Loading...
Gateway BP(2.5)-CS120606 T H E C I T Y O F COPPELL A 5 1 June 6, 2012 RE: Availability of City Utilities (Gateway Business Park, Phase 2, Lot 1 Block B) NEC of Freeport Parkway and Dividend Dr. Dear Mr. Nguyen: This letter is in response to a request I received from you concerning the availability of utilities to the referenced property. To the best of my knowledge the utilities are as follows: WATER: There is an existing 12" water line in the east ROW of Freeport Parkway and the south ROW of Wrangler Dr. There is a 16" water line in the north ROW of Dividend Dr. SANITARY SEWER: There is a 10" sanitary sewer line on the southwest corner of this property at the intersection of Freeport and Dividend. There is also a 12" sanitary sewer in the west ROW of Freeport Parkway. STORM DRAINAGE: There is an existing 54" storm drain that is located in the center of the ROW on the north, west and south side of this property that is stubbed out to this property. During development planning for the property, you should determine if the existing utilities available to this site are adequate to serve your proposed development. You may contact me at your convenience if you have any questions or comments. Sincerely, /mow is • za, P.E. Civil Engineer Office Phone: (972) 304-3679 Fax: (972) 304-3570 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673