Loading...
FTTP-CR050720 Jul 21 05 10: 44a p. 1 Page 4 of 4 r tôhth. 9 k • 5 UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name / A,57/44-6- 1/E/2_ di?-1-47- Project Location / Applicant's `• orkOrder # (if applicable)-Pc t` EL�-- Sub-contractor Company Name A ,4 /4t�vy2 iL_ 24 hr.Contact Number �7Z �� 6 l3 Date of Verification Appointment 7/7(4/) 5 Time of Verification Appointment /." b c Ax_ INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PERSONNEL •: Inspected by li/GHTo‘,i,7L of Utilities Maintenance Division on 7 a�' v1 , / �o/5%% and found to be acceptable not acceptable because Follow-up needed? 10 YES Follow-up scheduled for Inspected by of Streets Maintenance Division on and found to be acceptable /not acceptable because Follow-up needed? NO / YES Follow-up scheduled for i - A copy of this completed notice is to be provided to: City of Coppell Engineering Dept. 255 Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3570