Loading...
ST0501-LR120531 JUN-04-2012 00: 19 P.01/01 A . Anr! Texas cMT, Into Construction Materials Testing Post ifs Fax Note 7671 Date ipagt10, /� and Environmental Consulting To L- /1 gY p n v l c• From Texas c`'`T j Co./Dept.j, sfre_ro7g/ ca. & 1>_a`!6 10044 Monroe Drive • Dallas, Texas 75229 'v '`�S Lt (214) 352 Phone#61.-P," 7�y /off(` c^7 / '7 /4 364-3� 34 Phone#.2.14,352•.g.7S , Fax it 972-304.`35 6 Fax#z/4•!3CZ,6,72 REPORT OF CONCRETE MIX OBSERVATION Report Date: May 31, 2012 Date Concrete Placed: May 3, 2012 Standard 6"x12"Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Deforest Road Reconstruction - • Concrete Report No.: 21 Contractor: California Construction Project No.: ST-05-01 Concrete Supplier and Plant: Redi-Mix Concrete/P259 Location of Placement: Retaining Wall Footing from Sta. 7+90 to 8+85 ,�.,, MATERIALS Source/ SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 10L11504 Time.,8(rnple Batched: 11:52 AM Cement: ■ Tillie Sampled: 12:40 PM . Fly Ash: v,,..''` Sample Location: Sta. 8+75 ° Truck/Ticket No: 1371 /25465865 Coarse Aggregate: i'}j '''''{ Temperature: Intermediate Aggregate: / 1/:, Ambient Range: 83°F Fine Aggregate: Concrete Range: 86°F Admixtures: Slump Range(inches): 4.5 Weather Conditions: Partly Cloudy.• • 1 Time Started: 8:30 AM 11:30 AM 2 • Time Completed: 10:30 AM 2:45 PM Added Water: 11 Gallons Sample Air Content(%): 5.0 Total Cubic Yards Placed: 10 Required Strength(Lbs./sq.in.): _ 3,600 Specimen Measured Age Date Total Load Compressive Strength Number Slump(in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) 'r arks DFR 81 7 5/10/12 129,560 4,580 DFR 82 4.5 28 5/31/12 153,440 E df/ D • FR 83 28 5/31/12 153,820 i • DFR 84 H Hold Test Methods Utilized Fracture Regular R� ASTM C-31, C-39, C-143 (Unless Cylinders M 'e 3°' R ( Noted Otherwise) / Remarks and/or Distribution: 1 �� _cc: Mr. L Davis - L //arty Ctty of C fJk , Phone: 972-304-3684; via Fax: 972-304-357th Mr. George Marshall-City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot-Burgess &Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill @Ti eoP lag,cet Mr. Walter Mitchell - Tiseo Paving Company, via E-mail: barnobas @yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com t52:k4gdec____ Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: All letters and reports are for the exclusive use of the cheat to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products_ TOTAL P.01