Loading...
ST0501-LR120313 (2) MAR -13 -2012 19:41 P.07 A Texs CMT, Inc. Construction Materials Testing GEE Consultants Ine and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352 -6972 • www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: March 13, 2012 Date Concrete Placed: February 29, 2012 Standard 6 "x12" Cylinders Client: City of Coppell Cylinder Cross - sectional Area: 28.27 Square Inches Project: Deforest Road Reconstruction Concrete Report No.: 4 Contractor: Texas Inlets Inc. Project No.: ST- 056 -01 Concrete Supplier and Plant: TX' / 141 Location of Placement: Inlet Walls & Bottom, Sta. 22 +23.7, 0 +90.6, 26 +17.3 MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs /CuYd) Mix Number: 8274 Time Sample Batched: 1 :36 PM Cement: 6 Sacks Time Sampled: 2:20 PM Fly Ash: Sample Location: Imill. Inlet @ S.E. Corner of Allen Road and Deforest Road Coarse Aggregate: 1" CS Truck / Ticket No: 8041 / 1328731 Intermediate Aggregate: • Temperature: Fine Aggregate: Ambient Range: 78 °F Admixtures: Concrete Range: 76 °F Slump Range (inches): 1.75 1 Weather Conditions: Clear 2 Time Started: 1:00 PM . Added Water: 10 Gallons Time Completed: 4:00 PM Sample Air Content ( %): 4.6 Total Cubic Yards Placed: 10 Required Strength (Lbs. /sq.in.): _ 4.000 Specimen Measured ge Date Total Load Compressive S . vi Remarks Number Slump (in.) + ays) Tested (Lbs.) (Lb = . DFR 13 7 3/7/12 144,780 5,120 DFR 14 28 3/28/12 DFR 15 1.75 28 3/28/12 DFR 16 H Hold Test Methods Utilized Fracture. Regular Cylinders Made By 41f ASTM C -31, C -39, C 143 (Unless Noted Otherwise) C Remarks and /or Distribution: cc: Mr. Larry Davis -City of Coppell, Phone: 972 -304 -3684; via Fax: 972 - 304 -3570 / Mr. George Marshall - City of Coppell, Phone: 972 - 304 -3562; via E -mail: gMar i all' coppelltx.gov Mr. Dan DeGroot - Burgess & Niple, Inc., Phone: 972 - 620 -1255; via E -mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972 -289 -0723; via E -mail: rCaudill @TiseoPaving.com Mr. Bobby Bounds - California Construction, Phone: 972 - 670 -0368; via E -mail: Bobby @Ca1C nTex.co 3 tet 001 Al Texas CMT, Inc. TBPE Firm: F -4521 Reviewed by: 4/4-- All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT, Inc. The use of our name must receive our prior written approval_ Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. MAR -13 -2012 19:41 P. c AVT Texas CMT, Inca Construction Materials Testing GEE Consultants Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352 -6957 • Fax (214) 352-6972 • www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: March 13, 2012 Date Concrete Placed: March 2, 2012 Standard 6 "x12" Cylinders Client: City of Coppell Cylinder Cross - sectional Area: 28.27 Square Inches Project: Deforest Road Reconstruction Concrete Report No.: 6 Contractor: Texas Inlets Inc. Project No.: ST- 056 -01 Concrete Supplier and Plant: TXI / 141 Location of Placement: Alley Inlet Top MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs /CuYd) Mix Number: 8274 Time Sample Batched: 1:32 PM Cement: 6 Sacks Time Sampled: 2:10 PM Fly Ash: Sample Location: Inlet Top @ Sta. 24 +36.4 Truck / Ticket No: 7065 / 1330859 Coarse Aggregate: 1" CS Temperature: Intermediate Aggregate: Ambient Range: 67°F Fine Aggregate: Concrete Range: 73 °F Admixtures: Slump Range (inches): 3.25 • Weather Conditions: Clear 1 Admix / AEA Time Started: 12:45 PM 2 - Time Completed: 3:15 PM Added Water: 25 Gallons Sample Air Content ( %): 4.2 Total Cubic Yards Placed: 5.5 Required Strength (Lbs. /sq.in.): 4,000 Specimen Measured Age Date Total Load Compressive Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs. /S.. • ' DER 21 7 3/9/12 139,800 ',• 0 DFR22 28 3/30/12 DFR 23 3.25 28 3/30/12 � 3/ilill DFR 24 H Hold ee Test Methods Utilized Fracture Regular /' fsMadeBy. ASTM C -31, C -39, C -143 (Unless Noted Otherwise) RG Remarks and/or Distribution: cc: Mr. Larry Davis - City of Coppell, Phone: 972 -304 -3684; via Fax: 972- 304 -3570 Mr. George Marshall - City of Coppell, Phone: 972 - 304 -3562; via E -mail: gMarshall @coppelltx.gov Mr. Dan DeGroot - Burgess & Niple, Inc., Phone: 972 - 620 -1255; via E -mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972 - 289 -0723; via E -mail: rCaudill@TiseoPaving.com Mr. Bobby Bounds - California Construction, Phone: 972 - 670 -0368; via E -mail: Bobby @Ca1ConTex.com 451/910-ert 0 -- 2 ,p) A . L _____ Texas CMT, Inc. TBPE Firm: F -4521 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. MAR -13 -2012 19:42 P.10 c AVA Texas CMT, Inc Construction Materials Testing GEE COflSU , Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352 -6972 • www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: March 13, 2012 Date Concrete Placed: March 5, 2012 Standard 6 "x12" Cylinders Client: City of Coppell Cylinder Cross - sectional Area: 28.27 Square Inches Project. Deforest Road Reconstruction Concrete Report No.: 7 Contractor: Texas Inlets Inc. • Project No.: ST -056 -01 Concrete Supplier and Plant: TXI / 142 Location of Placement: Inlets @ Sta. 25 +80.5, 28 +54.14, 30 +62.5, 25 +18.3 MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs /CuYd) Mix Number: 8274 Time Sample Batched: 1:19 PM Cement: 6 Sacks Time Sampled: 2:10 ',, Fly Ash: Sample Location: unction Box Truck / Ticket No: ' ' - Coarse Aggregate: 1" CS Temperature: Intermediate Aggregate: • Ambient Range: 75 °F Fine Aggregate: Concrete Range: 74 °F Admixtures: Slump Range (inches): 2.5 • Weather Conditions: Clear 1 Admix / AEA Time Started: 1:00 PM 2 Time Completed: 3:45 PM . Added Water: 8 Gallons Sample Air Content (%): 4.2 Total Cubic Yards Placed: 6 Required Strength (Lbs. /sq.in.): 4,000 Specimen Measured Al Date Total Load Compressive Strength Remarks Number Slump (in.) Tested (Lbs.) bs. /S.. DFR 25 3/12/12 136,960 4,840 DFR26 2 5 4/2/12 DFR27 28 4/2/12 DFR 28 H Hold Test Methods Utilized Fracture Regular Cylinders Made By: RG ASTM C -31, C -39, C -143 (Unless Noted Otherwise) Remarks and /or Distribution: cc: Mr. Larry Davis - City of Coppell, Phone: 972 - 304 -3684; via Fax: 972 -304 -3570 Mr. George Marshall - City of Coppell, Phone: 972 -304 -3 . 'a E -mail: gMarshall @coppelltx.gov Mr. Dan DeGroot - Burgess & Niple, Inc., Phone: 97 , . - .- via E -mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Ph. • / 4 723; via E -mail: rCaudill @TiseoPaving.com Mr. Bobby Bounds - California Construction, ' of 9 -. �I -0368; via E -mail: Bobby@ alConT .com . ide eiv 3 iy ee I-1-- Texas CMT, Inc. TBPE Firm: F -4521 Reviewed by: ( 0--- , elif All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT, inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. TOTAL P.10