Loading...
Willow Park-LR120328 8908 Ambassador Row, Dallas, TX 75247 Rone Engineering 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: JR Rose Development Companies Report No.: 407598 2209 Cameron Crossing Project No.: 1116815 Grapevine, TX 76051 4. '` ilia/ Date of Service: 02/28/2012 ` , f Report Date: 03/28/2012 Project: Willow Park Townhomes - r' Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for c ri g and testing in accordance with applicable standards. PROJECT DATA Contractor: � Design I.D.: 1565 Measured .02 Concrete Supplier: Southern Star '5 tv ` Placement Date: 02/28/2012 Slump Plant: 111 Weather Conditions: Cloudy (inches) Specification Requirements Time Sampled: 04:15pm Batch time: 03:36pm 3.5 Strength: 3,500 psi @ 28 days Temperature - Air: 72 °F Concrete: 72 °F Slump (in.): 4" max Truck No: 6018 Ticket No: 1986151 Air ( %): 3% - 6% Air Content: 3.8% Unit Weight (pcf): NA Test Method: ASTM C -172 Overall Placement Location: ASTM C -31 (except 10.1.2) Culvert headwalls, Rembrant and Davenci ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 Sample Location: ASTM C -1231 After Rembrant and before Davenci REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in (Ibs) (psi) Type 1 1 03/06/2012 7 5.99 28.18 110,810 3,930 Type 5 1 2 03/27/2012 28 5.99 28.18 145,860 5,180 Type 5 1 3 03/27/2012 28 5.99 28.18 143,440 5,090 Type 2 1 El..L..iu NI Average 5,130 Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Technician: Jack Roberts Started: 02:15pm Finished: 05:45pm Rone Engineering Report Distribution: Orig: JR Rose Development Companies (Grapevine, TX) Attn: Mr. Jason Rose (1 -ec copy) 1 -ec Rone Project Manager Attn: Mr. Jason Creasy AET - 1 -ec City of Coppell Attn: Mr. Mike Garza Jason Creasy, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DM /JC) Page 1 of 1