Loading...
FTTP-CR050714 Jul 14 05 04: 08p p. 1 Page 4 or 4 dôhii . ter^ S • # x s , e UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name !ti sG/9y eft Project Location / Applicant's WorkOrder # (if applicable) 312,c2;./ F-6 A//- Aa-t /&91/2 y f�fnk//92 -, ��. Sub-contractor Company Name /L/Agg.5, c" 4— 24 hr.Contact Number 671 2- / Date of Verification Appointment `Th jj S Time of Verification Appointment /b INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PERSONNEL Inspected by .i/'#T,6,‘..z-z.ric of Utilities Maintenance Division on 7-/ -of r-n and found to b• acceptable not acceptable because Follow-up needed? NO YES Follow-up scheduled for Inspected by of Streets Maintenance Division on and found to be acceptable /not acceptable because Follow-up needed? NO / YES Follow-up scheduled for A copy of this completed notice is to be provided to: City of Coppell Engineering Dept. 255 Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3570 '