Loading...
Petterson Addn-CS120508 Rhonda Adloo From: Rhonda Adloo Sent: Tuesday, May 08, 2012 1:48 PM To: rupertkeeping @verizon.net Subject: Fee file for Petterson Addition Attachments: IMAGE.jpg; IMAGE.jpg; IMAGE.gif; IMAGE.jpg; fee file.pdf Mr. Keeping, Keith Marvin asked me to send this document to you. It shows the total of fees paid thus far on the Petterson Addition beginning in 1999, with subsequent revisions to the assessment and payments received. Let Keith know if you have questions about the document or its contents. Rhonda Adloo Engineering Department Administrative Technician 972/304-3682 radloo @coppel Itx.gov Consider the environment before printing this email. 401.4 At'€t t,4 lacetkP9K =J J C cy cl Copp vii TX CityOfCoppe9 1 DEVELOPMENT FEES PROJECT NAME: Petterson Addition Replat ENGINEER: Hamilton/Duffy ORIGINATION DATE: 2/28/2007 SENT ASSESSMENT ASSESSED FEE AMOUNT PAIL DATE Water Impact Fee $7,515.00 $900.00 -` Wastewater Impact Fee $6,012.00 $900.00 Park Fee $5,140.00 $3,855.00 "— Car' L 0 $1,285.00 rdll /�� Roadway Impact-Zone $2,544.00 $1,710.00 $198.00 Street Sign $636.00 cd 1/29/2009 Street Light Construction Inspection TBD EG or Bore Permit Overtime Inspection Water Tap Inspection $200.00 Wastewater Tap Inspection $200.00 Water Meter(Domestic) $250.96 Water Meter (Fire/Irrig) $0.00 Meter Deposit (Domestic) $120.00 Meter Deposit (Fire/Irrig) $0.00 Utility Final Inspection $200.00 Subtotal to Eng. $7,684.00 $7,684.00 $0.00 Total Fees Fees Paid Amount Owed TOTALS $22,181.96 $9,484.00 $12,697.96 NOTES Prior To Construction Date Received Prior To Final Acceptance Erosion Control Approved As Built Plan Recd. E.P.A.-N.O.I. Recd. Paving Bond Recd. Const. Plan Approved Utilities Bond Recd. Erosion Control Maint. T H E C 1 T Y O F atti COPPELL 0 E' X A s May 9, 2008 Ed Kellie, P.E. Kellie Engineering, Inc. 200 Rufe Snow Dr. North Keller, TX 76248 RE: Petterson Addition Fee Assessment Letter Dear Mr. Kellie Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of$7,684.00 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to filing of the final plat. Please note that the Water and Sewer Impact Fees are due and payable at the issuance of a Building Permit. Also, please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be paid prior to scheduling a pre-construction meeting. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, �fi► Michael arza, EIT Graduate Engineer cc: Jennifer Miller, Finance Director Mary Beth Spletzer, Administrative Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 DEVELOPMENT FEE TABLE Project: Petterson Addition Lots 1-4 Replat Date: 2/28/2007(rev. 5/9/2008) TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $7,515.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $250.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $261.44 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $65.36 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $120.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $6,012.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $200.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $200.00 (100% due at Issuance of Building Permit) Park Fee $5,140.00 $5,140.00 (100% due prior to Filing Plat) Roadway Impact Fee $2,544.00 $2,544.00 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) II Street Sign Fee Information not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $22,337.80 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $7,684.00 DE. ELOPMENT FEE WORKSHEE PROJECT: Petterson Addition Lots 1-4 Replat DATE: 2/28/2007(rev. 5/9/2008) Water Impact Fee: Domestic Meter(s): 4 - 1 inch = 6.68 ESU's Irrigation Meter(s): 1 - 1 inch = 1.67 ESU's 0 = 0 ESU's Fireline Meter(s): 0 = 0 ESU's Total#: 8.35 ESU's @ $900.00 ea. $7,515.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total#: 5 Connections @ $50.00 ea. $250.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total#: 4 Domestic Meter(s) @ $65.36 $261.44 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total#: 1 Irrigation Meter(s) @ $65.36 $65.36 Total#: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total#: 0 Fireline Meter(s) @ $0.00 meter provided by developer (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total#: 4 Meter(s) @ $30.00 ea. $120.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total#: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 6.68 @ $900.00 ea. $6,012.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total#: 4 Connections @ $50.00 ea. $200.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total#: 4 Lots @ $50.00 ea. $200.00 (100% due prior to issuance of building permit) Page 1 DE. CLOPMENT FEE WORKSHEE Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Park Development Zone : Zone 1 4 Single-family @ $1,285.00 per lot $5,140.00 0 Multi-family @ $1,285.00 per unit $0.00 (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $2,544.00 Street Lighting Fees: Assessed for lighting in the City's right-of-way. Information not Available This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. Information not Available (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. Information not Available The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROAD‘v.AY IMPACT FEE CALCULATIONS PROJECT: Petterson Addition Lots 1-4 Replat DATE: 2/28/2007(rev. 5/9/2008) ROADWAY IMPACT FEE: Service Area * 1 Category ** Residential Land Use ** Residential(Medium/Low) No. Lots/Units 4 Development Units ** 4.00 Vehicle Miles per Development Unit ** 4.24 Fee per Vehicle Mile *** $150 Roadway Impact Fee due =(Development Units)x (Vehicle Miles per Development Unit)x(Fee per Vehicle Mile)= $2,544.00 * (Figure 4.1 -Roadway Impact Fee Study) ** (Table 4.10- Roadway Impact Fee Study) *** (Schedule 2,Page 3 -The Master Fee Schedule) AMOUNT DUE $2,544.00' Nance Jean Petter5on az-z-,,,o 3836 8 3 6 Y 440 Lebure Lae ,. Goppell,TX 7,O1G �- / 21-Q El 3 4. difi ;, 4 ,. to $43 , go BANK S ` • vx RICA ) l ACH R/r•"r. 4 .._.„f .;r:os ♦. 1 ' re CASH / Ai lb De �� 073444 RECEIPT l Received From 1 ea'.i.i - �� -/-- .: _. ' Address ;7 -;‘,(,, 3 , 11 � 7':„..,,,./.•�i2 i c2 >, I Dopers$(,,-),,,,, p 1'7,V For l,, !.-'1'�:L( J r ,C ) • f,')Q/ , , ( ACCOUNT HOW PAID r : AMT OF ACCOUNT CASH j 0 AMT.PAID J/ O.) CHECK.oria .s ^. BALANCE S �k' ,'` k 1 ' DUE MRNYITCDDQ By f i `" '_ 'I %, J / • , . e .........—.................................___,--.....—.‘ CASH RECEIPT Date 3/.7/0 7 ___ 0 7 3 3 2 9 Received From A, A Aril wir i NI , S.a ps.5 Address 4 VO / tile,. .."r .404111k/ a A 1 0 ,.__ 0 tt c) Dollars$ )11-1-F •ca o 1...:ist For • t _ S-0 A, Akio 4 __ a A iti cc. tyE_Ftkgse_F:L_____ ___ Z 1 kJ Di 6 Lis 8 • /400 ft A c.._ _A ACOOUNT HOW PAID an ACCOUNT CASH Mall 0 AMT PAI 0/.0 CHECK ;1=,..rffi S. 0 BALANCE MONTY ORDER 0 MINI By_ .■ DUE i ll CHF-DIF GARBO 32-2-1110 350 5 Nancuf Jean Petter3on 440 Lebure Lane Goppell,-r)( 7501c1 Yale 14 7 .... ,,. a(ti 1 6PP-e161 it4t, ce Oilad 00--graer,„,.., 8 Ezo:::: :I. /440-1"1/ kA.01.0144/ if4c1,1/*(AZZ, // 7z,i ' 'E • BANK OF AMERICA ACH WI'11100002 . ,,,, pautiLot LI T H E C I T Y 0 F COPPELL _ ,, ,,, ,,,,,,,A s . 1 / Februay28, 2007 N•~ / Nancy J. Petterson 440 Leisure Lane Coppell, TX 75019 4� RE: Petterson Addition Lots 1- 4 Fee Assessment Letter Pi 11- A Dear Ms. Petterson Enclosed is a copy of the City of Coppell Development Fees Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City4f Coppell in the amount of$7,048.00 and forward to the Engineering Department along with a copy o: (he Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to filing of the final plat. Please note that the Water and Sewer Impact Fees are due and payable at the issua,tce of a Building Permit. Please provide a copy of the Engineer's estimate or contract to our office* the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be p d prior to-the scheduled pre-construction meeting. The additional fees for water and sew taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works y°ervice Center, 816 S. Coppell Road. Meters will be provided, if in stock, or ordered, if not in stock, wJien those fees are paid. F r Appropriate payment of the re.,nnred fees will help ensure a successful beginning of this project. We look forward to working with you tin this project. If you have any questions, please contact me. r / Sincerely, X / -- //�� Kenneth M. Griffin, t.E. Director of Engine- ing/Public Works cc: Jennifer ' iller, Finance Director Mary :eth Spletzer, Administrative Secretary, Building Inspections Gle , Hollowell, Assistant Director of Public Works Gr:: Jones, Chief Building Official : ad Reid, Director of Parks and Recreation icha Duffy, Hamilton Duffy, PC Consulting 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 LEVELOPMENT FEE TABLE Project: Petterson Addition Lots 1-4 Replat Date: 2/28/2007 TOTAL AMOUNT ' E FEES DUE PRI I ' TO I ► ING PLAT Water Impact Fee $4,509.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $200 40 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $250.96 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) S120.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $4,509.00 (100% due at Issuance of Buildin• ermit) Wastewater Tap Inspection Fee $200.00 (100% due at Issuance of Bu'.i ing Permit) _ Utility Final Inspection Fee S200.00— (100% due at Issuance , Building Permit) Park Fee $5,140.00 $5,140.00 (100% due prior . Filing Plat) Roadway Impact Fee $1,908.00 $1,908.00 (100% due : for to Filing Plat) Street Light Fee Information not Available (100°/ due prior to Acceptance of Project) II Street Sign F- - Information not Available 10% due prior to Acceptance of Project) II Construe ion Inspection Fee Information not Available (100% due prior to Start of Construction) _ II TO AL $17,036.96 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $7,048.00 DL_JELOPMENT FEE WORKSHEET PROJECT: Petterson Addition Lots 1-4 Replat DATE: 2/28/2007 Water Impact Fee: Domestic Meter(s): 3 - 1 inch = 5.01 ESU's Irrigation Meter(s): 0 = 0 ESU's 0 = 0 ESU's Fireline Meter(s): 0 = 0 ESU's Total #: 5.01 ESU's @ $900.00 ea. $4,509.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. $200.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 4 Domestic Meter(s) @ $62.74 $250.96 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 0 Irrigation Meter(s) @ $0.00 $0.00 Total #: 0 Additional Irrigation Meter(s)@ $0.00 $0.00 Total #: 0 Fireline Meter(s) @ $0.00 $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 4 Meter(s)@ $30.00 ea. $120.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s)@ $30.00 ea. $0.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 5.01 @ $900.00 ea. $4,509.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total#: 4 Connections @ $50.00 ea. $200.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 4 Lots @ $50.00 ea. $200.00 (100% due prior to issuance of building permit) Page 1 DLJELOPMENT FEE WORKSHEtT Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Park Development Zone : Zone 1 4 Single-family @ $1,285.00 per lot $5,140.00 0 Multi-family @ $1,285.00 per unit $0.00 (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $1,908.00 Street Lighting Fees: Assessed for lighting in the City's right-of-way. Information not Available This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. Information not Available (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. Information not Available The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROAi, NAY IMPACT FEE CALCULA'IONS PROJECT: Petterson Addition Lots 1-4 Replat DATE: 2/28/2007 ROADWAY IMPACT FEE: Service Area * 1 Category** Residential Land Use** Residential(Medium/Low) No. Lots/Units 3 Development Units ** 3.00 Vehicle Miles per Development Unit** 4.24 Fee per Vehicle Mile *** $150 Roadway Impact Fee due=(Development Units)x (Vehicle Miles per Development Unit)x(Fee per Vehicle Mile)= $1,908.00 * (Figure 4.1 -Roadway Impact Fee Study) ** (Table 4.10-Roadway Impact Fee Study) *** (Schedule 2, Page 3 -The Master Fee Schedule) Note: Credit was given for a prior home that was on this site I AMOUNT DUB' $1;;948.04 CITY OF COPPELL J.E. Prepared by t JOURNAL ENTRY Approved by POSTED BY: FUND: DATE: 4° -`' 4 DATE: DESCRIPTION ACCOUNT DR. CR. NUMBER 6 .-`7o q4 I goo-oo C`.e�uah S 3 €3.s-,s--- --7 o-4 o 17 /O.G-O Abee s(Q.84(0_0 4 aG-G-O o<ho log-70 Q 06,Co �S 0000 3 e SS cto tR,ecti&... �.x- �m-�� q•o o tp 17 io.o-a er--V o.sLA P -1 N . C� TOTAL -3 co s-ao 3 EIS r CASH /o - 3-9g , .. RECEIPT Date - Q Received From I:1 cm a� Ca — Address o� 0 a c2 0 5,1 Dollars S �� o q Vco For %f1�vc�-Cf — IC)-,z- X-',-.L_.--v----,r 1 � O Y _ N 1 Z'a C- O ACCOUNT HOW PAID CV ^.',' CASH ACC: nr Am-?a.c 1.3:01 I CHECK ?,a,,ah�.= MCNEY ORDER QQ By4 '2IE —0 I CRECITCAM Nancy J. Petterson 717 Cowboys Pkwy 7 Apt 2048 _ n' 68-1/510 Irving TX 75063-7725 v u/V,E0 19 7 1 Valid 7hrot?gh June 30. 1999 Pay to the 67_1--/ .6 t & "/7 Gt/ / 0v order of $ 7-3‘s-, s-, 96(4--24/1-'' //7/�=T/7CGtND t c� jx 9' j1 c r4 Dollars BankofAmerica�� Bank of America,NA(USA) y Phoenix,Arizona payable through NationsBank,NA. Richmond,Virginia Memo Q 111 / �/-i4iE'k eo�b WRY �.'' ,.c�` �� _ . -I-/`1eACie r/4 2or/ 62 4„ ®„ PO.Box 478 Coppell,Texas 75019 ff ,, ' The City With A Beautiful Future 97z-4sz-oozz P.O.BOX 478 is----) (-- COPPELL,TEXAS 75019 June 3, 1999 Rupert Keeping RE: Petterson Addition Fee Assessment Letter Park Development Zone : Zone 1 Dear Mr. Keeping: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of$7,365.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Please refer to the attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Kent M. Collins, E.I.T. Graduate Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Petterson Addition Date: 6/3/99 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $900.00 $900.00 (100% due prior to Council Approval) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $51.34 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $70.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $900.00 $900.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $100.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $100.00 (100% due at Issuance of Building Permit) Park Fee $3,855.00 $3,855.00 (100% due prior to Council Approval) Roadway Impact Fee $1,710.00 $1,710.00 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project II Street Sign Fee Information not Available (100% due prior to Acceptance of Project II Construction Inspection Fee Information not Available II TOTAL $7,786.34 I TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $7,365.00 DEVELOPMENT FEE WORKSHEET PROJECT: Petterson Addition DATE: 6/3/99 Water Impact Fee: Domestic Meter(s): 2 -5/8 inch X 3/4 inch = 2 ESU's Irrigation Meter(s): 0 = 0 ESU's 0 = 0 ESU's Fireline Meter(s): 0 = 0 ESU's Total#: 2 ESU's @ $450.00 ea. $900.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total#: 2 Connections @ $50.00 ea. $100.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total#: 2 Domestic Meter(s)@ $25.67 $51.34 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total#: 0 Irrigation Meter(s)@ $0.00 $0.00 Total#: 0 Additional Irrigation Meter(s)@ $0.00 $0.00 Total#: 0 Fireline Meter(s)@ $0.00 $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. $70.00 (100%due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total#: 0 Meter(s)@$30.00 ea. $0.00 (100%due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 2 @ $450.00 ea. $900.00 Wastewater Tap Inspection Fee: Total#: 2 Connections @ $50.00 ea. $100.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total#: 2 Lots @ $50.00 ea. $100.00 (100%due prior to issuance of building permit) Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Park Development Zone : Zone 1 3 Single-family @ $1,285.00 per lot $3,855.00 0 Multi-family @ $1,285.00 per unit $0.00 (50% paid prior to Council approval of final plat) (50%paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) $1,710.00 Street Lighting Fees: Assessed for lighting in the City's right-of-way. Information not Available This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. Information not Available (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. Information not Available The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Petterson Addition DATE: 6/3/99 ROADWAY IMPACT FEE: Service Area * 1 Category ** _ Residential Land Use ** Single-Family Detached No. Lots/Units 2 Development Units ** 2.00 Vehicle Miles per Development Unit ** 2.85 Fee per Vehicle Mile *** _ $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x(Fee per Vehicle Mile) = $1,710.00 Note that credit was given for 1 existing structure * (Figure 2-Roadway Impact Fee Study) ** (Table 3 -Roadway Impact Fee Study) *** (Schedule 2, Page 3 -Roadway Impact Fee Study)