Loading...
Arbor Manors-CS120518 dómaI 4 F 9 A S I May 18, 2012 Larry Jackson David Weekley Homes 3301 N. I-35 Carrollton TX 75007 RE: Arbor Manors Two-Year Maintenance Bond Release Dear Mr. Jackson: Representatives of the City of Coppell have performed an inspection of paving and utilities for the referenced project to coincide with the end of the two-year bond term. As of the date of this letter we have found the facilities to be in good condition overall, and the punchlist of minor items that needed repair has been completed. Erosion control structures/systems were also inspected and found to be in acceptable condition at this time. The City of Coppell considers the status of all bonds released. Sincerely, Albert Samaniego Construction Inspector cc: Michael Garza,E.I.T. Glenn Hollowell, P.E.,Assistant Director of Public Works Michael Arellano, Chief Building Official Tim Oates, Deputy Chief/Prevention Jennifer Miller, Finance Director Attachment: original Final Acceptance Letter dated May 7, 2010 A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV