Loading...
ST1002-LR120522Material Information Sample Information Specified Strength: 3,000 psi (a�, 28 days Mix ID: 1761 Supplier: Lattimore Batch Time: 1155 Plant: 955 Truck No.: 5008 Ticket No.: 64320874 Field Test Data Test Result Specification Slump (in): 5 3 -5 Air Content ( %): 6.1 3 -6 Concrete Temp. (F): 81 Ambient Temp. (F): 76 Plastic Unit Wt. (pcf): 144.5 Yield (Cu. Yds.): Sample Date: 04/19/12 Sample Time: 1253 Sampled By: Randall Hollis Weather Conditions: Clear Accumulative Yards: 14.5 Batch Size (cy): 4.5 Placement Method: Direct Discharge Water Added Before (gal): 5 Water Added After (gal): 0 Sample Location: NE corner of intersection Placement Location: Sidewalk (a�, NE & SE corners of ID intersection of S Coppell Rd. & (sq in) Bethel Rd. Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 1 1 6.00 28.27 04/20/12 04/23/12 4 73,460 2,600 1 1 2 6.00 28.27 04/20/12 04/26/12 7 112,700 3,990 3 1 3 6.00 28.27 04/20/12 04/26/12 7 104,800 3,710 6 Average (7 days) 3,850 1 4 6.00 28.27 04/20/12 05/17/12 28 126,140 4,460 2 1 5 6.00 28.27 04/20/12 05/17/12 28 123,360 4,360 2 Average (28 days) 4,410 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Randall Hollis Reported To: Contractor: Report Distribution: (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed Reviewed By: / (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed Eric J. Cleveland, P.E. (1) Freese and Nichols Inc, Emailed (1) JRJ Paving LP, Emailed Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOO1, 8- 27 -11, Revs Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Sampled By: Christopher Amoah Report Number: 94111246.0205 Clear, windy Accumulative Yards: 10 Batch Size (cy): 10 Placement Method: Direct Discharge Water Added Before (gal): 10 Water Added After (gal): 0 Service Date: 05/10/12 NW corner 8901 Carpenter Frwy. Suite 100 Report Date: 05/22/12 Fracture Dallas, TX 75247 Task: (in) 214- 630 -1010 Reg No: F -3272 Client Project (days) City of Coppell TX Old Town Coppell & Bethel Road Attn: Rick O'Dell #ST10 -02 1 Engineering Dept Between Coppell Rd & Freeport PO Box 9478 Coppell, TX 125,640 Coppell, TX 75019 Project Number: 94111246 Material Information Sample Information Specified Strength: 4,500 psi (a�, 28 days Mix ID: 1851 Supplier: Lattimore Batch Time: 1248 Plant: 95 Truck No.: 5002 Ticket No.: 63070178 Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Result Specification 4 3 -5 4.5 3 -6 88 80 149.4 Sample Date: 05/10/12 Sample Time: 1335 Sampled By: Christopher Amoah Weather Conditions: Clear, windy Accumulative Yards: 10 Batch Size (cy): 10 Placement Method: Direct Discharge Water Added Before (gal): 10 Water Added After (gal): 0 Sample Location: NW corner Placement Location: Retail Alley Grate Inlet at Sta. 5 +79 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 1 1 6.00 28.27 05/11/12 05/17/12 7 125,640 4,440 4 1 2 6.00 28.27 05/11/12 05/17/12 7 124,890 4,420 4 Average (7 days) 4,430 1 3 6.00 28.27 05/11/12 06/07/12 28 1 4 6.00 28.27 05/11/12 06/07/12 28 Comments: Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Christopher Amoah Reported To: Contractor: Report Distribution: (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed Reviewed By: / (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed Eric J. Cleveland, P.E. (1) Freese and Nichols Inc, Emailed (1) JRJ Paving LP, Emailed Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOO1, 8- 27 -11, Revs Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Sampled By: Christopher Amoah Report Number: 94111246.0206 Cloudy, windy Accumulative Yards: 5 Batch Size (cy): 5 Placement Method: Direct Discharge Water Added Before (gal): 0 Water Added After (gal): 0 Service Date: 05/10/12 At Bethel and Coppell intersection 8901 Carpenter Frwy. Suite 100 Report Date: 05/22/12 No. ID Dallas, TX 75247 Task: Received 214- 630 -1010 Reg No: F -3272 Client Project (psi) City of Coppell TX Old Town Coppell & Bethel Road Attn: Rick O'Dell #ST10 -02 05/11/12 Engineering Dept Between Coppell Rd & Freeport PO Box 9478 Coppell, TX 1 2 Coppell, TX 75019 Project Number: 94111246 Material Information Sample Information Specified Strength: 3,000 psi (a�, 28 days Mix ID: 1261 Supplier: Lattimore Batch Time: 1404 Plant: 952 Truck No.: 5005 Ticket No.: 62930858 Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Result Specification 41/2 3 -5 4.0 3 -6 85 80 145.8 Sample Date: 05/10/12 Sample Time: 1450 Sampled By: Christopher Amoah Weather Conditions: Cloudy, windy Accumulative Yards: 5 Batch Size (cy): 5 Placement Method: Direct Discharge Water Added Before (gal): 0 Water Added After (gal): 0 Sample Location: At Bethel and Coppell intersection Placement Location: Light pole bases on W bound Bethel No. ID Road from s Coppell to Main Street Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 1 1 6.00 28.27 05/11/12 05/17/12 7 100,100 3,540 2 1 2 6.00 28.27 05/11/12 05/17/12 7 99,860 3,530 5 Average (7 days) 3,540 1 3 6.00 28.27 05/11/12 06/07/12 28 1 4 6.00 28.27 05/11/12 06/07/12 28 Comments: Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Christopher Amoah Reported To: Contractor: Report Distribution: (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed Reviewed By: / (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed Eric J. Cleveland, P.E. (1) Freese and Nichols Inc, Emailed (1) JRJ Paving LP, Emailed Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOO1, 8- 27 -11, Revs Page 1 of 1 Material Information Sample Information Specified Strength: 4,500 psi (a�, 28 days Sample Date: 05/11/12 Sample Time: 1040 Sampled By: Albert Garcia Mix ID: 2025 Weather Conditions: Cloudy Supplier: Lattimore Accumulative Yards: 10 Batch Size (cy): 10 Batch Time: 0949 Plant: 955 Placement Method: Direct Discharge Truck No.: 3012 Ticket No.: 64321996 Water Added Before (gal): 0 Water Added After (gal): 0 Field Test Data Sample Location: Southeast corner of intersection Test Result Specification Placement Location: Paving - Bethel and Loch Slump (in): 5 3 - 5 Air Content ( %): 5.0 3 - 6 Concrete Temp. (F): 82 Ambient Temp. (F): 78 Plastic Unit Wt. (pcf): 145.2 Yield (Cu. Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 1 1 6.00 28.27 05/12/12 05/14/12 3 129,370 4,580 2 1 2 6.00 28.27 05/12/12 05/18/12 7 148,360 5,250 4 1 3 6.00 28.27 05/12/12 05/18/12 7 145,800 5,160 4 Average (7 days) 5,210 1 4 6.00 28.27 05/12/12 06/08/12 28 1 5 6.00 28.27 05/12/12 06/08/12 28 Comments: Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Albert Garcia Reported To: Contractor: Report Distribution: (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed Reviewed By: / (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed Eric J. Cleveland, P.E. (1) Freese and Nichols Inc, Emailed (1) JRJ Paving LP, Emailed Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOO1, 8- 27 -11, Revs Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Sampled By: Albert Garcia Report Number: 94111246.0209 Cloudy Accumulative Yards: 5 Batch Size (cy): 5 Placement Method: Direct Discharge Water Added Before (gal): 0 Water Added After (gal): 0 Service Date: 05/11/12 300' S of Freeport 8901 Carpenter Frwy. Suite 100 Report Date: 05/22/12 Fracture Dallas, TX 75247 Task: (in) 214- 630 -1010 Reg No: F -3272 Client Project (days) City of Coppell TX Old Town Coppell & Bethel Road Attn: Rick O'Dell #ST10 -02 1 Engineering Dept Between Coppell Rd & Freeport PO Box 9478 Coppell, TX 123,210 Coppell, TX 75019 Project Number: 94111246 Material Information Sample Information Specified Strength: 4,200 psi (a�, 28 days Mix ID: 1701 Supplier: Lattimore Batch Time: 1335 Plant: 955 Truck No.: 3021 Ticket No.: 6432014 Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Result Specification 4 3 -5 4.5 3 -6 82 82 145.8 Sample Date: 05/11/12 Sample Time: 1430 Sampled By: Albert Garcia Weather Conditions: Cloudy Accumulative Yards: 5 Batch Size (cy): 5 Placement Method: Direct Discharge Water Added Before (gal): 0 Water Added After (gal): 0 Sample Location: 300' S of Freeport Placement Location: Inlets, 516 Bethel Road and 300' S of Fracture Freeport Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 1 1 6.00 28.27 05/12/12 05/18/12 7 123,210 4,360 4 1 2 6.00 28.27 05/12/12 05/18/12 7 124,800 4,410 4 Average (7 days) 4,390 1 3 6.00 28.27 05/12/12 06/08/12 28 1 4 6.00 28.27 05/12/12 06/08/12 28 Comments: Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Albert Garcia Reported To: Contractor: Report Distribution: (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed Reviewed By: / (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed Eric J. Cleveland, P.E. (1) Freese and Nichols Inc, Emailed (1) JRJ Paving LP, Emailed Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOO1, 8- 27 -11, Revs Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 94111246.0213 Bernardino Rojas Weather Conditions: Service Date: 05/14/12 Accumulative Yards: 8901 Carpenter Frwy. Suite 100 Report Date: 05/22/12 Direct Discharge Dallas, TX 75247 Task: Water Added After (gal): 214 - 630 -1010 Reg No: F -3272 Client Project Placement Location: City of Coppell TX Old Town Coppell & Bethel Road Attn: Rick O'Dell #ST10 -02 12.57 Engineering Dept Between Coppell Rd & Freeport PO Box 9478 Coppell, TX 12.57 Coppell, TX 75019 Project Number: 94111246 Material Information Sample Information Specified Strength: 4,200 psi (a�, 28 days Mix ID: 1701 Supplier: Lattimore Batch Time: 1422 Plant: 95 Truck No.: 1091 Ticket No.: 564322062 Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Result Specification 5 1/2 3 -5 4.0 3 -6 88 82 148.6 Sample Date: 05/14/12 Sample Time: 1520 Sampled By: Bernardino Rojas Weather Conditions: Sunny, mostly cloudy Accumulative Yards: 10 Batch Size (cy): 10 Placement Method: Direct Discharge Water Added Before (gal): 0 Water Added After (gal): 0 Sample Location: See Placement Location Placement Location: Inlet at Sta. 16 +47 Set Specimen Diameter Area Date Date No. ID (in) (sq in) Received Tested 1 1 4.00 12.57 05/15/12 05/21/12 1 2 4.00 12.57 05/15/12 05/21/12 1 3 4.00 12.57 05/15/12 06/11/12 1 4 4.00 12.57 05/15/12 06/11/12 1 5 4.00 12.57 05/15/12 06/11/12 Comments: Samples Made By: Terracon Age at Maximum Compressive Test Load Strength Fracture (days) (lbs) (psi) Type 7 48,990 3,900 2 7 50,120 3,990 4 Average (7 days) 3,950 28 28 28 Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Bernardino Rojas Reported To: Contractor: Report Distribution: (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed Reviewed By: / (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed Eric J. Cleveland, P.E. (1) Freese and Nichols Inc, Emailed (1) JRJ Paving LP, Emailed Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOO1, 8- 27 -11, Revs Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Diameter No. Report Number: 94111246.0221 (in) 1 1 6.00 1 2 6.00 1 3 Service Date: 05/17/12 1 8901 Carpenter Frwy. Suite 100 Report Date: 05/22/12 Placement Location: Dallas, TX 75247 Task: and S. Coppell Rd. 214 - 630 -1010 Reg No: F -3272 Client Project City of Coppell TX Old Town Coppell & Bethel Road Attn: Rick O'Dell #ST10 -02 Engineering Dept Between Coppell Rd & Freeport PO Box 9478 Coppell, TX Coppell, TX 75019 Project Number: 94111246 Material Information Sample Information Specified Strength: 4,500 psi (a�, 28 days Mix ID: 1851 Supplier: Lattimore Batch Time: 0930 Plant: 95 Truck No.: 3030 Ticket No.: 564322196 Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Result Specification 5 1/2 3 -5 5.9 3 -6 90 82 144.4 Set Specimen Diameter No. ID (in) 1 1 6.00 1 2 6.00 1 3 6.00 1 4 6.00 Comments: Samples Made By: Terracon Area Date (sq in) Received 28.27 05/18/12 28.27 05/18/12 28.27 05/18/12 28.27 05/18/12 Sample Date: 05/17/12 Sample Time: 1030 Sampled By: Bernardino Rojas Weather Conditions: Sunny Accumulative Yards: 10 Batch Size (cy): 10 Placement Method: Direct Discharge Water Added Before (gal): 0 Water Added After (gal): 0 Sample Location: Bethel Rd. & S. Coppell Rd., NW corner Placement Location: Paving - intersection of Bethel Rd. and S. Coppell Rd. Age at Date Test Tested (days) 05/21/12 4 05/24/12 7 06/14/12 28 06/14/12 28 Maximum Compressive Load Strength Fracture (lbs) (psi) Type 103,210 3,650 2 Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Bernardino Rojas Reported To: Contractor: Report Distribution: (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed Reviewed By: / (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed Eric J. Cleveland, P.E. (1) Freese and Nichols Inc, Emailed (1) JRJ Paving LP, Emailed Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOO1, 8- 27 -11, Revs Page 1 of 1 SAMPLE PICK -UP REPORT Irerracon Report Number: 94111246.0216 Service Date: 05/15/12 8901 Carpenter Frwy. Suite 100 Report Date: 05/22/12 Dallas, TX 75247 214 - 630 -1010 Reg No:F -3272 Client Project City of Coppell TX Old Town Coppell & Bethel Road Attn: Rick O'Dell #ST10 -02 Engineering Dept Between Coppell Rd & Freeport PO Box 9478 Coppell, TX Coppell, TX 75019 Project Number: 94111246 TOTAL NUMBER OF CONCRETE CYLINDERS PICKED UP: 5 Report No.: 94111246.0213 No. of Cylinders: 5 Services: Concrete cylinder pickup. Terracon Rep.: Bernardino Rojas Reported To: Contractor: Report Distribution: (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed (1) Freese and Nichols Inc, Emailed (1) JRJ Paving LP, Emailed Reviewed By: ✓ r 4 e Z�Ai Eric J. Cleveland, P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10- 25 -10, Rev.9 Page 1 of 1 dgr SAMPLE PICK -UP REPORT Irerracon Report Number: 94111246.0218 Service Date: 05/16/12 8901 Carpenter Frwy. Suite 100 Report Date: 05/22/12 Dallas, TX 75247 214 - 630 -1010 Reg No:F -3272 Client Project City of Coppell TX Old Town Coppell & Bethel Road Attn: Rick O'Dell #ST10 -02 Engineering Dept Between Coppell Rd & Freeport PO Box 9478 Coppell, TX Coppell, TX 75019 Project Number: 94111246 TOTAL NUMBER OF CONCRETE CYLINDERS PICKED UP: 15 Report No.: 94111246.0214 No. of Cylinders: 15 Services: Concrete cylinder pickup. Terracon Rep.: Bernardino Rojas Reported To: Contractor: Report Distribution: (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed (1) Freese and Nichols Inc, Emailed (1) JRJ Paving LP, Emailed Reviewed By: ✓ r 4 e Z�Ai Eric J. Cleveland, P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10- 25 -10, Rev.9 Page 1 of 1 dgr SAMPLE PICK -UP REPORT Irerracon Report Number: 94111246.0220 Service Date: 05/17/12 8901 Carpenter Frwy. Suite 100 Report Date: 05/22/12 Dallas, TX 75247 214 - 630 -1010 Reg No:F -3272 Client Project City of Coppell TX Old Town Coppell & Bethel Road Attn: Rick O'Dell #ST10 -02 Engineering Dept Between Coppell Rd & Freeport PO Box 9478 Coppell, TX Coppell, TX 75019 Project Number: 94111246 TOTAL NUMBER OF CONCRETE CYLINDERS PICKED UP: 4 Report No.: 94111246.0217 No. of Cylinders: 4 Services: Concrete cylinder pickup. Terracon Rep.: Bernardino Rojas Reported To: Contractor: Report Distribution: (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed (1) Freese and Nichols Inc, Emailed (1) JRJ Paving LP, Emailed Reviewed By: ✓ r 4 e Z�Ai Eric J. Cleveland, P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10- 25 -10, Rev.9 Page 1 of 1 dgr SAMPLE PICK -UP REPORT Irerracon Report Number: 94111246.0223 Service Date: 05/18/12 8901 Carpenter Frwy. Suite 100 Report Date: 05/22/12 Dallas, TX 75247 214 - 630 -1010 Reg No:F -3272 Client Project City of Coppell TX Old Town Coppell & Bethel Road Attn: Rick O'Dell #ST10 -02 Engineering Dept Between Coppell Rd & Freeport PO Box 9478 Coppell, TX Coppell, TX 75019 Project Number: 94111246 TOTAL NUMBER OF CONCRETE CYLINDERS PICKED UP: 8 Report No.: No. of Cylinders Report No.: No. of Cylinders 94111246.0219 4 94111246.0221 4 Services: Concrete cylinder pickup. Terracon Rep.: Bernardino Rojas Reported To: Contractor: Report Distribution: (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed (1) Freese and Nichols Inc, Emailed (1) JRJ Paving LP, Emailed Reviewed By: ✓ r 4 e Z�Ai Eric J. Cleveland, P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10- 25 -10, Rev.9 Page 1 of 1 dgr SAMPLE PICK -UP REPORT Irerracon Report Number: 94111246.0225 Service Date: 05/19/12 8901 Carpenter Frwy. Suite 100 Report Date: 05/22/12 Dallas, TX 75247 214 - 630 -1010 Reg No:F -3272 Client Project City of Coppell TX Old Town Coppell & Bethel Road Attn: Rick O'Dell #ST10 -02 Engineering Dept Between Coppell Rd & Freeport PO Box 9478 Coppell, TX Coppell, TX 75019 Project Number: 94111246 TOTAL NUMBER OF CONCRETE CYLINDERS PICKED UP: 8 Report No.: No. of Cylinders Report No.: No. of Cylinders 94111246.0222 4 94111246.0224 4 Services: Concrete cylinder pickup. Terracon Rep.: Bernardino Rojas Reported To: Contractor: Report Distribution: (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed (1) City of Coppell TX, Emailed (1) Freese and Nichols Inc, Emailed (1) JRJ Paving LP, Emailed Reviewed By: ✓ r 4 e Z�Ai Eric J. Cleveland, P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10- 25 -10, Rev.9 Page 1 of 1 dgr