Loading...
Valley R Center-PT 900119Bore/Excavation in Public Right-Of-Way Permit City of Coppell - Public Works Department Project Name: Permit Issued To: Name: Address: Phone: Emergency Phone: Representing: Inspector: Type of Work/General Description: Location of Work: Have All City and/or Franchise Utilities Been Contacted and Existing Utilities Located: // YES NO Will It Be Necessary to Excavate Street, Alley or Sidewalk Pavemaent? w// YES (attach permit) ~/ NO Representative(s) of the Franchise/Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Compaction of Trenches and Bores, and Barricading according to the Texas Manual on Uniform Traffic Control Devices. Area[s) affected must be restored to as good condition as before the commencement of work. Any excavation requiring closing of a street or alley must be reported to the Police, Fire, and Public Works Departments prior to closing (462-1144, 462-1!33 and 462-8495). Attach Work Order (Franchise Only) PAGE 2 PERMIT Attach Barricading/Detour Plan if a lane or street closure is applicable. Franc his ~'/C-~nt rac~or Representative Date Franchise Inspector/or City Inspector Approved / C'~-y Representative Date Date Applicant shall indemnify and forever hold harmless against each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. PERMIT.PHB ~ Date Received From'- Address