Loading...
FTTP-CR051111 Nov 11 05 11 : 19a p. 1 _ Yage4of4 T H E • C $ T Y O F COPPELL S , $ 9 UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE ontact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection ith Utility & Streets personnel to verify that your project has been completed to City of oppell specifications. Failure to schedule verification inspection may delay future projects. • Franchise Utility Name /,�f,4$'/1/E rE, ( A/ 5- 71 AP/ i7,4.5//1/ Location / AppIicant's WorkOrder # (if applcable)7,7/2-'76 4 P Xo e / j44 . / Itd .AlL Tv - , v' Sub-contractor Comp. y Name ,e4.--,9, 1 )/ /c 24 hr.Contact Number "77, - FrO / 3 f. Date of Verification Appointment l/////O Time of Verification Appointment 7 3 a INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PERSONNEL Inspected by GHY Jt/L of Utilities Maintenance Division on //-//-or ,//oo hi nd found to b acceptable not acceptable because bllow-up needed ,NES Follow-up scheduled for • • Inspected by • of Streets Maintenance Division on nd found to be acceptable /not acceptable because 'ollow-up needed? NO/ YES Follow-up scheduled for A copy of this completed notice is to be provided to: t City of Coppell Engineeting Dept. • 255 Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3570 g s a.110 E ; . < N Y MM� 1�1 I >. C- 0 ii0 V a °CO IC ra A A ' d o 12:1 mo a a � 2 ihh3 11 a 4 • L. a S. to t co c e o g g uu < g E m m E 3 l- a a a a lL LPL N- n ■ g z •d e6T : TT SO TT AoN Nov 11 05 11 : 18a 40l -1 p. 1 rage /1 T H E • C I T Y • 0 F COPPELL el AS I q UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE ontact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection ith Utility & Streets personnel to verify that your project has been completed to City of . (* ppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name b 5 T„ Project Location / Applicant's WorkOrder# or applcable)7f 0eA -r,AJ. //ti'/ -7 /Ve 4#717;Zif>G liiAzr/fX1 jG Sub-contractor Company Name if-'41- .g/yj 24 hr..Contact Number <77, - Fre) • 6 /3 f. Date of Verification Appointment // kl b Time of Verification Appointment 7 : 9 e) INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELI.PERSONNEL _... . Inspected of Utilities Maintefrance Division.on .//-//- ,//.Oo9rr • zd found to be ' 'ceptabl•2/not acceptable.:because • • 711ow-up needed NOJ.YES _Follow-up scheduled for Inspected by of Streets Maintenance Division on _ zd found to be acceptable/not•acceptable because ollow-up needed? NO / YES; Follow-up scheduled for • A copy of this completed notice is to be provided to: _ City of Coppell Engineering Dept. 255 Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3570