spread Footing from (approximately) Station 18+74 to 17 There were no discrepancies. .,., • r;5 Technician: RG cc: Mr. Larry Davis'- City of Coppell, Phone: 972 -304 -3684; via Fax: 972 - 304 =3570, . . Mr. George Marshall - City of Coppell, Phone: 972 - 304 - 3562; via E-inail:1MaRhall@coppelltx.gov., _ - Mr. Dan DeGroot - Burgess & Niple, Inc., Phone: 972 - 620 -1255; via Email: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill Tiseo Paving Company, Phone: 972 - 289 -0723; via E -mail: rCaudill@TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E -mail: barnobas @yahoo corn-- - - Mr. Bobby Bounds - California Construction, Phone: 972 - 670 -0368; via E -mail: Bobby @CalConTex.com Texas CMT, Inc. TBPE Firm: F -4521 Reviewed bv: All letters and reports arc for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval ofTexas,eMT, Inc. The use of our name must receive our prior' written approval. Our letters:and'reports apply only to the sample tested and/or observed and are not nece ,ssarilyandicative of rtie'xltgantittes of apparently identical or similar products. • �2 APR -13 -2012 04:21 P.03 /04 ATA Texas CMPT, Inca Construction Materials Testing GEE Consu utants, Inc. ---, and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352 -6957 • Fax• (214) 352.6972 • www .texascmt.com REINFORCING STEEL PLACEMENT REPORT Report Date: April 13, 2012 Test Date: April 2, 2012 Client: City of Coppell //' Reinforcing Steel Report No. 6 Project: Deforest Road Reconstruction, Coppell, Texas Project Number: 211 -0125 Identification: Reinforcing Steel Observation City of Coppell Project Number: ST- 056 -01 Method of Test: Visual Observation Page: 1 of 1 Results: On April 2, 2012 reinforcing steel was observed at the following locations: • Retaining Wall Spread Footing from (approximately) Station 15 +55 to 15 +8. There were no discrepancies. • Technician: RG cc: Mr. Larry Davis - City of Coppell, Phone: 972 - 304 -3684; via Fax: 972- 304 -3570 Mr. George Marshall - City of Coppell, Phone: 972 -304 -3562; via E -mail: gMarshall @coppelltx.gov Mr. Dan DeGroot - Burgess & Niple, Inc., Phone: 972 -620 -1255; via E -mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972 - 289 -0723; via E -mail: rCaudill @TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E -mail: barnobas @yahoo:com Mr. Bobby Bounds - California Construction, Phone: 972 - 670 -0368; via E- mail Bobby@CalConTex.com Texas CMT, Inc. TBPE Firm: F -452I • Reviewed bv: All letters and reports are for the exclusive use of the client to whom they are addressed and sh- . . be reproduced without the full approval of Texas CMT, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or . erved :.d are not necessarily indicative of the quantities of apparently identical or similar products. ;i 7 � # / C� APR -24 -2012 01:31 P.02/03 A A . Texas C 9 Inca , _.. Construction Materials Testing Inc and Environmental Consulting G EE Consultants 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352 -6957 • Fax (214) 352 -6972 • www'.texascmt.com REINFORCING STEEL PLACEMENT REPORT Report Date: April 13, 2012 Test Date: April 10, 2012 Client: City of Coppell Reinforcing Steel Report No. 8 Project: Deforest Road Reconstruction, Coppell, Texas Project Number: 211 -0125 Identification: Reinforcing Steel Observation City of Coppell Project Number: ST 056 - 01 Method of Test: Visual Observation Page: 1 of 1 Results: On April 10, 2012 reinforcing steel was observed at the following locat • Retaining Wall Spread Footing (approximately) Station 15 +02 to 15 +55 There were no discrepancies. Technician: RG cc: Mr. Larry Davis - City of Coppell, Phone: 972 - 304 -3684; via Fax: 972-304-3570 Mr. George Marshall - City of Coppell, Phone: 972 - 304 -3562; via E- mail: :gMarshall@coppelltx.gov . Mr. Dan DeGroot - Burgess & Niple, Inc., Phone: 972- 620 -1255; via E -mail: Dan.DeGroot @BurgessNiple.corri Mr. Robert Caudill Tiseo Paving Company, Phone: 972- 289 -0723; via E- mail: rCaudill@TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E -mail: barnobas@yahno:com -- - --- - Mr. Bobby Bounds - California Construction, Phone: 972- 670 -0368; via E- mail: Bobby @CalConTex.com Texas CMT, Inc. TBPE Firm: F -4521 Reviewed by: .Zrfe All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of,Texas CMT, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative ■of tbe'quautities of apparently identical or similar products. APR -13 -2012 04:22 P.04 /04 C Texas CMT, Inc. ATA Construction Materials Testing GEE Consu I ts, Inc: and Environmental Consulting 10044. Monroe Drive • Dallas, Texas 75229 • (214) 352 - 6957 • Fax (214) 352 -6972 • www .texascmt.com • REPORT OF CONCRETE MIX OBSERVATION Report Dater April 13, 2012 Date Concrete Placed: March -16, 2012 Standard 6 "x121'- Cylinders Client: City of Coppell Cylinder Cross - sectional' Area: 28.27 Square Inches Project- Deforest Road Reconstructions Concrete Report No.:- 9 Contractor: California Construction Project No.: ST- 056 -01 Concrete Supplier and Plant: Redi -Mix Concrete Location of Placement: Retaining Wall Footing MATERIALS Source / SSD Batch Wts OBSERVATION DATA Description (Lbs /CuYd) Mix Number: 10L11504 Time Sample Batched: 11:37 AM Cement: Time Sampled: 12:20 PM Fl Ash: Sample Location: Sta. 19 +25 y Truck / Ticket No: 1237 / 2544286 Coarse Aggregate: Temperature: Intermediate Aggregate: AmbientRange: 73 °F Fine Aggregate: Concrete Range :_ 76 °F Admix ores' t Slump Range (inches): 5.5 - Weather Conditions: Partly Cloudy . Time Started: 11:30 AM 2 Time Completed: . - 1:45 PM ,. Added Water: 10 Gallons Sample Air Content ( %): , 3.6, _, , ,_ Total Cubic Yards Placed: 10 Required Strength (Lbs. /sq.in.): 3,600 • Specimen Measured Age Date Total Load Compressive Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs. /Sq.ln.) . DFR 33 7 3/23/12 103,720 3 DFR34 5 5 28 4/13/12 127,820 " 4 "/ - DFR35 28 4/13/12 126,520 ',4"80 'DFR 36 H Hold - Test Methods Utilized Fracture Regular ASTM C -31, C -39, C -143 (Unles . Otherwise) Cylinders Made By: RG IZumarks and /or Distribution: d I . / ea i '' 2.--- cc: - Mr. Larry Davis - City of •.op p -1' - 'ho e: 972- 0484; via Fax: 972 -304 =3570 Mr. George Marshall - Ci or 'oppell, Phone: 972 - 304 -3562; via E -mail gMars1iall @coppe .gov Mr. Dan DeGroot - Burgess : Niple, Inc., Phone: 972 - 620 -1255; 'Via E =mail: Dan.De :. - B . - • • • • • .. Mr. Robert Caudill Tiseo Paving Company, Phone: 972 - 289 -0723; via E- mail rCa iseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E -mail: barnobas @yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972- 670 -0368; via E - mail: Bobby @CalConTex.com • . Texas CMT, Inc. TBPE Firm: F -4521 Reviewed by: All leners and repots are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. TOTAL P.04