Big Cedar-CS 920629 (2)COPPELLPUBLICWORKS
MEMORANDUM
June 29, 1992
Larry Davis, Construction Inspector
ReyGonzales, Streets Superintenden~
Big Cedar Preliminary Walk Thru
Please see attached list for deficiencies and provide a
copy to the contractor. Provide me with a 24 hour notice
for the follow-up.
If you have any questions please advise.
RG/dg
CEDAR.RG
PRELIMINARY WALK-THRU 6-26-92 "BIG CEDAR"
PUNCH LIST
Check joints- seal still low in spots
Random cracks- 2 (1 on Leigh Crt./1 on Brock)
Mud Ball/deformation of concrete near & on Brock
Grout around 1st pipe connection in inlet on the north side of
Brock
Pavers incomplete
NOTE=
Cobble Rip-rap used at outfall of RCP- may not stop
erosion
Letter concerning access from project Engineer to City
Engineer needs to be copied to Public Works.
CITY OF COPPELL
PUBLIC WORKS
HAND WRITTEN MEMORANDUM