Loading...
Valley R Plaza P1-CS 880616 1111■ IIIIII ALBERT H. HALFF ASSOCIATES, INC. 111111 ENGINEERS AND SCIENTISTS ALBERT H.HALFF,CHAIRMAN OF THE BOARD DALLAS • FORT WORTH • HOUSTON JOSE I.NOVOA,PRESIDENT RAUL WONG,JR.,SENIOR VICE PRESIDENT DON 0.BROCK,VICE PRESIDENT 8616 NORTHWEST PLAZA DRIVE TROY LYNN LOVELL,VICE PRESIDENT DALLAS,TEXAS 75225 MARTIN J.MOLLOY,VICE PRESIDENT 214/739-0094 DAVID S.MORGAN,VICE PRESIDENT WALTER E.SKIPWITH,VICE PRESIDENT JEFFREY H.JACOB,SECRETARY GEORGE PRALL,JR.,TREASURER PATRICK L.KUNZ ALBERT C.PETRASEK,JR. JERRY F.ROBERTS June 16, 1988 AVO 7987 City of Coppell P. 0. Box 478 Coppell, Texas 75019 Att: Mr. Steve Morton Re: Inspection fees for Utility Construction at Valley Ranch Plaza Dear Mr. Morton: Dunning Development has contracted with S&S Utility Construction Company to install the utilities for the Valley Ranch Plaza . The construction will consist of utilities within public right-of-way and also of utilities on private property. I have broken down below all utilities that are to be constructed in public right-of-way. 1. 12-inch W-L along MacArthur Blvd. and Belt Line Road $14,051.50 2. 8-inch W-L along MacArthur Blvd. $18,407.00 3. 6-inch Sanitary Sewer along Belt Line Road $ 2,956.74 4. Construction of water crossing of $25,460.00 Belt Line Road 5. Trench Safety System for utility lines $ 152. 17 6. Trench Safety System for bore pits $ 400.00 TOTAL $61,427.41 TRANSPORTATION • WATER RESOURCES • LAND DEVELOPMENT • MUNICIPAL • ENVIRONMENTAL • SURVEYING ■■■ •IU ALBERT H. HALFF ASSOCIATES, INC. �.� ENGINEERS AND SCIENTISTS City of Coppell June 16, 1988 Page 2 Based upon an inspection fee of the 1.5%, the total inspection fee due for this project is $921.41. I have enclosed a copy of the bid prices from the contractor for your reference. Please call with any questions. Sincerely, ALBERT H. HALFF ASSOCIATES, INC. / m.L■-- Gre ry Kuhn, P.E. GK/vg cc: Mr. Pat Donovan Dunning Development Corporation S 8 S UTILITY CONTRACTING CO6PANY, INC. WATER AND SEWER CONTRACTING 11934 JUOD COURT WTI 3311 town/,Tttw 11143 • March 14 . 10 88 88 TOt Dunning Development Corporation t N►IMI c/o Albert H. Halff Assoc. , Inc. Attn: Mr. Greg Kuhn 8616 Northwest Plaza Drive Dallas, TX 75225 We propose in furnish the ntsrnery labor, nu>tetial•, equipment. and incidentals to construct the following described work In accordant with plans al A 1 hP r t H_ Halff A s ao , Inc. .._ Engis err. end dm requirements el __ City of Cnpp .Ll , Texgs upecilkatlons. Des rlpsiot d Work: Water Mains, Sanitary and Storm, Sewers Lennart: Valley Ranch Plaza Coppell , Texas Quantities sad Prices: 1 . Construction of approximately 123 linear feet of 12-inch water (Sta. 3+32 to 4+55) line, 332 linear feet of 8-inch water line, and 410 linear feet of 6-inch water line, and 265 linear feet of 2-inch water line including fittings, appurtenances, Complete in Place $ 57,682.00 la. Construction of approx. 359 ft. of 12" water (Sta. 4+55 to 8+14) line, including fittings, appurtenances, Complete in Place 7,353.00 lb. Construction of approx. 204 ft. of 12: water (Sta. 8+14 to 10+18) line, including fittings, appurtenances, Complete in Place 4,177.00 2. Construction of approximately 690 linear feet of 6-inch sanitary sewer line and manholes, Complete in Place 19,430.00 3. Construction of approximately 36 linear feet of 24-inch water line, 195 linear feet of 12-inch water line with 90 linear feet by means other than open cut, cut and plug 12-inch line, convert fire hydrants along MacArthur Boulevard, includes appurtenances, and fittings, Complete in Place 25,460.00 4. Construction of approximately 135 linear feet of 24-inch R.C.P. storm sewer pipe 2 inlet bottoms, and 1-sloped end section headwall , Complete in Place 9,000.00 5. Trench Safety System for Utility Lines 1 ,000.00 6. Trench Safety System for Bore Pits 400.00 Total $124,502.00 Calendar Days (After Delivery of Material ) 30 For your convenience the above quantities have been estimated, however this repeal is on a unit price bade with pay. /twit to be made an else actual measured quantities al work completed. On the last day of each month partial estimates shall be prepared including all al the completed work plus all of the material on hand for the uncompleted len and shall be paid to lull not later than the 10th day of the Iobseing month. Fins estimate shall be prepared rely upon completion and shall be paid within 10 days. All mtimales 1111 salved as des data shall beat Interest from due data until date received at 11% per annum. It is olio agreed by both parties se this a/eausent that any and all costs of litigation to obtain monies due ameraoter shall be at the expense al the owner. with sJl Thu proposal Is ales based so all englneseleg, grades and alignments being furnished by the owner. earths, lgolanry parmits ham the City. County. State or other Interested pasties. approval Your acceptance of this proposal by signing and returning one copyar oco s tisnui Ibsect days o ea e n aif • Nattered Ur credit arrangement will cos Meuse a Cottrect lissom. W. T is prWes� age ey should cause ■tatertals se bosoms anaeMMble. gyp; fp,,,,t s,l S 1. S UTILITY CONTRACTING COMPANY, INC. ICmtulAwl 1-L„, \R_ Br Ken R. Smith 111IP 7E President Mei ad DNS ATR3£;— _ e