CITY OF COPPELL Vanbebber Drive Street Improvements, Project Tax 2011B JQ Infrastructure By: LBH Date: 4 -3 -12 PRELIMINARY Item# Description Unit Quantity Unit Cost Subtotal Vanbebber Drive 101 -A MOBILIZATION LS 1 $ 25,000.00 $ 25,000.00 102 -A PROJECT SIGNS EA 2 $ 500.00 $ 1,000.00 103 -A RIGHT -OF -WAY PREPARATION LS 1 $ 2,000.00 $ 2,000.00 104 -A REMOVE & DISPOSE EX. CONCRETE PAVEMENT SY 5988 $ 8.00 $ 47,904.00 105 -A REMOVE & DISPOSE EX. CONC. DRIVEWAYS, ALLEYS, & SIDEWALKS SY 1177 $ 6.00 $ 7,062.00 106 -A 8" LIME TREATED SUBGRADE SY 6321 $ 2.00 $ 12,642.00 107 -A HYDRATED LIME (40 LB /SY) TON 127 $ 150.00 $ 19,050.00 $ - $ 109 -A 8" REINFORCED CONCRETE PAVEMENT WITH 6" INTEGRAL CURB SY 5394 $ 65.00 $ 350,610.00 110 -A 6" REINFORCED CONCRETE DRIVEWAY /ALLEY PAVEMENT SY 647 $ 50.00 $ 32,350.00 $ - $ 112 -A 4" REINFORCED CONCRETE SIDEWALK SY 725 $ 35.00 $ 25,375.00 113 -A BARRIER FREE RAMP EA 12 $ 1,000.00 $ 12,000.00 114 -A VARIABLE HEIGHT RET. WALL W /INTEGRAL SIDEWALK LF 143 $ 50.00 $ 7,150.00 $ - $ 116 -A PAVEMENT MARKINGS LS 1 $ 500.00 $ 500.00 117 -A TRAFFIC BUTTONS LS 1 $ 1,000.00 $ 1,000.00 118 -A PREPARE TRAFFIC CONTROL PLAN AND IMPLEMENT LS 1 $ 5,000.00 $ 5,000.00 119 -A PREPARE AND IMPLEMENT STORM WATER POLLUTION PREVENTIO LS 1 $ 3,500.00 $ 3,500.00 120 -A RESTORE PARKWAYS & DISTURBED AREAS LS 1 $ 7,500.00 $ 7,500.00 $ - $ 122 -A 10' STANDARD CURB INLET EA 10 $ 3,500.00 $ 35,000.00 $ - $ - $ - $ 125 -A 18" REINFORCED CONCRETE PIPE (CL III) LF 57 $ 50.00 $ 2,850.00 $ - $ $ - $ - $ - $ 129 -A 6" PVC C -900 DR -14 WATER LINE LF 167 $ 30.00 $ 5,010.00 130 -A 8" PVC C -900 DR -14 WATER LINE LF 1541 $ 40.00 $ 61,640.00 $ - $ - $ - $ $ - $ $ - $ - $ - $ 136 -A 6" GATE VALVE EA 5 $ 1,000.00 $ 5,000.00 137 -A 8" GATE VALVE EA 8 $ 1,250.00 $ 10,000.00 $ - $ 139 -A INSTALL NEW FIRE HYDRANT AND VALVE ASSEMBLY EA 5 $ 4,000.00 $ 20,000.00 $ - $ 141 -A ABANDON EXISTING WATER LINE LS 1 $ 5,000.00 $ 5,000.00 $ - $ - $ - $ $ - $ - $ - $ - $ - $ - ......._ ..... _ ............... .... _ . ...... .. $ - $ $ - $ - $ - $ 150 -A TRENCH SAFETY SYSTEM (ALL UTILITY CONSTRUCTION) LF 1765 $ 2.00 $ 3,530.00 151 -A REPAIR/REPLACE /MODIFY EX. IRRIGATION SYSTEMS LS 1 $ 2,500.00 $ 2,500.00 $ - $ $ - $ $ - $ 155 -A REMOVE AND RESET LANDSCAPING LS 1 $ 2,500.00 $ 2,500.00 $ - $ - $ - $ - $ - $ 159 -A REMOVE & DISPOSE EX. STORM DRAIN INLET & PIPE EA 9 $ 1,000.00 $ 9,000.00 $ - $ - Plus 10% Contingenies = $ 72,167.30 Construction Total = $ 793,840.30