Loading...
Mobil Sta MacA-CS 891025COPPELL PUBLIC WORKS DATE TO= FROM RE: October 25, 1989 Russell R. Doyle, City Engineer Larry Davis, Dev. Const. Inspector Bethel E/W C.I.P. Construction I am addressing your memo dated 10/19/89, regarding the Mobil Oil/Valley Ranch Center Utility Construction along Beltline Rd. from the Mobil Oil property east to Valley Ranch East property line. Tom Huffines has provided a revised construction detail sheet which I had requested showing the location and proposed location of the 12" water main and the 8" sanitary sewer, the detail sheet showing the location of utilities is now in our office for your approval. The sanitary sewer lateral referenced to as being on private property is the 4" private service from the Mobil Station to the sanitary sewer manhole at Beltline Road, which was constructed under RFJ construction, Inc. contract with mobil Oil. The proper installation and location of a sewer service is the responsibility of the Contractor and to be inspected by Building Inspections. I have made contact with Bud Beene with Dallas County to discuss how they were affected by the utility construction at the Mobil Oil site. Bud Beene indicated to me that a field problem had existed, but was now corrected. Dallas County is now proceeding with construction in that area. If ~ou have any questions, please let me know. CLD/bb BLINECIP.CLD