Certainly.
I'd like to deliver the lots without any big equipment returning to the site
once the franchise pedestals and handholes are in place.
It shouldn't take Darling long to determine their foundation design from the
Terracon report.
Gregory K. Yancey
Provident Company
(214) 215-9400 v
(214) 276-1709 f
gregyancey@verizon.net
-----Original Message-----
From: Keith Marvin [mailto:KMARVIN@coppelltx.gov]
Sent: Wednesday, January 11, 2012 7:08 AM
To: Mindi Hurley; gregyancey@verizon.net
Subject: Re: RE: Townhome Grading
If there is, is that something you would want JRJ to do?
-----Original Message-----
From: "Greg Yancey" <gregyancey@verizon.net>
To: Keith Marvin <KMARVIN@coppelltx.gov>
Sent: 1/11/2012 6:34:53 AM
Subject: RE: RE: Townhome Grading
I don't foresee any, but Darling is waiting on me. I hope the Terracon
guys
can state the PVR today in their report so we can get it to Darling.
Gregory K. Yancey
Provident Company
(214) 215-9400 v
(214) 276-1709 f
gregyancey@verizon.net
-----Original Message-----
From: Keith Marvin [mailto:KMARVIN@coppelltx.gov]
Sent: Wednesday, January 11, 2012 6:35 AM
To: gregyancey@verizon.net
Cc: Mindi Hurley
Subject: Re: RE: Townhome Grading
They asked me yesterday if there was any moisture conditioning or other
soil prep that was needed in this area, or if it was just the grading.
I told them I thought it was just the grading, but that I would verify
with you.
(4/23/2012) Keith Marvin - RE: RE: Townhome GradingPage 2
Keith
-----Original Message-----
From: "Greg Yancey" <gregyancey@verizon.net>
To: Keith Marvin <KMARVIN@coppelltx.gov>
Sent: 1/11/2012 5:00:31 AM
Subject: RE: RE: Townhome Grading
Thanks for helping us with this.
Gregory K. Yancey
Provident Company
(214) 215-9400 v
(214) 276-1709 f
gregyancey@verizon.net
_____
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Tuesday, January 10, 2012 9:32 AM
To: martym@jrj.com; Tad Larson
Cc: Mindi Hurley; cmglenn@glennengineering.com; gregyancey@verizon.net
Subject: Fwd: RE: Townhome Grading
Marty/Tad,
Attached are some plans provided by the developer of the residential
lots
within the Old Town development. Within these plans are "Lot Grading
Plans"
that depict finished ground elevations for the individual lots.
Please review these plans and let me know if this is work that can be
performed while you are on site working, and what cost implications
there
may be to perform this work.
Thanks,
(4/23/2012) Keith Marvin - RE: RE: Townhome GradingPage 3
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "Mike Glenn" <cmglenn@glennengineering.com> 1/7/2012 1:00 PM >>>
Attached are our revised drawings for your review.
Let me know if you have any questions.
Mike Glenn, P.E.
Glenn Engineering Corp.
TBPE Firm F-303
HUB #1752575193300/469711
105 Decker Court, Suite 910
Irving, Texas 75062
972-717-5151(o)
972-672-2450(m)
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Thursday, December 15, 2011 4:46 PM
To: Mike Glenn
Cc: Mindi Hurley; 'Greg Yancey'
Subject: Re: Townhome Grading
Mike,
(4/23/2012) Keith Marvin - RE: RE: Townhome GradingPage 4
We have reviewed the Old Town grading plans and have the following
comments
to offer:
1. Please label all streets.
2. Please provide additional grade information at the top of curb,
and/or
edge of alley paving at each property line.
3. Please label all high and low points along the alley and provide
edge of
pavement elevation.
4. Please confirm flow arrow direction on sheets C5 and C6.
5. Sheets C1 and C2 show several areas where the alley paving will
encroach
private property. You will need to provide "corner clips" of additional
right of way to cover this encroachment. See Lots 1,16,17,32 Block F,
and
Lot 1, Block G.
6. The site plan shows a large amount of landscaping, and Greg has
requested a water service for irrigation of the area on the south side
of
the Block G alley. Should this alley consist of only twenty feet of
right
of way, and a nine foot "X" lot, where the "X" lot would be owned and
maintained by the POA?
I'm here tomorrow if you want to discuss any of these issues.
Keith
(4/23/2012) Keith Marvin - RE: RE: Townhome GradingPage 5
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "Mike Glenn" <cmglenn@glennengineering.com> 12/14/2011 11:36 PM >>>
Attached is a review set of the lot grading plans for Old Town Coppell.
Let me know if you have any questions.
Mike Glenn, P.E.
Glenn Engineering Corp.
TBPE Firm F-303
HUB #1752575193300/469711
105 Decker Court, Suite 910
Irving, Texas 75062
972-717-5151(o)
972-672-2450(m)
Townhome GradingPage 1 of 3
Keith Marvin - RE: RE: Townhome Grading
From: "Marty Murphy" <Martym@JRJPaving.com>
To: "Keith Marvin" <kmarvin@coppelltx.gov>
Date: 1/10/2012 10:09 AM
Subject: RE: RE: Townhome Grading
Got it, are we supposed to be pricing any moisture conditioning of these pads as well?
Marty Murphy,
Business Manager
JRJ Paving, LP
1805 Royal Lane, Ste. 107
Dallas, TX. 75229
214-466-8340
214-466-8354 Fax
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Tuesday, January 10, 2012 9:42 AM
To: Marty Murphy
Subject: Fwd: RE: Townhome Grading
I've apparently got a bad email address for you, so I'm re-sending this.
Keith
>>> Keith Marvin 1/10/2012 9:31 AM >>>
Marty/Tad,
Attached are some plans provided by the developer of the residential lots within the Old Town development.
Within these plans are "Lot Grading Plans" that depict finished ground elevations for the individual lots.
Please review these plans and let me know if this is work that can be performed while you are on site working,
and what cost implications there may be to perform this work.
Thanks,
Keith
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4F0C0E56City_...4/23/2012
Townhome GradingPage 2 of 3
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "Mike Glenn" <cmglenn@glennengineering.com> 1/7/2012 1:00 PM >>>
Attached are our revised drawings for your review.
Let me know if you have any questions.
Mike Glenn, P.E.
Glenn Engineering Corp
.
TBPE Firm F-303
HUB #1752575193300/469711
105 Decker Court, Suite 910
Irving, Texas 75062
972-717-5151(o)
972-672-2450(m)
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Thursday, December 15, 2011 4:46 PM
To: Mike Glenn
Cc: Mindi Hurley; 'Greg Yancey'
Subject: Re: Townhome Grading
Mike,
We have reviewed the Old Town grading plans and have the following comments to offer:
1. Please label all streets.
2. Please provide additional grade information at the top of curb, and/or edge of alley paving at each property
line.
3. Please label all high and low points along the alley and provide edge of pavement elevation.
4. Please confirm flow arrow direction on sheets C5 and C6.
5. Sheets C1 and C2 show several areas where the alley paving will encroach private property. You will need to
provide "corner clips" of additional right of way to cover this encroachment. See Lots 1,16,17,32 Block F, and
Lot 1, Block G.
6. The site plan shows a large amount of landscaping, and Greg has requested a water service for irrigation of
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4F0C0E56City_...4/23/2012
Townhome GradingPage 3 of 3
the area on the south side of the Block G alley. Should this alley consist of only twenty feet of right of way, and
a nine foot "X" lot, where the "X" lot would be owned and maintained by the POA?
I'm here tomorrow if you want to discuss any of these issues.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "Mike Glenn" <cmglenn@glennengineering.com> 12/14/2011 11:36 PM >>>
Attached is a review set of the lot grading plans for Old Town Coppell.
Let me know if you have any questions.
Mike Glenn, P.E.
Glenn Engineering Corp
.
TBPE Firm F-303
HUB #1752575193300/469711
105 Decker Court, Suite 910
Irving, Texas 75062
972-717-5151(o)
972-672-2450(m)
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4F0C0E56City_...4/23/2012