Loading...
ST0501-LR120430 (2) APR-30-2012 05:58 P.03/04 C Texas CMT, Inc. Construction Materials Testing GEE COflSU ltants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: April 30, 2012 Date Concrete Placed: March 28, 2012 Standard 6"x12"Cylinders- Client: City of Coppell Cylinder Cross-sectional Area:28.27 Square Inches Project: Deforest Road Reconstruction Concrete Report No.: 10 Contractor: California Construction Project No.: ST-05-01 Concrete Supplier and Plant: Redi-Mix Concrete /P259 Location of Placement: Retaining Wall Footing MATERIALS Source/ SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 10L11504 Time Sample Batched: 11:25 AM Cement: Time Sampled: 12:25 PM Fl Ash: Sample Location: Sta. 18+64 Fly Truck/Ticket No: 1321 /25448064 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 66°F Fine Aggregate: Concrete Range: 77°F Admixtures: Slump Range(inches): 4.0 Weather Conditions: Cloudy 1 Time Started: 10:00 AM 2 Time Completed: 2:00 PM Added Water: 15 Gallons Sample Air Content(%): 4.6 Total Cubic Yards Placed: 10 Required Strength(Lbs./sq.in.): 3,600 Specimen Measured Age Date Total Load Compressive Strength Remarks Number Slump(in.) (Days) Tested (Lbs.) (Lbs./Sq.In.) DFR37 7 4/4/12 117,680 4,160 DFR 38 28 4/25/12 140,780 4,''■ DFR 39 4.0 28 4/25/12 145,380 (.,140 DFR 40 H Hold Test Methods Utilized Fracture Regular ASTM C-31, C-39,C-143 (Unless Noted Otherwise) Cylinders Made By: RG Remarks and/or Distribution: cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall- City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot- Burgess &Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot@BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill@TiseoPaving.com / Mr. Walter Mitchell -Tiseo Paving Company, via E-mail: barnobas @yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: 02044------ All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. APR-30-2012 05:58 P.04/04 A Texas CMT, Inc. Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: April 30, 2012 Date Concrete Placed: April 2, 2012 Standard 6"x12"Cylinders Client: City of Coppell Cylinder Cross-sectional Area:28.27 Square Inches Project: Deforest Road Reconstruction Concrete Report No.: 1 1 Contractor: California Construction Project No.: ST-05-01 Concrete Supplier and Plant: Redi-Mix Concrete/ P236 Location of Placement: Retaining Wall Footing: Station 15+55 to 16+80 MATERIALS Source/ SSD Batch S. OBSERVATION DATA Description (Lbs/Cu Mix Number: 10L11504 / Time Sample Batched: 11:40 AM . Cement: Time Sampled: 12:55 PM Ash: - / Sample Location: Sta. 15+80 Fly ! 1 Truck/Ticket No: 1283/25450503 Coarse Aggregate: 4 ,/ Temperature: Intermediate Aggregate: Ambient Range: 77°F Fine Aggregate: f Concrete Range: 81°F / Slump Range(inches): 4.25 Admixtures: Weather Conditions: Partly Cloudy 1 2 Time Started: 11:00 AM Time Completed: 3:00 PM Added Water: 20 Gallons Sample Air Content(%): 5.3 Total Cubic Yards Placed: 10 _ Required Strength(Lbs./sq.in.): 3,600 Specimen Measured Age Date Total Load Compressive Strength Remarks Number Slump(in.) (Days) Tested (Lbs.) (Lbs./Sq.In. DFR 41 7 4/9/12 123,620 4 3 DFR 42 4 25 28 4/30/12 152,100 ' DFR 43 28 4/30/12 150,980 Wit ' DFR 44 H Hold Test Methods Utilized Fracture Regular Cylinders Made By: RG ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Larry Davis- City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall- City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot- Burgess&Niple, Inc., Phone: 972-620-1255;via E-mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723;via E-mail: rCaudill@TiseoPaving.com Mr. Walter Mitchell-Tiseo Paving Company, via E-mail: barnobas @yahoo.com Mr. Bobby Bounds -California Construction, Phone: 972-670-0368; via E-mail: Bobby @Ca1ConTex.com Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: 02.-441/4_____ All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. TOTAL P.04