Loading...
FTTP-CR051103 Nov 03 05 04: 04p p. 2 Page 4 of 4 T H E G f T Y O F COPPELL A,_, „ ,_ ~`� q k A k 8 UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE 'ontact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection vith Utility & Streets personnel to verify that your project has been completed to City of ;oppell specifications. Failure to schedule verification inspection may delay future projects. 1 �7 ,5'j 7 1 (14.14)5 71 Franchise Utility Name � � �� Project Location / Ap licant's WorkOrde (it appucabie) .? �j� C/-4-1 /11pc44-1te g_ ,DE-Icit5 Zi)# f , M■12,„Fezb,-- Sub-contractor Company Name ' X41 rY x 24 hr.Contact Number .? - Fie) • 6 / 3 L -- , Date of Verification Appointment /O/ - ' "' Time of Verification Appointment 7- ba AIM INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PERSONNEL •:• Inspected by %'r mow' of Utilities Maintenance Division on //-3 -O 5' , ,.7 9t'� Ind found to be acceptabl not acceptable because Follow-up needed . NO YES Follow-up scheduled for :• Inspected by of Streets Maintenance Division on , znd found to be acceptable /not acceptable because • Follow-up needed? NO / YES Follow-up scheduled for • A copy of this completed notice is to be provided to: City of Coppell Engineering Dept. 255 Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3570 - • Damage Contract Located Utility Item Investigated • Date Work Order Type Company YIN Provider Damaged Size Damaged By. Location Of Damage By CT) 9129/05 3PF01GW Cable Sunset Y Corneas( Feeder bore rig 615-623 Prestwick Guy Varney Q 4 10/3/05 3PF01GW Water Absolute N City of Coppell Selvice 1' bore rig Peninsula _Guy Vamey • • • o_ 0 v 0 u, 0 co • 0 0 z Nov 03 05 04: 04p p. 1 _ Page•i of-f T H E • C I T Y • 0 F COPPELL , ,,,, , . * '� -,: T Fx ^ s ` e q UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE :ontact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection vith Utility & Streets personnel to verify that your project has been completed to City of. :oppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name /2/ 711 s'Al E y /z Cb�t/ 5 7„ Project Location / Ap lif ant's WorkOrd r # (if applicable) .3-f', -.25/�e /),Re/adki zi, ,/ z<ipzai / 42. Sub-contractor Company Name A 41y/9„g/Y1- X 24 hr.Contact Number ?7 .? - FAD • 6 / 3 - f Date of Verification Appointment / L 2-r7 6 5 Time of Verification Appointment v 4) 1-71- • INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELI,PERSONNEL :• Inspected by ',/i. ate--A_ of Utilities Maintenance Division on //-3-o s"-- 1 3'0612/17 and found to b acceptable not acceptable because . Follow-up needed NO) YES Follow-up scheduled for . :• Inspected by of Streets Maintenance Division on , znd found to be acceptable /not acceptable because , Follow-up needed? NO/ YES Follow-up scheduled for • A copy of this completed notice is to be provided to: City of Coppell Engineering Dept. 255 Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3570 Nov 03 05 04: 04p p, 4 Damage Contract Located Utility Item •.Investigated. Dab Work Order Type Company YIN Provider Damaged : Size. Damaged By Location Of Damage. By 9/9/05 3PF01 HC Electric Walland Y Oncor Primary Bore Rig 821 Ashford ' Jeff Wesson