Loading...
Valley R Plaza A-LR 970106 IN-PLACE DENSITY TESTING ENGINEERING,INC. 4747 Irving Blvd.,Suite#206 Dallas,Texas 75247 Date of Service: 01/06/1997 Report No.: 9700268 Client No.: 55705000 Project No.: 43-2434-96 Client: McDonald's Corporation Project: McDonald's Attn: Anthony Thompson 817 MacArthur Blvd. 511 E. Carpenter Fwy., #375 Coppell,Texas Irving TX 75062 Services: In-place density testing. PROJECT DATA CONTRACTOR: Stovall Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: Maximum Project Requirements M/D No. Description Moisture% Density pcf Moisture Density 1 Grayish Brown Clay 22.0 95.5 Min. +3% 92% FIELD DENSITY TESTS TEST M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (pcf) (%max) 10 Building pad,north end, final 1 25.0 92.1 96 11 Building pad, south end, final 1 25.1 90.3 95 Test results on this report meet project specification. • Technician: Dennis Taylor — u gineering,Inc. Report Distribution: AIM (I)McDonald's Corporation (1)Stovall Construction 'aul D. Smith, P.E. (i)City of Coppell Senior Project Engineer 07CC This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering,