Royal Oaks-CS120601 dô•iFEjI
A 8 a
June 1, 2012
Marc Zett
Bright Realty
4228 N. Central Expwy#300
Dallas TX 75206
RE: Royal Oaks Subdivision
Final Acceptance
Dear Mr. Zett:
Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for
the referenced project. The two-year maintenance bonds and record drawings have been received.
Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion
Control Bond will also be two years from the date of this letter.
You may notify the MS4 (City of Coppell) at any time during the two-year maintenance period if
stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a
Notice of Termination(NOT)to discontinue coverage under the SWPPP permit.
A follow-up inspection of the facilities will be conducted prior to the lapse of the two-year bond
period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thanks
for your cooperation during the course of this project.
Sincerely,
74./a7(1,
Rick O'Dell
Construction Inspector
Office Phone: (972) 304-7090
Fax: (972) 304-3570
cc: Ken Griffin, P.E., Director of Engineering& Public Works
Glenn Hollowell, P.E., Asst. Director of Public Works
Michael Arellano, Chief Building Official
Tim Oates, Deputy Chief/Prevention
Jennifer Miller, Finance Director
A FAMILY COMMUNITY FOR A LIFETIME
255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV