Lesley Retail Addn-CS120511 dôi½'iai
As 1 S
May 11, 2012
Bill Hale
Harman Construction
whale639 @gmail.com
RE: Dividend Drive (Lesley Retail Addition)
Final Walk-through Inspection of Improvements
Dear Mr. Hale:
Please be advised that a walk-through is scheduled for Monday, May 14, 2012 at 9:00
a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project.
Please ensure that all facilities are clean and accessible at that time and that contractor's
representatives are present to assist with the inspection.
Your cooperation in this effort is greatly appreciated. If you have any questions, please
call 972-304-3685 at your earliest convenience.
Sincerely,
Albert Samaniego
Construction Inspector
Office Phone: (972) 304-3685
Fax: (972) 304-7041
cc: Ken Griffin, P.E., Dir. of Engineering & Public Works
Keith Marvin, P.E., Project Engineer
Glenn Hollowell, P.E., Asst. Dir. of Public Works
Michael Arellano, Chief Building Official
Streets Dept.
Utilities Dept.
Tim Oates, Deputy Chief/Prevention
Jay London, Pacheco Loch Consulting Engineers
A FAMILY COMMUNITY FOR A LIFETIME
255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOY