Loading...
WA9601-CS 980205 SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JoE R. CARTEn, P.E. February 5, 1998 GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. Mr. Kenneth M. Griffin, P.E. City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Sandy Lake Road Water Line 95% Complete Construction Plans Dear Mr. Griffin: We are enclosing two sets of construction plans for the Sandy Lake Road Water Line Project. These sets are roughly 95% complete and should be ready for bid within a few short days after your approval. We are completing the project specifications and contract documents now and expect to deliver a review set by early next week. The major item that remains unresolved is the coordination effort that appears to be required between this project and the Forest Cove Development. Of course, we stand ready to assist the City to phase this project in order to best avoid potential conflicts. Based on the submitted plans, our opinion of probable construction cost is in the range of $1,130,000. We are enclosing an itemized copy of our opinion of cost for your review and are available to discuss this project further at your convenience. Enclosures j:\coppe[l~,96-150\letters\corresXfinaldoc SHIlVI~EK, JACOBS & FIY"'~LEA, L.L.P. '7 project No. 96q50 CONSULTING ENGINEERS . Client: CITY OF COPPELL, TEXAS Date: 02/05/98 Project: Sandy Lake Road Water Line By: G.C.H. ENGINEER'S OPINION OF CONSTRUCTION COST Item No_ Description For Furnishing and Installing 24-Inch Water Line by 1 Open Cut . 10,117 L.F. _ $72.00 $728,424.002 For Fumishing and Installing 24-Inch Water Line by 2 other than Open Cut 556 L.F. $185.00 $102,860.00 For Furnishing and Installing 24-Inch Water Line with 3 _36-Inch Encasement Pipe . 136 L.F. $275.00. $37,400.00~ For Furnishing and Installing 24-Inch Water Line with 4 Concrete En_Casement . _ 144 ~ L.F. ~ $95.00 $13,680.00 For Fumishing and Installing 24-Inch Water Line with 5 Flowable Backfill 370 L.F. $105.00 $38,850.00 6 For Furnishing and Installing 12-Inch PVC Water Line 141 _ L.F. · $85.00 $11,985.00 7 For Furnishing and Installing 8-Inch PVC Water Line 65 L.F. $50.00 $3,250.00 8 For Furnishing and Installing 6-Inch PVC Water Line 109 L.F. $45.00 $4.905.00 9 For Furnishing and Installing 24-Inch Butterfly Valve 3 Ea. $4,800.00 $14,400.00 10 For Furnishing and Installing 12-Inch Gate Valve 5 Ea. $2,400.00 $12,000.00 11 For Furnishing and Installing 8-Inch Gate Valve 4 Ea. $1,800.00 $7,200.00 12 For Furnishing and Installing 6-Inch Gate Valve 1 Ea. $1,400.00 $1,400.00 For Furnishing and Installing 6-Inch Air & Vacuum 13 Release Valve 6 Ea. $3,000.00 $18,000.00 14 For Furnishing and Installing 6-Inch Blow-OffValve 4 Ea. $2,200.00 $8,800.00 15 For Furnishing and Installing Standard Fire Hydrant 1 Ea. $1,500.00 $1,500.00 16 For Furnishing and Installing 24-Inch Dished Head Plug 1 Ea. $1,800.00 [ $1,800.00 17 ~For Connecting to Existing 24-Inch Water Line . I Ea. $1,200.00 $1,200.00 18 For Connecting to Existing 10-Inch Water Line 1 Ea. $1,000.00 $1,000.00 19 For Connecting to Existing 8-Inch Water Line 1 Ea. $900.00 $900.00 J:\Coppell\96150Xspecs\tech~P&BS-2wk4 Page: I of 2 -SHII~EK, JACOBS & FI"'2LEA, L.L.P. ~ ProjectNo. 96150 CONSULTING ENGINEERS Client: CITY OF COPPELL, TEXAS Date: 02/05/98 Project: Sandy Lake Road Water Line By: G.C.H. ENGINEER'S OPINION OF CONSTRUCTION COST Item No. Description Quantity ._Unit Price ' Amount 20 For Cutting and Plugging Existing l 0-Inch Water Line 2 Ea. $600.00 $1 200.00 21 For Cutting and Plugging Existing 8-Inch Water Line 2 Ea. $550.00 $1,100.00 22 For Furnishing and Installing Ductile Iron Fittings 2,350 Lbs. $1.25~ $ . 2,937.5 For Removing and Replacing Existing Concrete 23 Pavement 88 S.Y. $55.00 $4,840 00 24 For Removing and Replacing Existing Asphalt Pavement 277 S.Y. $40.00 $11 080.00' 25 For Removing and Replacing Existing Gravel Drive ] 3 S.Y. $:20.00 $260.00 For Removing and Replacing Existing Concrete Curb 26 and Gutter 12 L.F. $20.00 $240.00 For Removing and Replacing Existing Concrete 27 Sidewalk 56 S.Y. $]0.00 $560.00' 28 'For Removing and Replacing Existing Pipe Rail Fence 40 L.F. $35.00 $1,400.00 29 For Extra Concrete for Encasemerit 30 C.Y. $70.00 $2,100.00 30 For Extra Crushed Stone for Embedment 30 C.¥. $25.00 $750.00 For Furnishing, Installing, Maintaining and Removal of 31 Erosion Control Devices I L.S. $]0,000.00~ $10,000.00_ For Furnishing, Installing and Maintaining Traffic 32 Control Devices 1 L.S. $7,000.00 ~ $7,000.00 33 For Desigmng and Installing Trench Safety Systems ]0,63 ] L.F. $2.00~ $21,262.OO I Subtotal: _ $1,074,283.50. Contingencies 5% . $53,714.18 Total: . ~ $1,127,997.68 USE: $1,130,000.00 J:\Coppell\96150Xspecs\techXP&BS-2wk4 Page: 2 of 2