CiCi's Addition-CS120531 PA
ICOP-st `
c) Pavement markings—striping over concrete curing compound may prevent striping from
adhering, re-striping is recommended after cure has worn off.
d) All work areas must be free of materials & equipment.
e) Rock excavation. Soils report showed no borings in new work area.
1) This estimate is based on completing work in 1 move-in.
g) Sleeves for Irrigation.
h) SWPPP.
TERMS AND CONDITIONS
1. PAVECON, Ltd., (PAVECON) will carry workmen's compensation insurance covering its employees
and shall provide public liability and property damage insurance.
2. Any changes from the specifications or modifications of the terms of this contract shall be set put in
writing and signed by both parties.
3. This proposal expires fifteen (15) days from the date hereof but may be accepted at any later date at the
sole option of the Company.
4. No work shall be performed prior to the location of all utility lines as located by DIG TESS
services. The owner shall be responsible for the location of any irrigation lines, private electrical
lines and any substructures unknown to PAVECON, Ltd.
By accepting this proposal, Owner agrees to indemnify and to hold PAVECON, Ltd. harmless from all
claims, including its reasonable attorneys' fee incurred in defending any claim, resulting from damages
to any utility line, irrigation line, private electrical, or sub structure not identified or clearly marked. Any
damage to clearly marked utility lines, irrigation line, private electrical lines, or sub structures shall be
the responsibility of PAVECON, Ltd.
5. Unless a lump sum price is to be paid for the foregoing work and is clearly so stated it is understood and
agreed that the quantities referred to above are estimates only and that payment shall be made at the stated
unit prices on the actual quantities of work performed by PAVECON as determined upon completion of the
work.
6. PAVECON shall not be responsible for any damage to or deterioration of any of our work, whether
completed or in process, resulting from any cause or causes beyond our control, but not limited to failure
of subgrade, including soil volume changes, or failure of inadequacy of any labor or materials not
furnished and installed by us, whether or not such failure or inadequacy was or could have been known at
the time our work was undertaken.
7. PAVECON is not responsible for removing vehicles from repair areas. PAVECON will notify you in
advance and you must make arrangements to have vehicles removed at your expense.
P.O. Box 535457,Grand Prairie,TX 75053 • 3022 Roy Orr Blvd.,Grand Prairie,TX 75050
Office: 972.263.3223 • Fax: 972.263.6551
PA : 2
8. In the event all work under this contract is not completed in one operation, Company shall be paid in
full for all items of work completed upon the completion thereof. Any work under this contract for
which PAVECON has not received a "work order" calling for completion within one year from the date
of this agreement will be subject to renegotiations of prices, or cancellation at PAVECON's option.
9. Terms of Payment - Payment in full for all work performed hereunder during any month shall be made
no later than the tenth day of the month next following. Final and complete payment for all work
performed herein shall be made upon completion of such work and receipt of our invoice. Interest at the
rate of(18) percent per annum shall be charged you and paid by you on all unpaid balances from the due
date to the date of receipt of payment by PAVECON. Reasonable attorney's fees and cost of collection
shall be charged you and paid by you, if incurred by us.
ACCEPTED: COPY PAVECON, LTD.
Tim Wegienka
Senior Project Manager
TW3918R 5/15/12
P.O. Box 535457,Grand Prairie,TX 75053 • 3022 Roy Orr Blvd.,Grand Prairie,TX 75050
Office: 972.263.3223 • Fax: 972.263.6551