Loading...
FTTP-CR050721 Jul 21 05 10: 41a p. 1 Page 4 of 4 dôm Y O F ELL e G.-- 9 ^ S , 6 UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name K/4Ascri, yE GD,✓S%. Project Location Applicant's WorkOrder # (if applicable /A- (Pt:IL-re-* Gr/ /-742 y s Sub-contractor Company Name eitlAS,117e- /E 24 hr.Contact Number 97� � /3 Date of Verification Appointment 7/7//b Time of Verification Appointment LNFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PERSONNEL Inspected by /167o,4,,rc of Utilities Maintenance Division on 7-,2/ C ) and found to be acceptabl• /not acceptable because Follow-up needed? 0 YES Follow-up scheduled for :• Inspected by of Streets Maintenance Division on and found to be acceptable /not acceptable because Follow-up needed? NO/ YES Follow-up scheduled for A copy of this completed notice is to be provided to: City of Coppell Engineering Dept. 255 Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3570 •