Loading...
FTTP-CR050930 Sep 30 05 11 : 35a p. 1 Page 4 or 4 T H E C 1 T Y O F y_ COPPELL e %'= 9 9 k 1 s UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE - - Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name !L , et,"2"td-- Project Location / Applicant's WorkOrder # (if appGcable3/ Pa/ N6 Sub-contractor Company Name P/1/1 m 24 hr.Contact Number ` g 3 Date of Verification Appointment Time of Verification Appointment 144 INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PERSONNEL •:• ected b Dq,V1V Inspected y P y //jl/flci4i4,-<< of Utilities Maintenance Division on 5'-10-or' , 7'Jo4r and found to be cceptable not acceptable because • Follow-up needed? NO YES Follow-up scheduled for •:• Inspected by of Streets Maintenance Division on and found to-be acceptable /not acceptable because Follow-up needed? NO/ YES Follow-up scheduled for • A copy of this completed notice is to be provided to: City of Coppell Engineering Dept. 25S Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3570 Damage Contract Located Utility Item Investigated At Fauit Date Work Order Type Company YIN Provider Damaged Size Damaged By Location Of Damage By YIN cascade/parkside 8/24/05 3PF01 HG Electric , Sunset Y TXU Electric Primary Bore Rig alleyway Paul Durio Y 117/113 Cascade 8/25/05 3PFOIHG Telephone Sunset Y Verizon 50 pair bore rig Way Paul Durio N • 8/30/05 3PF01 HG Sewer Hal-Tec N City of Coppell Service 934 Laguna Paul Durio Y 9/1/05 3PF01HG Water Hal-Tec N City of Coppeli Service 930 Laguna Paul Durio Y �o m 0 0 m a_ w in