Red Hawk-LR120317 ALPHA /N,TESTI N G REPORT OF FIELD
2209 Wisconsin Street, Suite 100 COMPACTION TESTS
Dallas, Texas 75229
Geotechnical 1 Construction Materials! Environmental
www.alphatesting.com
TBPE Firm No. 813
I
TESTED FOR: Creststone Group DATE: 03/17/12
Coppell, Texas
PROJECT: Red Hawk Residential OUR REPORT NO.: 110991 -98
Coppell, Texas
TEST DATA: TECHNICIAN: Jamshid Ranjbaran
O PTIMUM MAXIMUM LAB IN PLACE IN PLACE
TEST ELEV. SOIL ID PERCENT
DATE MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMMENT*
NO. DEPTH NUMBER % PCF % PCF COMPACTION
870 03/17/12 FG -0.5 2 17.0 106.8 19.8 105 98 1 -A
871 03/17/12 FG 2 17.0 106.8 21.1 103 96 1 -A
872 03/17/12 FG -0.5 2 17.0 106.8 22.0 102 95 1 -A
873 03/17/12 FG 2 17.0 106.8 20.1 103 97 1 -A
874 03/17/12 FG -0.5 2 17.0 106.8 20.9 104 98 1 -A
875 03/17/12 FG 2 17.0 106.8 22.0 103 96 1 -A
876 03/17/12 FG -0.5 2 17.0 106.8 20.3 103 97 1 -A
TEST LOCATION: Building Pad
870 30' N and 20' E from the SW Corner of Block A, Pad 19
871 30' N and 20' E from the SW Corner of Block A, Pad 19
872 60' N and 30' E from the SW Corner of Block A, Pad 20
873 60' N and 30' E from the SW Corner of Block A, Pad 20
874 40' N and 40' E from the SW Corner of Block A, Pad 21
875 40' N and 40' E from the SW Corner of Block A, Pad 21
876 50' N and 20' E from the SW Corner of Block A, Pad 22
1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS
2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted,
4. CEMENT TREATED D. RETEST , i
Yonas Tanga
ALPHA TESTING, INC.
Our test results and reports are for the exclusive use of the Client (and their designated recipients on fiie in our office) and shall not be reproduced andior distributed except with express approval of ALPHA. The
use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar
specimens.
ALPHA 0,\TESTING REPORT OF FIELD
2209 Wisconsin Street, Suite 100
COMPACTION TESTS
Dallas, Texas 75229
Geotechnical 1 Construction Materials! Environmental
www.alphatesting.com
TBPE Firm No. 813
TESTED FOR: Creststone Group DATE: 03/17/12
Coppell, Texas
PROJECT: Red Hawk Residential OUR REPORT NO.: 110991-98A
Coppell, Texas
TEST DATA: TECHNICIAN: Jamshid Ranjbaran
O PTIMUM MAXIMUM LAB IN PLACE IN PLACE
TEST ELEV. SOIL ID PERCENT
DATE MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMMENT*
NO. DEPTH NUMBER PCF % PCF COMPACTION
877 03/17/12 FG 2 17.0 106.8 20.8 102 96 1 -A
878 03/17/12 FG -0.5 2 17.0 106.8 19.0 105 98 1 -A
879 03/17/12 FG 2 17.0 106.8 21.3 102 95 1 -A
880 03/17/12 FG -0.5 2 17.0 106.8 20.9 103 97 1 -A
881 03/17/12 FG 2 17.0 106.8 19.9 102 95 1 -A
882 03/17/12 FG -0.5 2 17.0 106.8 19.5 104 97 1 -A
883 03/17/12 FG 2 17.0 106.8 20.6 103 97 1 -A
TEST LOCATION: Building Pad
877 50' N and 20' E from the SW Corner of Block A, Pad 22
878 40' N and 30' E from the SW Corner of Block A, Pad 23
879 40' N and 30' E from the SW Corner of Block A, Pad 23
880 60' N and 20' E from the SW Corner of Block A, Pad 24
881 60' N and 20' E from the SW Corner of Block A, Pad 24
882 30' N and 35' E from the SW Corner of Block A, Pad 25
883 30' N and 35' E from the SW Corner of Block A, Pad 25
1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS
2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted,
4. CEMENT TREATED D. RETEST , i
< S /,/ _
Yonas Tanga
ALPHA TESTING, INC.
Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and /or distributed except with express approval of ALPHA. The
use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and /or observed, and are not indicative of the qualities of apparently identical or similar
specimens.
ALPHA 01 E STI N G REPORT OF FIELD
2209 Wisconsin Street, Suite 100
COMPACTION TESTS
Dallas, Texas 75229
Geotechnical 1 Construction Materials I Environmental
www.alphatesting.com
TBPE Firm No. 813
TESTED FOR: Creststone Group DATE: 03/17/12
Coppell, Texas
PROJECT: Red Hawk Residential OUR REPORT NO.: 110991 -98B
Coppell, Texas
TEST DATA: TECHNICIAN: Jamshid Ranjbaran
O PTIMUM MAXIMUM LAB IN PLACE IN PLACE
TEST ELEV. SOIL ID PERCENT
DATE MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMMENT*
NO. DEPTH NUMBER PCF % PCF COMPACTION
884 03/17/12 FG -0.5 2 17.0 106.8 19.6 104 97 1 -A
885 03/17/12 FG 2 17.0 106.8 19.4 103 97 1 -A
TEST LOCATION: Building Pad
884 20' N and 30' W from the SE Corner of Block A, Pad 26
885 20' N and 30' W from the SE Corner of Block A, Pad 26
1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS
2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted,
4. CEMENT TREATED D. RETEST / /
Yonas Tanga
ALPHA TESTING, INC.
Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and /or distributed except with express approval of ALPHA. The
use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and /or observed, and are not indicative of the qualities of apparently identical or similar
specimens.
ALPHA / TESTING DAILY FIELD
REPORT
2209 Wisconsin Street, Suite 100
Dallas, Texas 75229
Geotechnical I Construction Materials I Environmental
www.alphatesting.com
TBPE Firm No. 813
TESTED FOR: Creststone Group DATE: 03/17/12
Coppell, Texas
PROJECT: Red Hawk Residential OUR REPORT NO.: 110991 -99
Coppell, Texas
TECHNICIAN: Jamshid Ranjbaran
WEATHER: Sunny TEMPERATURE RANGE : 60° to 80°
The Alpha technician traveled to the above referenced site to monitor on -going work and perform field testing as requested.
While on site the technicain verified plastic sheeting placed at Block A, Pad 19 through 26 per the recommendation in the project
qeotechnical report.
Hermilo was informed of all observations and field test results.
Respectfully Submitted,
Yonas Tanga
ALPHA TESTING, INC.
Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and /or distributed except with express approval of Alpha. The use of our name and
test results must receive our written approval. Test results and reports apply only to the samples tested and /or observed, and are not indicative of the qualities of apparently identical or similar specimens.