Loading...
Willow Park-CS120522 May.22.2012 02:31 PM Public Works 9724625199 PAGE. 1/ 1 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: Larry Davis,Construction Inspector Engineering From: Frank Garza,Street Department Date: May 22,2012 RE: Walk-thru for Willow Park Tow nhomes DaVinci Ct: 1. Need to replace 2 sidewalk panels on right side of DaVinci Ct& clean up over-spilled grout on sidewalk. Marked with white paint. 2. Remove over-spill concrete from street. 3. Rout and seal crack on sidewalk next to parking area and also fix curb facing at parking lot. 4. Seal joints around fire hydrant meter. Rembrandt Ct: 1. Remove over-spill concrete from sidewalk and street. 2. Replace sidewalk panels that are marked next to storm drain box.Marked with white paint. 3. Fix facing of curb where marked with paint. 4. On both storm drain boxes need to rub inside&outside with grout. ferwiliof •to *54.9, 0 ?G9S (0/1(7 Mite � 5 Z 1/Zol2.- CITY OF COPPELL PUBLIC WORKS DEPARTMENT