Loading...
ST0501-LR120417 APR -24 -2012 01:31 P.01 /03 Texas CMT, Inc. , - Construction Materials Testing GEE COflSU l ts, Inc. and Environmental Consulting Dallas, Texas 75229 • Post -it® Fax Note 7671 Dat p °e s• 10044 Monroe Drive • (214) 35; To L__R y ./4 v i s From / —r, " e r xc 7 �,, CA T Go. /Dept. J/v$T , ar�' T0l�/ � Co & t / ti w05Li /4.4.146 Phone # 972 3c4 3‘ 54 Phone # 2 4, 3 . ( 5-7 REINFORCING STEEL PLACEMET Fax # 3o4 _3 � 76' Fax # � Z Report Date: April 17, 2012 Test Date: April 5, 2012 Client: City of Coppell Reinforcing Steel Report No. 7 Project: Deforest Road Reconstruction, Coppell, Texas Project Number: 211 -01 Identification: Reinforcing Steel Observation — .._._. City of Coppell Project Number: ST -0 01 f !I c r e ;5 Method of Test: Visual Observation No >r'n ♦ S Page: 1 of 1 Pro, j CGf f �S 5r o5 -al Results: On April 5, 2012 reinforcing steel was observed at the following locations: • • Retaining Wall Spread Footing from (approximately) Station 15 +55 to 15+02 The following discrepancies were noted and called to the attention of Manuel, a representative of California Construction. , ■ Footing width would require excavation beneath existing adjacent alley paving. Contractor was instructed to use traffic cones in alley as required and dig to required footing width. ■ Rebar was not placed in entire toe of footing due to presence of adjacent fence post footing and incomplete excavation beneath alley pavement. Instructed c•:. ' or t& dig behind fence post footing to required dimensions and to use fence bracing,. : -8 till cone ete placement. Technician: RG L ife)//e' e l 2 cc: Mr. Larry Davis -.City of Coppell, Phone: 972 -304 -3684; via Fax: 972 - 304- 3570,,�<• Mr. George Marshall - City of Coppell, Phone: 972 -304 -3562; via E -mail: gMarshall @coppelltx.gov Mr. Dan DeGrogt - „Burgess Niple, Inc., Phone: 972 - 620 - 1255,, x4 E mail: Dan.DeCtwot @BurgessNiple.com Mr. Robert Caudill - 'Tiseo Paving Company, Phone: 972 -289 -0723, via E Mr. Walter Mitchell - Tiseo Paving Company, via E -mail: barnobas @yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972 - 670 -0368; via E- mail:'Bobby @CalConTex.com Texas CMT, Inc. TBPE Firm: F -4521 Revie V: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the ruil approval of Texas CMT, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative, quwntities of apparently identical otsitlrilar products. APR - 24 -2012 01:32 P. /03 c Texas CMT, Inc. Construction Materials Testing GEE COnSU Itan 1.J, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 35 2 7 • Fax (214) 352 - 6972 • www .texascnit.com • REPORT OF CONCRETE MIX OBSERVATION Report Date: April 17, 2012 Date Concrete Placed: April 10, 2012 Standard 6 "x12" Cylinders Client: City of Coppell Cylinder Cross - sectional Area: 28.27 Square Inches Project_ Deforest Road Reconstruction Concrete Report No.: 12 Contractor: California Construction Project No.: ST- 056 -01 •Concrete Supplier and Plant: Redi -Mix Concrete / P259 Location of Placement: Retaining Wall Footing: Station 15 +55 to 15 +02 • MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs /CuYd) • Mix Number: 10L11504 Time Sample Batched: 1:35 PM Cement: Time Sampled: 2:25 PM Fly Ash: Sample Location: Sta. 15 +15 Truck / Ticket No: 1269 / 25453527 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient. Range: 81 °F Fine Aggregate: Concrete Range: 84 °F dtidRrri ttatfes Slump. Range (inches): 4.75 ' ' ' d Weather Conditions: Clear 1 Time Started: 12 PM ` Time Completed ). - I 3:45 PM . . .`. Added Water: 25 Gallons Sample Air Content ( %): 4.0 Total Cubic Yards Placed: 10 Required Strength (Lbs. /sq.in.): 3,600 ;,; Specimen Measured Age Date Total Load Compressive Strcng)lt Number Slump (in.) (Days) Tested (Lbs.) (Lbs1Sq4x -} . DFR 45 7 4/17/12 105,240 3 - i DFR 46 28 5/8/12 ` > 4.75 D'FR 47 ` 28 5/8/12 '' DER 48 H Hold Test Methods Utilized Fracture Regular ASTM C -31, C -39, C -143 _ (Unless Noted Otherwise) C Made By RG . Re and /or Distribution: cc: ' Mr. Larry Davis' - City of Coppell Phone: 972- 304 -3684; via Fax: 972- 304' -357.0 • Mr. George Marshall - City of Coppell, Phone: 972- 304 -3562; via E- mail: .gMarsl>.all @coppelltx.gov , Mr. Dan DeGroot - Burgess & Niple, Inc., Phone: 972 -620 -1255; via E -mail: Dan.DeGroot @BurgessNiple.com • Mr. Robert Caudill - Tiseo Paving Company, Phone: 972 - 289 -0723; via E- mail: rCaudill@TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E -mail: barnobas @yahoo,com ' Mr. Bobby Bounds - California Construction, Phone: 972 - 670 -0368; via E-maiEpobby@CalConTex.com Texas CMT, Inc. TBPE Firm: F -4521 . Reviewed by: - :. All Icttcrs and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. TOTAL P.03