ST9401-AG 980512AGENDA REQUESq- FORM CITY COUNCIL MEETING: May 12, 1998 ITEM CAPTION: Consider approval of awarding Bid/Contract #Q-0498-02 for the construction of Denton Tap Road from Cottonwood Creek to State Highway 121 Bypass to Robcon, In~ i , , .; ~'BY,' CITY CO NCIL --- DATE, ,,~/~,,~ ~..,., BUDGET AMT. $ AMT. EST. $ +/- BUD:$ FINANCIAL COMMENTS: Funding for this project will be provided by various sources: 2,738,490 Street CIP; 79,352 Water/Sever CIP; 3~1,201 Escrows for construction lpproxtsmtely ,350,000 rill be funded by the ~ensral Fund, with a reimbursement potential from the Coppell Recreation Developsent Corporation, DIR. INITIALS: ~ FIN. REVIEW(~ CITY MANAGER REVIEW:///~ Agenda Request Fore - Revised 3/98 ,Document Name: Wen~S "T ~;' ,smmsss~/ll/~ F/ '/w" [ J~' MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To2 From: Mayor and City Council Ken Griffin, P.E., Dir. of Engineering and Public Works Consider approval of awarding Bid/Contract #Q-0498-02 for the construction of Denton Tap Road from Cottonwood creek to State Highway 121 Bypass to Rebcon, Inc. in the amount of $3,505,046.60; and authorizing the Mayor to sign. Date: May 12, 1998 On April 30, 1998 two bids were received and opened for the construction of Denton Tap Road from Cottonwood Creek to S.H. 121 Bypass. The low bidder on the project was Rebcon, Inc. Bid tabulations are attached for your review. The project was bid with 5 Sections and 2 Alternates which provides seven options to the City for award. Those included: Section 1- Paving, Drainage and Water Improvements; Section 2 - Landscaping and Irrigation; Section 3 - Bridge; Section 4 - Bridge Lighting and Electrical; and Section 5 - Additional Hike and Bike Trails. The 1st alternate in Section 2 - Landscaping pertains to herbiciding and scalping ryegrass and overseeding with Bermuda, if in fact ryegrass ts initially planted. The City is choosing not to award that alternate bid. The 2nd alternate in Section 3 - Bridge is utilization of cable concrete blocks in lieu of gabions beneath portions of the bridge. In the bid package it was assumed that the gabions baskets ~vould be entirely eliminated with the cable concrete. However, that is not the case. Only a portion of the gabions will be eliminated by utilization of the cable concrete. Once adjustments are made, the gabions are less expensive than the cable concrete, therefore, staff is not recommending awarding the alternate for the cable concrete. Staff is recommending awarding Option 4 which is the total base bid which includes Sections 1, 2, 3 & 4, plus the additional bid for the hike and bike trail which is Section 5. While the contractor was preparing the bid for this project, it was noted that some of the quantities for the concrete piers and abutments in Section 3 - Bridge were underestimated. Since the bid opening, the City's consultant, Wier and Associates has recalculated the quantities for those items and has concurred that there was an error in the original quantities. Because of the error in the original quantities, Section 3 - Bridge will be increased by $61,007.00. That increase brings the total bid on the road project and bridge to $3,582,687.90. In reviewing the bid items, staff is recommending that several not be awarded at this time. In Section 2 - Landscaping and Irrigation, staff is recommending that Items 23-37 not be awarded. Those items are for trees and additional landscaping. The total cost of that deduct is $67,641.30. Staff is still recommending that the irrigation system and the hydromulch be installed. In Section I ~ Paving, Drainage, & Water, staff is recommending that Pay Item #10, in the amount of $10,000 for the removal and replacement of the exercise area, not be awarded. Leisure Services staff has indicated that they can accomplish the removal of that exercise equipment. With the above mentioned deducts, staff is recommending the award of the Denton Tap Road project to Rebcon, Inc. in the amount of $3,505,046.60. This project will upgrade Denton Tap Road to a six-lane divided boulevard with an improved bridge. Along with this project, there is a substantial amount of trail associated amenities including a trail underpass on both sides of the bridge and also a 16 foot wider trail section on the east side of Denton Tap across the bridge. The project also includes bridge lighting, along Denton Tap Road and beneath the bridge for the underpasses. There is no additional street lighting along Denton Tap currently proposed with this project. Staff recommends the award of Bid #Q-0498-02 for the construction of Denton Tap Road from Cottonwood Creek to S.H. 121 Bypass to Rebcon Inc. in the amount of $3,505,046.60. Staff will be available to answer any questions at t'he Council meeting. "CITY OF COPPELL ENGINEERING-EXCELLENCE BY DESIGN" Wier &Associates, Inc. 4300 Beltway Place, Suite 130 Arlington, TX 76018 METRO 817/467-7700 PAVING AND DRAINAGE IMPROVEMENTS DENTON TAP ROAD COPPELL, DALLAS COUNTY, TEXAS RECEIVED: 10:00 a.m., April 30, 1998 Description ~ Paving, Drainage & Water System Improvements 1 Unclassified Excavation 2 Controlled-Density Fill 3 Borrow 4 R,O.W. Preparation & Clearing 5 Remove Existing Concrete Pavement 6 Remove Exist. Rolled Asphalt Curb 7 Existing Bridge Demolition & Removal 8 Remove Exist. Elevated 12" W.L. 9 Remove Exist. MBGF & Barricade 10 Remove & Replace City Park Exercise Equip. 11 Remove Exist. Curb Inlet & Flume 12 Remove Exist. 48" R.C.P. 13 Remove Exist. 48" Sloping Headwall 14 Remove Exist. 2-10'x5' Culvert & Headwalls 15 Remove Exist, 2-6'x5' Culvert & Headwalls 16 6" Lime Stabilized Subgrade 17 Hydrated Lime 18 8" 3000 PSI Concrete Pavement 19 6" 3000 PSI Concrete Driveway 20 5' Wide Concrete Sidewalk 21 Brick Pavers 22 4' Wide Concrete Flume 23 6" Rolled Asphalt Curb 24 4' Wide Gravel Jogging Path 25 Metal Beam Guard Fence 26 4" Topsoil & Hydromulch 27 Temporary 2" HMAC Pavement 28 Reflectorized White Pavement Markers 29 Non-reflectorized White Pavement Markers 30 6" to 8" Dia. Rock Rubble Riprap 31 Pull (Service) Box 32 3" Schedule 40 PVC Conduit 33 0' to 4' Tall Gravity Retaining Wall 34 4' to 6' Tall Gravity Retaining Wall 35 Pedestrian Handrail 36 8" PVC Storm Drain Pipe BID ENGINEER'S REBCON, INC. OPINION OF PROBABLE 1868 W. NORTHWEST HVVY. CONSTRUCTION COST DALLAS, TX 75220 Quantity Unit Unit Cost Total Cost Unit Cost Total Cost 6,190 CY $ 5.00 $ 30,950.00 $ 7.00 $ 43 26,991 CY $ 2.50 $ 67,477.50 $ 6.00 $ 161 23,601 CY $ 8.00 $ 188,808.00 $ 6.00 $ 141 22.4 STA $ 500.00 $ 11,200.00 $ 3,100.00 $ 69 1,856 SY $ 10.00 $ 18,560.00 $ 7.00 $ 12 266 LF $ 9.00 $ 2,394.00 $ 2.00 $ 1 LS $ 30,000.00 $ 30,000.00 $ 40,000.00 $ 40 1 LS $ 3,500.00 $ 3,500.00 $ 5,000.00 $ 5,000.00 285 LF $ 8.00 $ 2,280.00 $ 3.00 $ 85! 1 LS $ 3,500.00 $ 3,500.00 $ 10,000.00 $ 10,000.00 2 EA $ 500.00 $ 1,000.00 $ 1,000.00 $ 2,000.00 95 LF $ 6.00 $ 570.00 $ 14.00 $ 1,330.00 2 EA $ 250.00 $ 500.00 $ 500.00 $ 1 1 LS $ 8,000.00 $ 8,000.00 $ 6,000.00 $ 6,000.00 1 LS $ 6,000.00 $ 6,000.00 $ 6,000.00 $ 6,000.00 18,943 SY $ 2.00 $ 37,886.00 $ 1.50 $ 28 284.1 TON $ 95.00 $ 26,989.50 $ 92.00 $ 26 17,764 SY $ 23.00 $ 408,572.00 $ 30.00 $ 532 253 SY $ 28.00 $ 7,084.00 $ 28.00 $ 7,084.00 802 SY $ 22.00 $ 17,644.00 $ 21.00 $ 16,842.00 915 SY $ 55.00 $ 50,325.00 $ 70.00 $ 64,050.00 12 SY $ 22.00 $ 264.00 $ 45.00 $ 34 LF $ 9.00 $ 306.00 $ 10.00 $ 46 SY $ 30.00 $ 1,380.00 $ 20.00 $ 575 LF $ 20.00 $ 11,500.00 $ 15.00 $ 8,625.00 1 LS $ 23,064.00 $ 23,064.00 $ 37,000.00 $ 37,000.00 755 SY $ 20.00 $ 15,100.00 $ 24.00 $ 18,120.00 538 EA $ 6.00 $ 3,228.00 $ 5.80 $ 3,120.40 420 EA $ 3.00 $ 1,260.00 $ 3.30 $ 1,386.00 5 SY $ 50.00 $ 250.00 $ 7O.O0 $ 6 EA $ 200.00 $ 1,200.00 $ 300.00 $ 1,800.00 601 LF $ 4.00 $ 2,404.00 $ 4.00 $ 2,404.00 290 LF $ 60.00 $ 17,400.00 $ 85.00 $ 24,650.00 198 LF $ 70.00 $ 13,860.00 $ 150.00 $ 29,700.00 382 LF $ 50.00 $ 19,100.00 $ 23.00 $ 8,786.00 95 LF $ 12.00 $ 1,140.00 $ 33.00 $ 3,135.00 TABULATION ED BELL CONSTRUCTION ry. P.O. BOX 540787 DALLAS, TX 75354 ~t Unit Cost Total Cost }.00 $ 5.00 $ 30,950.00 3.00 $ 5.75 $ 155, 198.25 3.00 $ 6.50 $ 153,406.50 ).00 $ 600.00 $ 13,440.00 2.00 $ 4.00 $ 7,,' ~' O0 2.00 $ 4.00 $ 1 ,~. ~.00 :).00 $ 58,000.00 $ 58,000.00 ).00 $ 5,000.00 $ 5,000.00 5.00 $ 5.00 $ 1,425.00 }.00 $ 5,000.00 $ 5,000.00 }.00 $ 700.00 $ 1,400.00 ).00 $ 18.00 $ 1,710.00 ).00 $ 1,500.00 $ 3,000.00 ).00 $ 20,000.00 $ 20,000.00 ).00 $ 10,000.00 $ 10,000.00 ~,.50 $ 1.25 $ 23,678.75 7.20 $ 100.00 $ 28,410.00 ).00 $ 23.00 $ 408,572.00 $.00 $ 33.00 $ 8,349.00 ~-.00 $ 22.00 $ 17,644.00 %00 $ 60.00 $ 54,900.00 ).00 $ 100.00 $ 1 00 ).00 $ 15.00 $ 5 ~o.00 ) .00 $ 40.00 $ 1,840.00 5.00 $ 25.00 $ 14,375.00 ).00 $ 25,000.00 $ 25,000.00 ).00 $ 25.00 $ 18,875.00 ).40 $ 7.50 $ 4,035.00 3.00 $ 2.50 $ 1,050.00 ) .00 $ 100.00 $ 500.00 ).00 $ 320.00 $ 1,920.00 k00 $ 4.20 $ 2,524.20 ).00 $ 87.00 $ 25,230.00 ).00 $ 155.00 $ 30,690.00.. L00 $ 35.00 $ 13,370.00 L00 $ 32.00 $ 3,040.00. WA #94093 Page 1 of 5 Wier &Associates, Inc. 4300 Beltway Place, Suite 130 Arlington, TX 76018 METRO 817/467-7700 PAVING AND DRAINAGE iMPROVEMENTS DENTON TAP ROAD COPPELL, DALLAS COUNTY, TEXAS RECEIVED: 10:00 a.m., April 30, 1998 Description 37 21" RCP Class III 38 27" RCP Class III 39 30" RCP Class 40 33" RCP Class III 41 36" RCP Class III 42 45" RCP Class III 43 51" RCP Class Ill 44 54" RCP Class III 45 60" RCP Class III 46 60" RCP Class IV 47 10' Recessed Curb Inlet 48 12' Recessed Curb Inlet 49 3'X3' Drop Inlet 50 Special Grate Inlet 51 60" Type "B" Headwall 52 2:27 Concrete Trench Backfill 53 Asphalt Pavement Repair @ S.D. Crossing 54 Adjust G.V. Box 55 Adjust SSMH 56 Adjust Exist. F.H. 57 Lower Exist. 12" W.L. 58 6' Water Main 59 16" D.I. Water Main 60 Elevated 16" W.L. Crossing 61 Make Dry Connection to 16" W.L. 62 Salvage & Install exist. 2" Air Release Valve 63 2" W.S. & Tap, Ball Valve & Locked Meter Box 64 Fire Hydrant Assembly 65 Cast Iron Fittings 66 Crushed Stone Bedding 67 Trench Safety 68 Non-reinforced Silt Fence 69 Reinforced Silt Fence 70 Inlet Treatment S U BTOTAL II Landscaping & Irrigation TABULATION BID ENGINEER'S REBCON, iNC. OPINION OF PROBABLE 1868 W. NORTHWEST HWY. CONSTRUCTION COST DALLAS, TX 75220 Quantity Unit Unit Cost Total Cost Unit Cost Total Cost 204 LF $ 43.00 $ 8,772.00 $ 55.00 $ 11,220.00 93 LF $ 48.00 $ 4,464.00 $ 67.00 $ 6,231 135 LF $ 56.00 $ 7,560.00 $ 71.00 $ 9,585.00 110 LF $ 62.00 $ 6,820.00 $ 78.00 $ 8,580.00 316 LF $ 68.00 $ 21,488.00 $ 88.00 $ 27,808.00 170 LF $ 85.00 $ 14,450.00 $ 110.00 $ 18,700.00 172 LF $ 105.00 $ 18,060.00 $ 137.00 $ 23 311 LF $ 120.00 $ 37,320.00 $ 148.00 $ 46,028.00 247 LF $ 140.00 $ 34,580.00 $ 170.00 $ 41,990.00 195 LF $ 150.00 $ 29,250.00 $ 225.00 $ 43,875.00 5 EA $ 2,000.00 $ 10,000.00 $ 2,200.00 $ 11,000.00 1 EA $ 2,300.00 $ 2,300.00 $ 2,600.00 $ 2,600.00 2 EA $ 2,000.00 $ 4,000.00 $ 1,300.00 $ 2,600.00 1 EA $ 1,200.00 $ 1,200.00 $ 1,400.00 $ 1,400.00 1 EA $ 2,600.00 $ 2,600.00 $ 2,700.00 $ 3 LF $ 30.00 $ 90.00 $ 220.00 $ 660.00 118 LF $ 50.00 $ 5,900.00 $ 36.00 $ 15 EA $ 150.00 $ 2,250.00 $ 220.00 $ 3,300.00 2 EA $ 500.00 $ 1,000.00 $ 500.00 $ 1 3 EA $ 1,000.00 $ 3,000.00 $ 1,100.00 $ 3,300.00 I EA $ 1,200.00 $ 1,200.00 $ 5,000.00 $ 5,000.00 23 LF $ 25.00 $ 575.00 $ 64.00 $ 1,472.00 38 LF $ 40.00 $ 1,520.00 $ 110.00 $ 4 I LS $ 45,000.00 $ 45,000.00 $ 30,000.00 $ 30,000.00 2 EA $ 1,000.00 $ 2,000.00 $ 1,000.00 $ I LS $ 1,000.00 $ 1,000.00 $ 800.00 $ 800.00 2 EA $ 700.00 $ 1,400.00 $ 1,600.00 $ 3,200.00 1 EA $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 1.0 TON $ 2,800.00 $ 2,800.00 $ 3,800.00 $ 3,800.00 100 CY $ 22.00 $ 2,200.00 $ 22.00 $ 2,200.00 1,820 LF $ 1.00 $ 1,820.00 $ 1.10 $ 2,002.00 1,688 LF $ 2.00 $ 3,376.00 $ 2.50 $ 4,220.00 700 LF $ 3.00 $ 2,100.00 $ 3.50 $ 2,450.00 8 EA $ 150.00 $ 1,200.00 $ 210.00 $ 1,660.00 $ 1,317,491 o00 $ 1,653 ED BELL CONSTRUCTION (. P.O. BOX 540787 DALLAS. TX 75354 Unit Cost Total Cost .00 $ 40.00 $ 8,160.00 .00 $ 50.00 $ 4,650.00 .oo $ 6o.ooj.$ 8,1oo.oo .00 $ 70.00 $ 7,700.00 .00 $ 80.00 $ 25,280.00 .00 $ 125.00 $ 21,250.00 .00 $ 145.00 $ 24? 'q.O0 700 $ 160.00 $ 49, ..00 .00 $ 180.00 $ 44,460.00 .00 $ 250.00 $ 48,750.00 .00 $ 2,500.00 $ 12,5(70.00 ]00 $ 2,800.00 $ 2,800.00 .06 $ 2,200.00 $ 4,400.00 ~00 $ 3,000.00 $ 3,000.00 .00 $ 4,000.00 $ 4,000.00 .00 $ 500.00 $ 1,500.00 .00 $ 80.00 $ 9,440.00 .00 $ 200.00 $ 3,000.00 .00 $ 750.00 $ 1,500.00 .00 $ 2,000.00 $ 6,000.00 .00 $ 4,500.00 $ 4,500.00 .00 $ 50.00 $ 1,150.00 .00 $ 140.00 $ 5,320.00 .00 $ 25,000.00 $ 2F '}.00 .00 $ 500.00 $ 1 ,uuO.O0 .00 $ 4,500.00 $ 4,500.00 .00 $ 2,300.00 $ 4,600.00 .00 $ 3,000.00 $ 3,000.00 .00 $ 3,000.00 $ 3,000.00 .00 $ 22.00 $ 2,200.00 .00 $ 2.00 $ 3,640.00 .00 $ 1.00 $ 1,688.00 .oo $ 1.5o $ 1,o5o.(?p .00 $ 75.00 $ 600.00 .10 $ 1,505,168.70 WA #94093 Page 2 of 5 Wier &Associates, Inc. 4300 Beltway Race, Suite 130 Arlington, TX 76018 METRO 817/467-7700 ,PAVING AND DRAINAGE IMPROVEMENTS DENTON TAP ROAD .COPPELL, DALLAS COUNTY, TEXAS RECEIVED: 10:00 a.m., April 30, 1998 Description 1 2" PVC Schedule 40 Irrigation Sleeve 2 4" PVC Schedule 40 Irrigation Sleeve 3 6" PVC Schedule 40 Irrigation Sleeve 4 2" W.S. for Irrigation 5 2" Double Check Valve 6 2-1/2" PVC Pipe for Irrigation 7 2" PVC Pipe for Irrigation 8 1-1/2" PVC Pipe for Irrigation L 9 1-1/4" PvC Pipe for Irrigation 10 1" PVC Pipe for Irrigation 11 3/4" PvC Pipe for Irrigation 12 Hunter Rotary Sprinkler Heads ' 13 Rainbird 1812 Spray Sprinkler Heads 14 Rainbird 1804 Pop-up Sprinkler Heads 15 14 Gauge Wire 16 Hardie 1-1/2" 700 Series Valves 17 Hardie 2" 700 Series Valves 18 Mini-Cfik freeze sensors 19 Mini-Clik rain sensors 20 Quick couplers 21 MSI-IU-S-R 16-Station Controller 22 MSS-IS-S 8-Station Controller 23 Live Oak 24 Shumard Red Oak 25 Cedar Elm 26 'q'uscarora" Crape Myrtle 27 Aristocrat Pear 28 Oklahoma Redbud 29 Austrian Pine 30 Leyland Cypress 31 Maidengrass 32 Tam Juniper 33 'Big Blue' Liriope 34 Purple Wintercreeper 35 4" Bed Preparation 36 2" Mulch Topdressing 37 4" Steel Bed Edging TABULATION BID ENGINEER'S REBCON, INC. OPINION OF PROBABLE 1868 W. NORTHWEST HWY. CONSTRUCTION COST DALLAS, TX 75220 Quantity Unit Unit Cost Total Cost Unit Cost Total Cost 7 LF $ 3.00 $ 21.00 $ 3.00 $ 21.00 533 LF $ 4.00 $ 2,132.00 $ 4.00 $ 2,132.00 302 LF $ 6.00 $ 1,812.00 $ 5.00 $ 1,510.00 2 EA $ 650.00 $ 1,300.00 $ 6,800.00 $ 13,600.00 2 EA $ 700.00 $ 1,400.00 $ 600.00 $ 1,200.00 1,700 LF $ 2.10 $ 3,570.00 $ 1.70 $ 2,890.00 240 LF $ 1.95 $ 468.00 $ 1.60 $ 384,00 320 LF $ 1.82 $ 582.40 $ 1.30 $ 416.00 640 LF $ 1.70 $ 1,088.00 $ 1.00 $ 640.00 1,620 LF $ 1.50 $ 2,430.00 $ 0.85 $ 1,377.00 4,000 LF $ 1,43 $ 5,720.00 $ 0.65 $ 2,600,00 30 EA $ 78.00 $ 2,340.00 $ 21.00 $ 630.00 70 EA $ 30.00 $ 2,100.00 $ 20.00 $ 1,400.00 307 EA $ 12.50 $ 3,837.50 $ 7.00 $ 2,149.00 15,000 LF $ 0.33 $ 4,950.00 $ 0.12 $ 1,800.00 4 EA $ 266.00 $ 1,064.00 $ 150.00 $ 600.00 13 EA $ 340.00 $ 4,420.00 $ 180.00 $ 2,340.00 2 EA $ 198.00 $ 396.00 $ 40.00 $ 80.00 2 EA $ 182.00 $ 364.00 $ 45.00 $ 90.00 13 EA $ 207.00 $ 2,691,00 $ 160.00 $ 2,080.00 I EA $ 2,800.00 $ 2,800.00 $ 7,300.00 $ 7,300.00 I EA $ 2,500.00 $ 2,500.00 $ 1,700.00 $ 1,700.00 10 EA $ 750.00 $ 7,500.00 $ 610.00 $ 6,100.00 12 EA $ 750.00 $ 9,000.00 $ 610.00 $ 7,320.00 33 EA $ 750.00 $ 24,750.00 $ 610.00 $ 20,130.00 32 EA $ 518.00 $ 16,576.00 $ 350.00 $ 11,200.00 8 EA $ 518.00 $ 4,144.00 $ 380.00 $ 3,040.00 14 EA $ 325.00 $ 4,550.00 $ 210.00 $ 2,940.00 8 EA $ 325.00 $ 2,600.00 $ 270.00 $ 2,160.00 14 EA $ 518.00 $ 7,252.00 $ 380.00 $ 5,320.00 52 EA $ 21.00 $ 1,092.00 $ 18.00 $ 936.00 99 EA $ 21.00 $ 2,079.00 $ 16.00 $ 1,584.00 1,675 EA $ 2.00 $ 3,350.00 $ 0.90 $ 1,507.50 797 EA $ 3.50 $ 2,789.50 $ 3.00 $ 2,391.00 3,336 SF $ 0.75 $ 2,502.00 $ 0.65 $ 2,168.40 3,336 SF $ 0.29 $ 967.44 $ 0.15 $ 500.40 172 LF $ 2.88 $ 495.36 $ 2.00 $ 344.00 ED BELL CONSTRUCTION P.O. BOX 540787 DALLAS, TX 75354 Unit Cost Total Cost ] $ 2,70 $ 18.90 ] $ 3.70 $ 1,972.10 ] $ 5.00 $ 1,510.00 ] $ 8,500.00 $ 17,000.00 ] $ 500.00 $ 1,000.00 ] $ 3.00 $ 5,100.00 3 $ 2.50 $ 600.00 3 $ 2.00 $ 6 0 3 $ 1.50 $ 960.00 3 $ 1.00 $ 1,620.00 D $ 1.00 $ 4,000.00 3 $ 40.00 $ 1,200.00 ] $ 25.00 $ 1,750.00 ] $ 10.00 $ 3,070.00 ] $ 0.15 $ 2,250.00 ::) $ 200.00 $ 800.00 D $ 250.00 $ 3,250.00 3 $ 150.00 $ 300.00 ] $ 150.00 $ 300.00 3 $ 75.00 $ 975.00 ::) $ 7,500.00 $ 7,500.00 ] $ 2,000.00 $ 2,000.00 ] $ 700.00 $ 7,000.00 ] $ 700.00 $ .8,z~-~ 00 ] $ 700.00 $ 23/,_ .O0 ] $ 350.00 $ 11,200.00 :) $ 400.00 $ 3,200.00 ) $ 300.00 $ 4,200.00 ] $ 300.00 $ 2,400.00 ] $ 400.00 $ 5,600.00 ], $ 25.00 $ 1,300.00 ) $ 22.00 $ .2,178:00 ) $ 1.50 $ 2,512.50 ) $ 4.00 $ 3,188.00 ) $ 1.00 $ 3,336.00 )] $ 1.00 $ 3,336.00 ) $ 2.00 $ 344.00 WA #94093 Page 3 of 5 Wier &Associates, Inc. 4300 Beltway Place, Suite 130 Arlington, TX 76018 METRO 817/467-7700 PAVING AND DRAINAGE IMPROVEMENTS DENTON TAP ROAD COPPELL, DALLAS COUNTY, TEXAS RECEIVED: 10:00 a.m., April 30, 1998 Description 38 Hydromulch Bermuda Grass SUBTOTAL III Bridge 1 6" 3000 PSI Concrete Riprap 2 18" Gabion Baskets 3 3'x3'x3' Gabion Baskets 4 Sheet Piles 5 12" to 18' Dia. Rock Rubble Riprap 6 4" SDR 35 PVC Perforated Drain 7 4" SDR 35 PVC Cleanout 8 18" Dia. Concrete Piers 9 30" Dia. Concrete Piers 10 36" Dia. Concrete Piers 11 30" Dia. Concrete Columns 12 Concrete Bridge Abutments 13 Concrete Interior Bents 14 Concrete Bridge Deck , 15 Concrete Approach Slabs 16 Concrete Bridge Curb & Sidewalk 17 Precast Concrete Beams 18 Armor Joints 19 Special Bridge Rails SUBTOTAL IV Bridge Lighting & Electrical 1 Pole Mounted Twin Fixture Light 2 Surface Mounted Area Light 3 Electric Meter Pad, Pedestal & Meter 4 Control Pad, Panels, Photocel & Box SUBTOTAL TOTAL BASE BID CONSTRUCTION V Alternate Bid Hike & Bike Trails I Unclassified Excavation 2 Controlled Density Fill Quantity Unit I LS $ 1,462 SY $ 534 CY $ 4 EA $ 10,912 SF $ 53 SY $ 368 LF $ 6 EA $ 224 LF $ 560 LF $ 910 LF $ 44 CY $ 135 CY $ 58.1 CY $ 618.8 CY $ 103 CY $ 192 CY $ 2,984 LF $ 440 LF $ 1,480 LF $ 8 EA $ 14 EA $ 1 LS $ 1 LS $ 3,170 1,425 CY CY BID ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST Unit Cost Total Cost 4,172.70 $ 4,172.70 $ 141,805.90 28.00 $ 40,936.00 180.00 $ 96,120.00 200.00 $ 800.00 12.00 $ 130,944.00 60.00 $ 3,180.00 22.00 $ 8,096.00 250.00 $ 1,500.00 37.00 $ 8,288.00 63.00 $ 35,280.00 93.00 $ 84,630.00 454.00 $ 19,976.00 403.00 $ 54,405.00 454.00 $ 26,377.40 450.00 $ 278,460.00 353.00 $ 36,359.00 353.00 $ 67,776.00 78.00 $ 232,752.00 6.00 $ 2,640.00 100.00 $ 148,000.00 $ 1,276,519.40 1,200.00 $ 9,600.00 300.00 $ 4,200.00 2,200.00 $ 2,200.00 5,200.00 $ 5,200.00 $ 21,200.00 $ 2,757,016.30 5.00 $ 2.50 $ 15,850.00 3,562.50 TABULATION ED BELL CONSTRUCTION P.O. BOX 540787 DALLAS, TX 75354 Unit Cost Total Cost )0 $ 7,000.00 $ 7,000.00 30 $ 146,110.50 )0 $ 50.00 $ 73,1 O0.00 )0 $ 160.00 $ 85,440 ..00 )~ $ 160.00 $ 6/q.00 )0 $ 23.30 $ 254 .... 60 )0 $ 75.00 $ 3,975.00 )O $ 16.00 $ 5,888.00 )0 $ 250.00 $ 1,500.00 )0 $ 90.00 $ 20,160.00 )0 $ 140.00 $ 78,40.0.00 )0 $ 190.00 $ 172,900.00 )0 $ 650.00 $ 28,600.00 )0 $ 750.00 $ 101,250.00 )0 $ 750.00 $ 43,575.00 )0 $ 650.00 $ 402,220.00 )0 $ 325.00 $ 33,475.00 )0 $ 325.00 $ 62,400.00 )~ $ 93.00 $ 277,512.00 )0 $ 40.00 $ 17,600.00 )0 $ 130.00 $ 192,400.00 )0 $ 1,855 10 $ 6,500.00 $ "52,000.00 }0 $ 600.00 $ 8,400,00 )0 $ 500.00 $ 500.00 K $ 10,000.00 $ "10,000.00 IO $ 70,900.00 b(:) $ .3,577,463.80 ~0 $ 5.00 $ 15,850.00 ~0 $ 5.00 $ 7,125.00 REBCON, INC. 1868 W. NORTHWEST HWY. DALLAS, TX 75220 Unit Cost Total Cost $ 5,000.00 $ 5,000.00 $ 119,580.30 $ 45.00 $ 65,790.00 $ 170.00 $ 90,780.00 $ 170.00 $ 680.00 $ 19.00 $ 207,328.00 $ 70.00 $ 3,710.00 $ 3.00 $ 1,104.00 $ 100.00 $ 600.00 $ 130.00 $ 29,120.00 $ 160.00 $ 89,600.00 $ 170.00 $ 154,700.00 $ 650.00 $ 28,600.00 $ 550.00 $ 74,250.00 $ 600.00 $ 34,860.00 $ 380.00 $ 235,144.00 $ 230.00 $ 23,690.00 $ 200.00 $ 38,400.00 $ 77.00 $ 229,768.00 $ 33.00 $ 14,520.00 $ 140.00 $ 207,200.00 $ 1,529,844.00 $ 6,000.00 $ 48,000.00 $ 520.00 $ 7,280.00 $ 430.00 $ 430.00 $ 9,000.00 $ 9,000.00 $ 64,710.00 $ 3,367,382.40 $ 7.00 $ 22,190.00 $ 6.00 $ 8,550.00 WA #94093 Page 4 of 5 Wier &Associates, Inc. 4300 Beltway Place, Suite 130 Arlington, TX 76018 METRO 817/467-7700 PAVING AND DRAINAGE IMPROVEMENTS DENTON TAP ROAD COPPELL, DALLAS COUNTY, TEXAS RECEIVED: 10:00 a.m., April 30, 1998 Description Quantity Unit Unit Cost 3 6" Lime Stabilized Subgrade 1,905 SY $ 2.00 4 Hydrated Lime 28.6 SY $ 95.00 5 12' Wide 6" 3000 PSI Conc. Hike &Bike Trail 1,61 3 SY $ 28.00 6 14" 3000 PSI Concrer. e Hike & Bike Trail 44 SY $ 35.00 7 6' Wide Gravel Jogging Path 240 SY $ 30.00 8 4" Topsoil & Hydromulch 1 LS $ 1,030.00 9 6" 3000 PSi Concrete Riprap 57 SY $ 28.00 10 12"to 18"Dia. Rock Rubble Riprap 35 SY $ 60.00 11 3" Schedule 40 PVC Conduit 48 LF $ 4.00 12 18" RCP Class III 65 LF $ 38.00 13 Special Grate Inlet 1 EA $ 1,200.00 14 18" Type "B" Headwall 1 EA $ 1,000.00 15 O' to 4' Gravity Retaining Wall 28 LF $ 60.00 16 4' to 6' Gravih/Retaining Wall 80 LF $ 70.00 17 Pedestrian Handrail 86 LF $ 50.00 18 Special Bridge Rail 76 LF $ 100.00 19 Single Reflective Yellow Painted Stripe 1,522 LF $ 1.00 20 Single Reflective White Painted Stripe 406 LF $ 1.00 21 24" Reflective White Painted Stop Bar 2 EA $ 200.00 22 24"x24" Stop Sign 2 EA $ 270.00 23 Stop Ahead Sign 2 EA $ 270.00 24 Trench Safe~y 65 LF $ 1.00 25 Inlet Treatment 1 EA $ 150.00 26 Reduce 5' Wide 4" 3000 PSi Conc. Sidewalk -86 SY $ 22.00 TOTAL ALTERNATE BID CONST. TOTAL BASE+ALTERNATE COST WORKING DAYS BID ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST Total Cost $ 3,810.00 $ 2,717.00 $ 45,164.00 $ 1,540.00 $ 7,200.00 $ 1,030.00 $ 1,596.00 $ 2,100.00 $ 192.00 $ 2,470.00 $ 1,200.00 $ 1,000.00 $ 1,680.00 $ 5,600.00 $ 4,300.00 $ 7,600.00 $ 1,522.00 $ 406.00 $ 400.00 $ 540.00 $ 540.00 $ 65.00 $ 150,00 $ (1,892.00) $ 110,342.50 $ 2,867,358.80 TABULATION ED BELL CONSTRUCTION P.O. BOX 540787 DALLAS, TX 75354 Unit Cost Total Cost 00 $ 2.00 $ 3,810.00 20 $ 100.00 $ 2,860.00.. 00 $ 30.00 $ 48,390.00 00 $ 35.00 $ 1,540.00 00 $ 40.00 $ 9,600.00 00 $ 1,000.00 $ 1,000.00 00 $ 60.00 $ 3, 00 00 $ 100.00 $ 3,Sud.00 00 $ 3.50 $ 168.00 oo $ 70.00 $ 4,550.0.o- 00 $ 3,000.00 $ 3,000.00 O0 $ 2,000.00 $ 2,000.00 O0 $ 87.00 $ 2,436.00 00 $ 155.00 $ 12,400.00 00 $ 52.00 $ 4,472.00 E}0 $ 155.00 $ 11,780.00 20 $ 0.50 $ 761.00 60 $ 0.50 $ 203.00 O0 $ 150.00 $ 300.00 30 $ 300.00 $ 600.00 30 $ 300.00 $ 600.00 50 $ 2.00 $ 130.00 30 $ 75.00 $ "7~,.0.__.~0 30)! $ 22.00 $ (1, .00.__.]) 50 $ 138,678.00 30 $ 3,716,141.80 !70 270 REBCON, INC. 1868 W. NORTHWEST HWY. DALLAS, TX 75220 Unit Cost Total Cost 4.00 $ 7,620.00 92.00 $ 2,631.20 30.00 $ 48,390.00 110.00 $ 4,840.00 16.00 $ 3,840.00 10,000.00 $ 10,000.00 45.00 $ 2,565.00 70.00 $ 2,450.00 4.00 $ 192.00 50.00 $ 3,250.00 1,400.00 $ 1,400.00 3,400.00 $ 3,400.00 85.00 $ 2,380.00 150.00 $ 12,000.00 60.00 $ 5,160.00 140.00 $ 10,640.00 1.10 $ 1,674.20 1.10 $ 446 170.00 $ 340.00 380.00 $ 760 380.00 $ 760.00 1.10 $ 71.50 210.00 $ 210.00 17.00 $ (1,462.00) $ 154,298.50 $ 3,521,680.90 WA #94093 Page 5 of 5 Ken Griffin, Director of Engineering and Public Works, made a presentation to the nell, di~ussing the extent of the trails involved with the project and advising he would like to add in the landscaping that had been removed as the CRDC may be willing to help with the cost because of the trails. Councilmember York moved to approve awarding Bid]Contract ~Q-0498-02 for the construction of Denton Tap Road from Cottonwood Creek to State Highway 121 Bypass to Robcon, Inc. in the amount of $3,572,687.90; and authorizing the Mayor to sign. Councilmember Sturges seconded the motion; the motion carried 7~0 with Mayor Pro Tem Tunaell and Councilmembers Garcia, Sturges, Keenan, Stover, Wheeler and York voting in favor of the motion. 34. City Manager's Report. There was no report under this item. 35. Mayor's Report. Mayor Sheehan congratulated the new Councilmembers. Mayor Sheehan reminded everyone that Students in Government would be conducted in the Council Chamber on Wednesday, May 13th. Mayor Shoeban advised that the Y.M.C.A. would hold thok groundbreaking on May 14th at 3:00 p.m. Mayor Sheehan asked Council to think about appointments to the D/FW Task Force. Mayor Sheehan reminded everyone of the Chamber Luncheon to be held on May 20th to honor City Staff. F. Councilmember York reminded everyone of the Arts Extravaganza on Thursday. Councilmember Sturges advised that he, Mayor Pro Tem Tunnell and City Manager Jim Witt had attended the Texas Challenge in Houston on Friday, May 8th. City Secretary Kathleen Roach reminded everyone that early voting for the runoff election would begin May 13th. CM0S1298 Page 16 of 17