REINFORCING STEEL PLACEMENT REPORT
Report Date: April 30,2012 Test Date: April 19,2012
Client: City of Coppell Reinforcing Steel Report No. 9
Project: Deforest Road Reconstruction,Co ell,Texas Project Number: 211-0125
Identification: Reinforcing Steel Observation City of Coppell Projec ' ber: ST-05-01
Method of Test: Visual Observation ,ge: 1 of 1
Results: /� •
On April 19, 2012 reinforcing steel was observed at the fo' .. • ions:
• Retaining Wall Spread Footing from(approximately) 't. = 14+51 to 13+71
The following discrepancies were noted and called to the attention of Wal , a re e ive of
Tiseo Paving. • jd J •
• Slip dowels not tied.
• Footing thickness 93/4 inches to 11 inches at numerous locations in fo ting toe and heel; needs
to be 12 inches.
• C-bars too far from red-wood joint.
• First T-bar 7 inches from toe face;needs to be 3 inches.
Technician: RG
cc: Mr.Larry Davis-City of Coppell,Phone:972-304-3684;via Fax: 972-304-3570
Mr.George Marshall-City of Coppell,Phone:972-304-3562;via E-mail:gMarshall @coppelltx.gov
Mr.Dan DeGroot-Burgess&Niple,Inc.,Phone:972-620-1255;via E-mail:Dan.DeGroot @BurgessNiple.com
Mr.Robert Caudill-Tiseo Paving Company,Phone:972-289-0723;via E-mail:rCaudill @TiseoPaving.com
Mr. Walter Mitchell-Tiseo Paving Company,via E-mail:barnobas @yahoo.com
Mr.Bobby Bounds-California Construction,Phone:972-670-0368;via E-mail:Bobby @CalConTex.com
Texas CMT,Inc. TBPE Firm: F-4521 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the fill approval of Te CMT,Inc. The use of our name must receive
our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
APR-30-2012 05:57 P.02/04
A
Texas C .\ ; T, Inc.
AVA
Construction Materials Testing GEE consultants, Inc.
and Environmental Consulting
10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com
REINFORCING STEEL PLACEMENT REPORT
Report Date: April 30,2012 Test Date: April 20,2012
Client: City of Coppell Reinforcing Steel Report No. 10
Project: Deforest Road Reconstruction,Coppell,Texas Project Number: 211-0125
Identification: Reinforcing Steel Observation City of Coppell Project Number: ST-05-01
Method of Test: Visual Observation Page: 1 of 1
Results:
On April 20, 2012 reinforcing steel was observed at the following locations:
• Retaining Wall Spread Footing from (approximately) Station 14+51 to 13+7
There were no discrepancies.
•
Technician: RG
cc: Mr.Larry Davis-City of Coppell, Phone:972-304-3684;via Fax: 972-304-3570
Mr.George Marshall-City of Coppell,Phone:972-304-3562;via E-mail:gMarshall @coppelltx.gov
Mr.Dan DeGroot-Burgess&Niple,Inc.,Phone:972-620-1255;via E-mail:Dan.DeGroot @BurgessNiple.com
Mr. Robert Caudill-Tiseo Paving Company,Phone:972-289-0723;via E-mail:rCaudill @TiseoPaving.com
Mr. Walter Mitchell-Tiseo Paving Company,via E-mail:barnobas @yahoo.com
Mr.Bobby Bounds-California Construction,Phone:972-670-0368;via E-mail: Bobby @CalConTex.com
Texas CMT,Inc. TBPE Firm: F-4521 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive
Y eP PP
our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.