Loading...
Westhaven-CS120525 DEVELOPMENT FEES PROJECT NAME: Westhaven Addition ENGINEER: ORIGINATION DATE: 5/25/2012 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE Water Impact Fee Wastewater Impact Fee Park Fee Roadway Impact-Zone Street Sign Street Light Construction Inspection EG or Bore Permit Overtime Inspection Water Tap Inspection $0.00 Wastewater Tap Inspection $0.00 Water Meter (Domestic) $0.00 Water Meter(Fire/Irrig) $0.00 Meter Deposit (Domestic) $0.00 Meter Deposit (Fire/Irrig) $0.00 Utility Final Inspection $0.00 Subtotal to Eng. $0.00 $0.00 $0.00 1 Total Fees Fees Paid Amount Owed TOTALS $0.00 $0.00 $0.00 NOTES Prior To Construction Date Received Prior To Final Acceptance Erosion Control Approved As Built Plan Recd. E.P.A.-N.O.I. Recd. Paving Bond Recd. Const. Plan Approved Utilities Bond Recd. Erosion Control Maint. Flood Study Review $3,500.00 JOY D. MEYER 32-61799 4399 illo BRAD S. MEYER 700 SHADOW GLEN DR. PH. 817-329-5610 SOUTHLAKE, TX 76092-7234 DA f E $ 3,s--Oo,00 7-1-ffit'i--,/ , /:-/,--.47 /-1(JA-o,7,-----lv 4-- A--Z'a ---„,,„ n , CHASE WMorgan Chase Bank,N.A. www Chase com ----7 MEMO , 7 ::;>,--- ,,, / - -- - -- - - - . , \ RECEIPT Date ij I/ C:, / i 2. 082S37 Received From E.f A-0 A k'k)C k- i- 1,- Address w csT fi Avrkl D o i 1 Jr- to sv / grog: -Tivit4 -s(i ic?- -TR iur:› Dollars$315-00,06 \ For Fi ow e _____ r.c\14 ,...1 (LL-orviR) A., Tit , ung ACCOUNT HOW PAID cv AMT OF CASH ACCOUNT co 3 AMT PAID, i ,, ) CHECK Eil4.7(767/ :., A 1 BALANCe ' MONEY ORDER 0 ' By i --" '\A-tfr ‘ DUE CREDIT CARD 0 ,