Loading...
ST0501-LR120507 MAY-07-2012 22:26 P.01/15 • A Texas CMT, Inca Construction Materials Testing GEE COflSU Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352.6972 • www .texascmt.com s q)Z�L REINFORCING STEEL PLACEMENT REPORT Report Date: May 7,2012 � Test Date: April 24,2012 AM Client: City of Coppelt .�--- Rein rcing Steel Report No. 11 Project: Deforest Road construction,Coppell,Texas _,,,,. Project Number 211-0125 Identification: R inforc' g Steel Observation 'City of Coppell Project Number: ST-05-01 Method of Test: Visu bservation Page: 1 of 1 Results: On April 24, 2012 reinforcing steel was observed at the following locations: • Retaining wall stern fr (approximately) station 20+50 to 20+18 The following discrepan ies were noted and called to the attention of Polio, a representative of California Construction. • Add u-bars adjacent to each red wood joint. Post-it®Fax Note 7671 Date pages■ • Dowel bars not tied in place. To LARfy DAV IS From T < et.r, Co./Dept.JN5 p(CTDg/ 1C-�G oo. C E Can 5(.I/1-11-4 The above discrepancies were corrected as noted. Phone# 72 3 04-3‘$4 Phone#-z 14 3 2.‘' S7 Technician: RG Fax# 972-304-3 S 7 6 Fax#z 14 ,3 5Z.6,72....: cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot - Burgess &Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill- Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill @TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E-mail: barnobas @yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: ( 24944-4-' All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. MAY-07-2012 22:26 P.02/15 c Texas CMT, Inc. Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com • REINFORCING STEEL PLACEMENT REPORT Report Date: May 7,2012 Test Date: April 24,2012 PM Client: City of Coppell Reinforcing Steel Report No. 12 Project: Deforest Road Reconstruction,Coppell,Texas Project Number: 211-0125 Identification: Reinforcing Steel Observation City of Coppell Project Number: ST-05-01 Method of Test: Visual Observation Page: 1 of 1 Results: On April 24, 2012 reinforcing steel was observed at the following locations: • Retaining wall footing from (approximately) station 13+00 to 12+36 The following discrepancies were noted and called to the attention of Pollo, a representative of California Construction. f • H-bars not cut to length at station 12+36. • Add c-bars adjacent to redwood joints. The above discrepancies were scheduled to be checked again on April 25, 2012. . Technician: RG .. cc: Mr. Larry Davis-City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot- Burgess &Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill@TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E-mail: barnobas @yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com 02144114......„. . Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. MAY-07-2012 22:27 P.03/15 C Texas CMT, Inc. A vA Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044:Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com REINFORCING STEEL PLACEMENT REPORT Report Date: May 7,2012 Test Date: April 25,2012 Client: City of Coppell Reinforcing Steel Report No. 13 Project: Deforest Road Reconstruction,Coppell,Texas Project Number: 211-0125 Identification: Reinforcing Steel Observation City of Coppell Project Number: ST-05-01 Method of Test: Visual Observation Page: 1 of I Results: On April 25, 2012 reinforcing steel was observed at the following locations: • Retaining wall footing from (approximately) station 13+00 to 11+10 The following discrepancies were noted and called to the attention of Pollo, a representative of California Construction. • • Previous items of April 24, 2012 inspection.' • A & b-bars missing at first redwood joint. • T-bar too far from outside face of toe at several locations. • • A-bars too close to the heel. The above discrepancies were corrected as noted prior to concrete placement. Technician: RG cc: Mr. Larry Davis-City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot- Burgess&Niple, inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill @TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E-mail: barnobas @yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: 2aili`—' All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. MAY-07-2012 22:27 P.04/15 I AVA Texas C ,\; ! T, Inc. Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texasemt.com • REINFORCING STEEL PLACEMENT REPORT Report Date: May 7,2012 Test Date: April 27,2012 Client: City of Coppell Reinforcing Steel Report No. 15 Project: Deforest Road Reconstruction,Coppell,Texas Project Number: 211-0125 Identification: Reinforcing Steel Observation City of Coppell Project Number: ST-05-01 Method of Test: Visual Observation Page: 1 of 1 Results: On April 27, 2012 reinforcing steel was observed at the following locations: • Retaining wall footing from (approximately) station 11+10 to 10+14 The following discrepancies were noted and called to the attention of Polio, a representative of California Construction. • • Horizontal portion of Al and A2 bars did not have adequate clear cover at south edge of footing. The above discrepancies were corrected as noted prior to concrete placement. Technician: MR •. cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall- City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot-Burgess&Niple, Inc.,Phone: 972-620-1255; via E-mail: Dan.DeGroot@BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill @TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E-mail: barnobas@yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: '�4 All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. MAY-07-2012 22:27 P.05/15 Texas CMT, Inc. Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com REINFORCING STEEL PLACEMENT REPORT Report Date: May 7,2012 Test Date: April 30,2012 Client: City of Coppell Reinforcing Steel Report No.. 16 Project: Deforest Road Reconstruction,Coppell,Texas Project Number: 211-0125 Identification: Reinforcing Steel Observation City of Coppell Project Number: ST-05-01 Method of Test: Visual Observation Page: 1 of 1 Results: On April 30, 2012 reinforcing steel was observed at the following locations: • Retaining wall stem from (approximately) station 20+18 to 19+86 There were no discrepancies. Technician: RG cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall-City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot -Burgess & Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot @BurgessNiple.com. Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill@TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E-mail: barnobas@yahoo.com Mr. Bobby Bounds-California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com r /(/ Texas CMT. Inc. TBPE Firm: F-4521 Reviewed by: ,,,LLL"VVVSSS///--_--✓✓✓ All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. MAY-07-2012 22:27 P.06/15 C AIM Texas CMT, Inc. Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallis, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com • REINFORCING STEEL PLACEMENT REPORT Report Date: May 7,2012 Test Date: May 1,2012 Client: City of Coppell Reinforcing Steel Report No. 17 Project: Deforest Road Reconstruction,Coppell,Texas Project Number: 211-0125 Identification: Reinforcing Steel Observation City of Coppell Project Number: ST-05-01 Method of Test: Visual Observation Page: 1 of 1 Results: • On May 1, 2012 reinforcing steel was observed at the following locations: • Retaining wall footing from (approximately) station 10+13 to 9+83 The following discrepancies were noted and called to the attention of Jose, a representative of California Construction. • Aluminium cans and plastic water bottles in keyway. The above discrepancies were corrected as noted. Technician: RG cc: Mr. Larry Davis -City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot - Burgess&Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill @TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E-mail: barnobas @yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com• gi(4614—'- Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. MAY-07-2012 22:27 P.07/15 ATA Texas CMT, Into COIIStrRCrion Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com REINFORCING STEEL PLACEMENT REPORT Report Date: May 7,2012 Test Date: May 2,2012 Client: City of Coppell Reinforcing Steel Report No. 18 Project: Deforest Road Reconstruction,Coppell,Texas Project Number: 211-0125 Identification: Reinforcing Steel Observation City of Coppell Project Number: ST-05-01 Method of Test: Visual Observation Page: 1 of 1 Results: On May 2, 2012 reinforcing steel was observed at the following locations: • Retaining wall footing from (approximately) station 9+83 to 8+86 The following discrepancies were noted and called to the attention of Jose, a representative of California Construction. • Redwood joint and dowels not ready at station 8+86. J Y The above discrepancies were corrected as noted. . Technician: RG cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall -City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot - Burgess & Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill @TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E-mail: barnobas @yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368;via E-mail: Bobby @CalConTex.com Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: / - All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. MAY-07-2012 22:28 P.08/15 Texas CMT, Inc. Construction Materials Testing GEE COnsUltafltSS Inc. and Environmental Consulting 10044:Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com REINFORCING STEEL PLACEMENT REPORT • Report Date: May 7,2012 Test Date: May 3,2012 Client: City of Coppell Reinforcing Steel Report No. 19 Project: Deforest Road Reconstruction,Coppell,Texas Project Number: 211-0125 Identification: Reinforcing Steel Observation City of Coppell Project Number: ST-05-01 Method of Test: Visual Observation Page: 1 of 1 Results: On May 3, 2012 reinforcing steel was observed at the following locations: • Retaining wall footing from (approximately) station 8+86 to 7+90 . • There were no discrepancies. Technician: RG cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot - Burgess &Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot@BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill @TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E-mail: barnobas @yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: r:524147 All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,lnc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. MAY-07-2012 22:28 P.09/15 Texas CMT, Inc. Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044'Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com REINFORCING STEEL PLACEMENT REPORT Report Date: May 7,2012 Test Date: May 4,2012 Client: City of Coppell Reinforcing Steel Report No. 20 Project: Deforest Road Reconstruction,Coppell,Texas Project Number: 211-0125 Identification: Reinforcing Steel Observation City of Coppell Project Number: ST-05-01 Method of Test: Visual Observation Page: 1 of 1 Results: On May 4, 2012 reinforcing steel was observed at the following locations: • Retaining wall footing from (appr imately) station 17+80 to 17+16 There were no discrepancies. Technician: RG cc: Mr. Larry Davis- City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov . Mr. Dan DeGroot-Burgess & Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill @TiseoPaving.com Mr. Walter Mitchell -Tiseo Paving Company, via E-mail: barnobas @yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com Texas CMT, Inc. TBPE Firm: F-4521 Reviewed bv: LAC 'wit All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. MAY-07-2012 22:28 P.10/15 Texas CMT, Inc. Construction Materials Testing GEE Consultants Inc. and Environmental Consulting 100444 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com REINFORCING STEEL PLACEMENT REPORT Report Date: May 7,2012 Test Date:. May 7,2012 Client: City of Coppell Reinforcing Steel Report No. 21 Proj ect: Deforest Road Reconstruction,Coppell,Texas Project Number: 211-0125 Identification: Reinforcing Steel Observation City of Coppell Project Number: ST-05-01 Method of Test: Visual Observation Page: 1 of 1 Results: On May 7, 2012 reinforcing steel was observed at the following locations: • Retaining wall footing from (apprc mately) station 16+84 to 17+16 There were no discrepancies. Technician: RG cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot- Burgess &Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill @TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E-mail: bamobas @yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com x 0-24);14*-----Te as CMT, Inc. TBPE Farm: F-4521 Reviewed bv: All letters and reports are for the exclusive use'of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.