Loading...
Mobil Sta MacA-CS 891019 COPPELL PUBLIC WORKS MEMORANDUM DATE: October 19, 1989 TO: Larry Davis, Construction Inspector __fl FROM: Russell Doyl~ty Engineer RE: Beltline E/S/ C.I.P. Construction Please be advised that the Mobil Oil/Valley Ranch Center Utility Placement (or the lack thereof) is now holding up subject project. Dallas County will be issuing a letter to that affect. Please provide me a typewritten summary of the situation and what needs to be done to get matters off dead center before we (or someone) start getting charged damages, etc. I have not been able to contact Steve Lemke nor Tom Huffines about the Mobil Oil comments and coordination of drawings and as-builts, etc. Field control is imperative. As I understand, now the Mobil Oil sanitary sewer lateral is on their neighbors private property and is causing a problem. ~ As I recall, I never did get the report from you on Mobil Oil so I could follow up on that matter. Please give me another copy or have it with the report requested above. (ie on the sewer and mainhole grade errors) Please have both reports by Tuesday, October 24, 1989. Thanks. RRD/pd