Arbor Manors-CS120518 dómaI
4
F 9
A S I
May 18, 2012
Larry Jackson
David Weekley Homes
3301 N. I-35
Carrollton TX 75007
RE: Arbor Manors
Two-Year Maintenance Bond Release
Dear Mr. Jackson:
Representatives of the City of Coppell have performed an inspection of paving and utilities for the
referenced project to coincide with the end of the two-year bond term.
As of the date of this letter we have found the facilities to be in good condition overall, and the
punchlist of minor items that needed repair has been completed. Erosion control structures/systems
were also inspected and found to be in acceptable condition at this time. The City of Coppell
considers the status of all bonds released.
Sincerely,
Albert Samaniego
Construction Inspector
cc: Michael Garza,E.I.T.
Glenn Hollowell, P.E.,Assistant Director of Public Works
Michael Arellano, Chief Building Official
Tim Oates, Deputy Chief/Prevention
Jennifer Miller, Finance Director
Attachment: original Final Acceptance Letter dated May 7, 2010
A FAMILY COMMUNITY FOR A LIFETIME
255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV