Loading...
FTTP-CR051115 Nov 15 05 04:02p p. 1 PAge 4 or-7 T H CÔFFELL UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE ;ontact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection vith Utility & Streets personnel to verify that your project has been completed to City of ;oppell specifications. Failure to schedule verification inspection may delay future projects. F ranchise Utility Name Ati/ it 5'/ J 6 &--/z (b A) 5 7 Project Location / Applicant's WorkOrder # (if applicable)5'Pf L/WA DOV92 LN Sub-contractor Company Name tC 41-4-..g/ 63)/el 24 hr.Contact Number .? - 5.57•0 • tT, / 3 Date of Verification Appointment / 1 /157 bir Time of Verification Appointment • INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PERSONNEL :• Inspected by t Q.Rod of Utilities Maintenance Division on , rnd found to b, ac eptabl• /not acceptable because Follow-up needed? NO / YES Follow-up scheduled for :• Inspected by of Streets Maintenance Division on znd found to be acceptable /not acceptable because . Follow-up needed? NO / YES Follow-up scheduled for • A copy of this completed notice is to be provided to: City of Coppell Engineering Dept. 255 Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3570 • 2 z » � 620 880 k # )) ) • co 2 D L. § ‘43 '8 -8 ) eq m $ 2 2 \ E @ _ A 2m « • E jj . )° • k0. § J- G / % % / • • 2§ » zz • 3 k E mot g ¢ 3 � # wAA o 2222 .$ 77 ■ \ % % § qq -k ) 22 ? •d dEO :.,O §O SI AON