Loading...
ST1002-EM111215 Page 1 of 1 Keith Marvin - Old Town Coppell Fee Breakout From:   Dan Prendergast <drp@freese.com> To:   Keith Marvin <kmarvin@coppelltx.gov> Date:   12/15/2011 11:13 AM Subject:   Old Town Coppell Fee Breakout CC:   Tricia Hatley <thh@freese.com> Attachments:   Copy of CPL09446_City-Developer Fee 12-15-11.pdf   Keith,   Attached is the updated fee breakout for Old Town Coppell.    When I looked at Greg’s percent of construction cost without Bethel, his impact was 30%.  However, if I took out all of the franchise utility costs (currently shown as his responsibility) his impact dropped to 20%.  The final $82,039 fee is 21.8% of the total fee ($376,600) so it falls within that 20%-30% threshold of construction costs.   Thanks, Dan   Please consider the environment before printing this message. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4EE9D64FCity_...4/20/2012 Project:CPL09446 City of Coppell - Old Town Coppell Infrastructure Improvements (South of Bethel Road, West of Coppell Road) PhaseCitDeveloper y PhaseFeeResponsibilitResponsibilit yy Geotechnical Soil Report$4,600.00$4,600.00$0.00 Preliminary Design Phase$60,000.00$51,159.00$8,841.00 Final Design Phase$134,000.00$114,255.00$19,745.00 Construction Administration$8,500.00$7,247.00$1,253.00 Contract Change #1 - Design Roadway Improvements. $31,500.00$31,500.00$0.00 Approved 4/26/10 Contract Change #2 - Design, Utility Coord, Landscape, Survey$73,200.00$47,000.00$26,200.00 pproved 4/13/11 A $36,000.00$10,000.00$26,000.00 Contract Change #3 - Design pproved 4/27/11 A $4,900.00$4,900.00$0.00 Contract Change #4 - Street Light Design pproved 6/10/11 A $23,900.00$23,900.00$0.00 Contract Change #5 - Parking Lot Design pproved 11/17/11 A $294,561.00$82,039.00 Total Project:$376,600.00 Notes: 1. Contract Change #2: City portion changed from $26,175 to $47,000. Reasons for change include moving retail water and sewer main design fee of $10,825 from developer to City. Also added $10,000 to City portion for water and sewer mains in townhome alleys (new total = $47,000). 2. Contract Change #3: City portion changed from $0 to $10,000. Reasons for change include moving $5,000 to City portion for cost estimating and breakouts (new total = $5,000). Also added $5,000 to City portion for water and sewer main design in alley between Burnet and Main St (new total =$10,000).