Loading...
GTE (Clear C2)-CS120503 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-171R3-HC, GTE Shared Services Addition (Clear C2 Office), a zoning change request from PD-171-HC (Planned Development-171-Highway Commercial) to PD-171R3-HC (Planned Development-171 Revision 3-Highway Commercial), to revise the Concept Site Plan on 9.74 acres of property and attach a Detail Site Plan for a 11,077-square-foot office building on 2.09 acres of property located on the north side of Canyon Drive, east of S.H. 121, at the request of DFW Canyon Partners, LTD, being represented by John Taylor, Azimuth Architecture. STAFF REP.: Gary Sieb PROJECT ID# PD-12-0016 DRC DATE: April 26, 2012 and May 3, 2012 CONTACT: Kenneth M. Griffin, P.E., Dir. of Engineering/Public Works 972/304-3686 FINAL COMMENT STATUS: PRELIMINARY REVISED  AFTER P&Z 1. Additional Comments during detailed engineering plan review. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: GTE Shared Services Addition, Lots 1R1A & 1R1B, Block 1, Replat, being a replat of Lots 1R1 & 1R2 of the GTE Shared Services Addition, which contains 9.74 acres of property, to establish a fire lane and utility easements to support the development of a 11,077-square-foot office building on Lot 1R1B, which contains 2.09 acres of property located on the north side of Canyon Drive, east of S.H. 121, at the request of DFW Canyon Partners, LTD, being represented by John Taylor, Azimuth Architecture. STAFF REP.: Gary Sieb PROJECT ID# RP-12-0017 DRC DATE: April 26, 2012 and May 3, 2012 CONTACT: Kenneth M. Griffin, P.E., Dir. of Engineering/Public Works 972/304-3686 FINAL COMMENT STATUS: PRELIMINARY REVISED  AFTER P&Z 1. No Comments