Loading...
Cameron Country-CS 980910The City With A Beautiful Future P.O. BOX 478 COPPELL, TEXAS 75019 P.O. Box 478 Coppell, Texas 75019 972-462-0022 FILE Jack Bommarito Beamer Development, Inc. P.O. Box 2312 Coppell, TX 75019 Cameron Country (812 Deforest) Development Fee Assessment September 15, 1998 Dear Mr. Bommarito: Enclosed is a copy of thc City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to thc City of Coppell in the amount of $3,040.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer'to attached' ': table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. $i~.cerely, Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Cameron Country (812 Deforest) Date: 9/15/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $450.00 $450.00 (100% due prior to Council Approval) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) ' Water Meter Fee (Domestic) $24.83 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $450.00 $450.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $1,285.00 $1,285.00 (100% due prior to Council Approval) Roadway Impact Fee $855.00 $855.00 (100% due prior to Council Approval) Street Light Fee (100% due prior to Acceptance of Project N/A Street Sign Fee (100% due prior to Acceptance of Project N/A Construction Inspection Fee N/A TOTAL $3,249.83 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $3,040.00 DEVELOPMENT FEE WORKSHEET PROJECT: Cameron Country (812 Deforest) DATE: 9/15/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 5/8 inch X 3/4 inch = I ESU°s = ESU's = ESU's = ESU's Total #: 1 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total 0: 1 Domestic Meter(s) @ $24.83 (Single family due prior to issuance of building permit) (Ail other developments due prior to issuance of meter) lrrigation/Fireline Water Meter Fee: Total #: 0 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: I Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: @ $450.00 ea. Wastewater Tap Inspection Fee: Total 0: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total 0: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $450.00 $50.00 $24.83 $0.00 $0.00 $o.oo $35.00 $0.00 $450.00 $50.00 $50.00 Page I DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid pdor to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: 1 N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00/Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) SWeet Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A $1,285.00 N/A $855.00 N/A Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) N/A Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) N/A Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Cameron Country (812 Deforest) 9/15/98 ROADWAY IMPACT FEE: Service Area * Category ** Residential Land Use ** Single-Family Detached Building Size (Sq. Ft.) N/A Development Units ** 1 Vehicle Miles per Development Unit ** 2.85 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) -- $855.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)